Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Veterans Affairs was posted on March 22, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S208--NAD-C08390000-Fertilization-FY21 New - North Atlantic District -C08390000-FERTILIZATION CONTRACT for Culpeper National Cemetery

Awarded
36C78621Q0133Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
SLED
Santa Cruz Gateway Landscape Improvements
Solicitation # ED-0330
The City of Santa Cruz, through the Office of Economic Development and Housing, is soliciting bids for the Santa Cruz Gateway Landscape Improvements project located at Ocean Street and Plymouth Street. This public works project involves a comprehensive scope of work including demolition, site and soil preparation, irrigation installation using 2-inch Schedule 40 PVC, planting, concrete work, lighting, and low-voltage electrical work. The contract will be awarded to the lowest responsive and responsible bidder on a firm-fixed fee basis, with a required project completion timeline of 45 working days. Bids must be submitted electronically via the OpenGov portal, with the final deadline extended to November 5, 2026, at 5:00 pm. Qualified contractors must possess a Prime B license and comply with various regulatory requirements, including the Living Wage Ordinance, Equal Employment Opportunity regulations, and DIR registration for prevailing wage compliance. Bidders are required to provide a bid security of at least 10 percent of the bid amount, and the successful awardee must provide a 100 percent performance bond and a payment bond of at least 50 percent if the contract is under 1 million dollars. Evaluation factors include the complete submission of the bid form and available local business preferences, offering a 2 percent preference for businesses with a local office and an additional 4 percent for those with local ownership. All work must adhere to the City's 2002 Standard Specifications, 2025 Standard Details, and applicable ADA and ABA accessibility standards.
Economic Development and Housing

POSTED

about 9 hours ago

DEADLINE

in 7 days
NAICS: 561730
New
SLED
IFB 2027-10-29 Snow/Ice removal
Solicitation # 2027-10-29
Encompass Community Supports (ECS) is soliciting bids for snow and ice removal services across 12 different sites in five Virginia counties. This Invitation for Bids (IFB 2027-10-29) will be awarded to the lowest responsive and responsible bidder based on a Unit Price Schedule that must include all labor, materials, equipment, and insurance. The contract period runs from the date of award through November 18, 2031, with four optional one-year renewal periods. Bids must be submitted via eVA or mailed to the Culpeper, Virginia office by November 19, 2026, at 2:00 P.M. The scope of work requires pre-treatment of all lots the day or night before snowfall and triggers service once accumulation reaches two inches, and every two inches thereafter. Response times are prioritized by facility type, with critical residential facilities requiring removal within two hours and office facilities within six hours. Notably, the use of rock salt is strictly prohibited at all locations, and contractors must provide approval for their proposed ice-melt products and corresponding Material Safety Data Sheets. Contractors must provide a certificate of insurance naming ECS as an additional insured and maintain records for ten years following final payment. Bidders are required to submit a Small Business Subcontracting Plan and certify their licensure and debarment status. Payment is processed on a monthly basis with standard terms of 30 days. ECS retains the right to cancel the contract with 30 days written notice and holds the authority to terminate the agreement if performance standards are not met.
Encompass Community Supports

POSTED

about 10 hours ago

DEADLINE

in 21 days

General Info

Contract Value

$292,450

NAICS

561730 - Landscaping Services

Place of Performance

Department of Veterans Affairs Culpeper National Cemetery 305 U.S. Avenue, Culpeper, VA, 22701, USA

Set-Aside

NONE

Award Issued Date

Documents

2

15-4283.pdf

PDF

36C78621Q0133.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → National Cemetery Administration (36C786)
Contacts1 person available
OfficeQUANTICO, VA, 22134, USA
Office AddressQUANTICO, VA, 22134, USA
Contacts
National Cemetery AdministrationDepartment of Veterans Affairs

Full Description

Show more
RFQ FOR COMMERCIAL ITEMS GENERAL INFORMATION Document Type: Combined Synopsis Solicitation Solicitation Number: 36C78621Q0133 Post Date: 3/22/2021 Original Response Date: 04/05/2021 at 3:00 pm Applicable NAICS: 561730 Classification Code: S208 Set Aside Type: SDVOSB/VOSB/SB Tiered Evaluations Period of Performance: Date of Award through 4/7/2021 with four one year option periods. Issuing Contracting Office: Department of Veterans Affairs National Cemetery Administration, Contract Services 18434 Joplin Road Triangle, VA 22172 Place of Performance: Culpeper National Cemetery 305 U.S. Avenue Culpeper, Va. 22701 Attachments: Wage Determination for 2015-4283 Rev. No. 17 Dated 12/21/2020 This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ), solicitation number 36C78621Q0088. This solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2019-01 Effective 20 Dec 2018. SOLICITATION NOTICE OF TIERED EVALUATIONS This procurement is set-aside based on an order of priority as established in 38 U.S.C. 8127. TIERED EVALUATIONS INCLUDING SMALL BUSINESS CONCERNS: This solicitation is being issued as a tiered evaluation for SDVOSB concerns, or in the alternative, a tiered evaluation for VOSB concerns, or in the alternative, a set-aside for other small business concerns with HUBZone small business concerns and 8(a) participants having priority. If award cannot be made, the solicitation will be cancelled, and the requirement resolicited. Any vendor claiming SDVOSB or VOSB status must be registered as such at https://www.vip.vetbiz.va.gov/ before the solicitation closes. Any offer rendered, of which SDVOSB or VOSB status is claimed which are not registered, will be considered non-responsive and will not be accepted. The applicable North American Industrial Classification System (NAICS) code for this procurement is 561730, with a business size standard of $7.5 million. This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The U.S. Department of Veterans Affairs, National Cemetery Administration, anticipates the award of a Firm Fixed Priced Contract. Scope: The contractor shall be responsible for providing Herbicide / Fertilization Turf Application Services at Culpeper National Cemetery. Responses to this Request for Quotation (RFQ) are due to the Contracting Officer no later than 3:00 pm on 4/5/2021. Responses to this announcement will result in a Firm-Fixed Price Contract and the Government intends to make award without discussions. All information submitted in response to this announcement is voluntary and the Government will not pay for information provided nor will it compensate any respondent for any cost incurred in developing information provided for the Government. Offerors are responsible for obtaining all amendments or additional information concerning this announcement at beta.sam.gov. All questions regarding this solicitation are to be submitted to the contracting officer, via email, no later than 3:00 PM on 3/29/2021. Questions will not be addressed using the telephone. Answers to questions will be posted on the vendor portal. Proposal Format and Submission Information: Offers must be submitted on company letterhead. All offerors shall include the following information as part of their quote: Legal Business/Company Name (as listed in beta.sam.gov) DUNS Number Point of Contact Name Telephone number Email Address -Pricing shall be submitted as requested in the Schedule of Supplies/Services -Technical Package for Evaluation -Past Performance Questionnaire Proposals shall be submitted via the Vendor Portal. See below for registration and submission information. VENDOR PORTAL USAGE INFORMATION The Vendor Portal is a module of the Electronic Contract Management System (eCMS) that serves as a central location that allows for communication between VA Acquisition Staff and potential vendors. Vendors will need to visit the Vendor Portal (https://www.vendorportal.ecms.va.gov) to register. In the event an Offeror is unable to register for a user account and/or submit a proposal through the Vendor Portal prior to the proposal closing date, the vendor is to contact the VAAS helpdesk at +1 (555) 000-0000, or via email at contact@example.gov. If the deadline hits as you are uploading your documents, the portal will shut without giving notice it is doing so. The upload appears to be happening however, it never finishes. Once registered, vendors will be able to access/edit their profile, view solicitations/awards and submit bids/proposals as instructed. Vendors can submit questions via the Vendor Portal which can be answered directly within the Vendor Portal. Submission of Quotes: All quotes must be submitted through the Department of Veterans Affairs Electronic Management System (eCMS) Vendor Portal website to be considered for Award. Quote transmission/uploads must be completed by the deadline for submission of Quotes. Offerors unable to submit a quote through VA eCMS Vendor Portal, may submit their quotes via email to: contact@example.gov provided the VA eCMS Vendor Portal registration requirements have been fulfilled AND Offerors have contacted the VAAS helpdesk for assistance in their quote submission. A copy of the email correspondence with the VAAS helpdesk shall be forwarded to the Contracting Officer Paul Zagaruyka via email at contact@example.gov as proof of email correspondence. If a request for assistance with the VAAS helpdesk proves unsuccessful in an Offeror s ability to submit a quote prior to the closing date, via the Vendor Portal, the Offeror shall submit to the Contracting Officer correspondence that contains the date, time, and name of helpdesk representative the Offeror contacted to include the reasons why the Offeror could not submit a quote via the Portal. This document shall be submitted with the Offeror s quote. In the event an Offeror has not requested quote submission assistance from the VAAS help desk prior to the closing date, nor has submitted correspondence that identifies reasons why the Offeror could not submit a quote via Vendor Portal, the Offeror will be considered technically non-responsive and the quote, if late, will not be accepted. FYI: If after documents have been submitted, the Offeror decided to revise a document and resubmit it, the instructions in the VENDOR PORTAL GUIDE must be followed or risk all original documents being deleted. Any proposals not received through the vendor portal in response to this announcement will be rated as technically unacceptable and removed from consideration. Questions pertaining to this announcement shall be sent by email to: contact@example.gov. Telephone inquiries will not be accepted. Evaluation Process: The Government intends to award a firm fixed price contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation that provides the best benefit to the Government, price and other factors considered. Offers will be evaluated on the basis of lowest priced, technically acceptable offer. The following factors shall be used to evaluate offers: Pricing: The sum of all the CLINs will represent the total evaluated price. Proposed price must be determined to be fair and reasonable in order to be eligible for award. Technical Acceptability Demonstrated experience performing this requirement Demonstrated qualifications to perform services Use of Sub-Contractors SDVOSB Status verification in CVE Proposal Contents: -Pricing shall be submitted as requested in the Schedule of Supplies/Services. -Technical Package for Evaluation The following shall be included as part of the offeror s submission: Experience of company and subcontractors anticipated to perform work under this contract Managerial & Technical Qualifications of key personnel Qualifications of any proposed sub-contractors and the percentage of work they will be performing. Solicitation Provisions and Contract Clauses The full text of FAR/VAAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. https://www.va.gov/oal/library/vaar/ The following solicitation provisions apply to this acquisition: FAR 52.212-1 Instructions to Offerors Commercial Items (Oct 2018) FAR 52.204-7 System for Award Management (Oct 2018) FAR 52.204-16 Commercial and Government Entity Code Reporting (Jul 2016) VAAR 852.270-1 Representatives of Contracting Officers (Jan 2008) Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3 Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required. The following solicitation clauses apply to this acquisition: The clause at 52.212-4, Contract Terms and Conditions Commercial Items (Oct 2018) applies to this acquisition. Addendum to FAR clause 52.212-4, Contract Terms and Conditions Commercial Items (Oct 2018): FAR 52.204-13 System for Award Maintenance (Oct 2018) FAR 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016) FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) VAAR 852.203-70 Commercial Advertising (Jan 2008) VAAR 852.219-10 VA Notice of Total Service-Disabled Veteran-Owned Small Business (Jul 2016) (DEVIATION) VAAR 852.219-74, Limitations on Subcontracting Monitoring and Compliance (Jul 2018) VAAR 852.232-72 Electronic Submission of Payments Requests (Nov 2012) VAAR 852.237-70 Contractor Responsibilities (Apr 1984) The clause at 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders (Jan 2019) applies to this acquisition. The following subparagraphs of FAR 52.212-5 are applicable: (b)(4), (b)(22), (b)(25), (b)(27), (b)(28), (b)(30), (b)(33)(i), (b)(42), (b)(49), (b)(56), (c)(2), (c)(3), (c)(8), and (c)(9). (c)(3) 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67) SUPPLIES OR SERVICES AND PRICES/COSTS PRICE SCHEDULE: The Contractor shall furnish all supervision, labor, equipment, materials and supplies necessary to provide Turf Fertilization and Pre / Post-Emergent Crabgrass / Broadleaf Weed Control, Turf Aeration & Over seeding Services at the Culpeper National Cemetery. Performance includes six (6) scheduled applications of fertilizer and herbicides / aeration over seeding. POST AWARD CONFERENCE: Prior to commencement of work, contract awardee is required to make an appointment for a conference with the COR and/or Contracting Officer to assure that all parties understand all contractual obligations and the role that each party serves. SITE VISIT: If you plan to conduct a site visit / inspection at the Culpeper National Cemetery, YOU MUST CONTACT one of the following cemetery personnel to make arrangements: Jason Hogan, Cemetery Director, Culpeper, National Cemetery +1 (555) 000-0000 Willie Davis, Foreman, Culpeper National Cemetery . +1 (555) 000-0000 Facsimile # +1 (555) 000-0000 The period of performance is from 8 April 2021 (or Date of Award whichever is sooner) through 7 April 2022, with four (4) one (1) year renewal options. All services shall be provided in accordance with Section A (Application Schedule & General Requirements) including all specifications, terms and conditions of the contract. CULPEPER NATIONAL CEMETERY Base Year: April 8, 2021 or from date of award thru April 7, 2022 CLIN Description Qty Unit Unit Cost Total Cost 001 Turf Application #1 (Application Date: April 10th 15th): Combination post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain and a pre-emergent control for weed grasses such as crabgrass and goose grass applied in liquid form. 1 Job $_________ $___________ 002 Turf Application #2 (Application Date: May 15th 20th): Combination pre/post emergent control for annual weed grasses and broadleaf weeds applied in liquid form along with a granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $___________ 003 Turf Application #3 (Application Date: August 10th 15th): Combination post emergent control for annual weed grasses (crabgrass), sedge (nut sedge) grasses and broadleaf weeds applied in liquid form. 1 Job $_________ $___________ 004 Turf Application #4 (Application Date: September 1st 5th) Core Aeration of turf including between all headstones with soil cores removed to a depth of 4 inches. After completion of soil aeration, an over seeding of the cemetery turf will be completed utilizing a Turf Type Tall Fescue mixture applied from a broadcast spreader at a rate of 8-10 lbs. / 1,000 sq. ft. A granular turf fertilization will also be applied using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $__________ 005 Turf Application #5 (Application Date: October 15th 20th): Post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain applied in liquid form. 1 Job $_________ $__________ 006 Turf Application #6 (Application Date: November 1st 5th): Granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft. 1 Job $ ________ $ __________ Grand Total Cost: $ _______ Option Year I: April 8, 2022 thru April 7, 2023 CLIN Description Qty Unit Unit Cost Total Cost 101 Turf Application #1 (Application Date: April 10th 15th): Combination post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain and a pre-emergent control for weed grasses such as crabgrass and goose grass applied in liquid form. 1 Job $_________ $___________ 102 Turf Application #2 (Application Date: May 15th 20th): Combination pre/post emergent control for annual weed grasses and broadleaf weeds applied in liquid form along with a granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $___________ 103 Turf Application #3 (Application Date: August 10th 15th): Combination post emergent control for annual weed grasses (crabgrass), sedge (nut sedge) grasses and broadleaf weeds applied in liquid form. 1 Job $_________ $___________ 104 Turf Application #4 (Application Date: September 1st 5th) Core Aeration of turf including between all headstones with soil cores removed to a depth of 4 inches. After completion of soil aeration, an over seeding of the cemetery turf will be completed utilizing a Turf Type Tall Fescue mixture applied from a broadcast spreader at a rate of 8-10 lbs. / 1,000 sq. ft. A granular turf fertilization will also be applied using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $__________ 105 Turf Application #5 (Application Date: October 15th 20th): Post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain applied in liquid form. 1 Job $_________ $__________ 106 Turf Application #6 (Application Date: November 1st 5th): Granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft. 1 Job $ ________ $ __________ Grand Total Cost: $ _________ Option Year II: April 8, 2023 through April 7, 2024 CLIN Description Qty Unit Unit Cost Total Cost 201 Turf Application #1 (Application Date: April 10th 15th): Combination post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain and a pre-emergent control for weed grasses such as crabgrass and goose grass applied in liquid form. 1 Job $_________ $___________ 202 Turf Application #2 (Application Date: May 15th 20th): Combination pre/post emergent control for annual weed grasses and broadleaf weeds applied in liquid form along with a granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $___________ 203 Turf Application #3 (Application Date: August 10th 15th): Combination post emergent control for annual weed grasses (crabgrass), sedge (nut sedge) grasses and broadleaf weeds applied in liquid form. 1 Job $_________ $___________ 204 Turf Application #4 (Application Date: September 1st 5th) Core Aeration of turf including between all headstones with soil cores removed to a depth of 4 inches. After completion of soil aeration, an over seeding of the cemetery turf will be completed utilizing a Turf Type Tall Fescue mixture applied from a broadcast spreader at a rate of 8-10 lbs. / 1,000 sq. ft. A granular turf fertilization will also be applied using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $__________ 205 Turf Application #5 (Application Date: October 15th 20th): Post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain applied in liquid form. 1 Job $_________ $__________ 206 Turf Application #6 (Application Date: November 1st 5th): Granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft. 1 Job $ ________ $ __________ Grand Total Cost: $ ________ Option Year III: April 8, 2024 through April 7, 2025 CLIN Description Qty Unit Unit Cost Total Cost 301 Turf Application #1 (Application Date: April 10th 15th): Combination post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain and a pre-emergent control for weed grasses such as crabgrass and goose grass applied in liquid form. 1 Job $_________ $___________ 302 Turf Application #2 (Application Date: May 15th 20th): Combination pre/post emergent control for annual weed grasses and broadleaf weeds applied in liquid form along with a granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $___________ 303 Turf Application #3 (Application Date: August 10th 15th): Combination post emergent control for annual weed grasses (crabgrass), sedge (nut sedge) grasses and broadleaf weeds applied in liquid form. 1 Job $_________ $___________ 304 Turf Application #4 (Application Date: September 1st 5th) Core Aeration of turf including between all headstones with soil cores removed to a depth of 4 inches. After completion of soil aeration, an over seeding of the cemetery turf will be completed utilizing a Turf Type Tall Fescue mixture applied from a broadcast spreader at a rate of 8-10 lbs. / 1,000 sq. ft. A granular turf fertilization will also be applied using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $__________ 305 Turf Application #5 (Application Date: October 15th 20th): Post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain applied in liquid form. 1 Job $_________ $__________ 306 Turf Application #6 (Application Date: November 1st 5th): Granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft. 1 Job $ ________ $ __________ Grand Total Cost: $ ________ Option Year IV: April 8, 2025 through April 7, 2026 CLIN Description Qty Unit Unit Cost Total Cost 401 Turf Application #1 (Application Date: April 10th 15th): Combination post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain and a pre-emergent control for weed grasses such as crabgrass and goose grass applied in liquid form. 1 Job $_________ $___________ 402 Turf Application #2 (Application Date: May 15th 20th): Combination pre/post emergent control for annual weed grasses and broadleaf weeds applied in liquid form along with a granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $___________ 403 Turf Application #3 (Application Date: August 10th 15th): Combination post emergent control for annual weed grasses (crabgrass), sedge (nut sedge) grasses and broadleaf weeds applied in liquid form. 1 Job $_________ $___________ 404 Turf Application #4 (Application Date: September 1st 5th) Core Aeration of turf including between all headstones with soil cores removed to a depth of 4 inches. After completion of soil aeration, an over seeding of the cemetery turf will be completed utilizing a Turf Type Tall Fescue mixture applied from a broadcast spreader at a rate of 8-10 lbs. / 1,000 sq. ft. A granular turf fertilization will also be applied using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. 1 Job $_________ $__________ 405 Turf Application #5 (Application Date: October 15th 20th): Post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain applied in liquid form. 1 Job $_________ $__________ 406 Turf Application #6 (Application Date: November 1st 5th): Granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft. 1 Job $ ________ $ __________ Grand Total Cost: $ ________ SUMMARY GRAND TOTAL COST BASE + ALL OPTION YEARS: $ ___________________________________ DESCRIPTION / SPECIFICATIONS / WORK STATEMENT BACKGROUND The Culpeper National Cemetery is located approximately 70 miles southwest of Washington D.C. in the community of Culpeper, VA., with cemetery grounds encompassing approximately 29.5 acres of land. This cemetery is a National Shrine that honors veterans with a final resting place and lasting memorials that commemorate their service to our Nation. The cemeteries receive visitors, hold ceremonies and conduct committal services. Because of their special significance and attention they receive from the public, strict adherence to contract specifications is essential. TYPE & TERM OF CONTRACT The VA shall award a single firm-fixed price / requirements service contract pursuant to this solicitation for commercial items. The contract shall contain one (1) base year and four (4) renewable option years. This contract is SUBJECT TO THE AVAILABILITY OF VA FUNDS. No services shall be performed by the Contractor after April 7th of each year, until the Contracting Officer authorizes such services in writing. PLACE(S) OF PERFORMANCE The Contractor shall furnish all labor, equipment, materials and supplies necessary to provide turf fertilization and broadleaf / crabgrass weed control services to the following VA National Cemeteries: Cemetery Address Acreage Required Services Culpeper national cemetery 305 U.S. Avenue Culpeper, Va. 22701 29.5 Turf Fertilization, Broadleaf Weed/ Pre-emergent Crabgrass Control Applications / Turf Aeration & Over Seeding TURF APPLICATION SCHEDULE Contractor shall provide turf fertilization, pre-emergent crabgrass & post emergent broadleaf weed control services at the Culpeper National Cemetery in accordance with the following Application Schedule: Turf Application Annual Application Date Description #1 April 10th 15th This application will be a combination post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain and a pre-emergent control for weed grasses such as crabgrass and goose grass #2 May 15th 20th This application will be a combination pre/post emergent control for annual weed grasses and broadleaf weeds applied in liquid form along with a granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. #3 August 10th 15th This application will be a combination post emergent control for annual weed grasses (crabgrass), sedge (nut sedge) grasses and broadleaf weeds applied in liquid form. #4 September 1st 5th This application will be a Core Aeration of turf including between all headstones with soil cores removed to a depth of 4 inches. After completion of soil aeration, an over seeding of the cemetery turf will be completed utilizing a Turf Type Tall Fescue mixture applied from a calibrated broadcast spreader at a rate of 8-10 lbs. / 1,000 sq. ft. A granular turf fertilization will also be applied using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 4 lbs. of total fertilizer per 1000 sq. ft. #5 October 15th 20th This application will be a post emergent control for common broadleaf weeds such as dandelion, clover, broadleaf and buckhorn plantain applied in liquid form applied to entire turf acreage. #6 November 1st 5th This application will be a granular turf fertilization using a fertilizer with a 26-0-12 NPK ratio with a minimum 50% slow release SCU (sulfur coated urea). Fertilizer shall be applied to the entire turf acreage at a rate of 5 lbs. of total fertilizer per 1000 sq. ft. APPLICATION REQUIREMENTS Crabgrass Pre-Emergent Application: Contractor shall apply herbicide for pre-emergent crabgrass control at manufactures recommended rate allowable for cool season grasses. Pre-emergent herbicide must be applied with properly calibrated spraying equipment. The contractor shall begin the application after the soil temperature has reached 55 degrees for three consecutive days. This is the time that crabgrass seeds begin active germination in the soil. Any application that is completed before this time may not be as effective in overall crabgrass control. This shall be determined by cemetery staff with the use of a soil thermometer placed at a 1-inch soil depth in various sections of the cemetery to accurately gauge soil temperature. The dates for application listed in the application schedule are only an estimated time frame and could begin earlier or later depending upon the soil temperatures and weather conditions. Herbicide will be applied on all cemetery turf including in between and around the base of all headstones / markers. Second (Split) Crabgrass Application: Contractor shall apply herbicide when treating for pre-emergent crabgrass control at manufactures recommended rate allowable for cool season grasses. Pre-emergent herbicide must be applied with properly calibrated spraying equipment. This application shall occur between 6-8 weeks after initial crabgrass application to help insure full season long control of crabgrass and other weed grasses and should control any early tiller stages of crabgrass that has already germinated. Broadleaf Weed Control: Broadleaf herbicides must be applied with properly calibrated spraying equipment. Post emergent herbicides must control various broadleaf weed species that are common to cool season turf grass such as clover, dandelion, prostrate spurge etc. Applications must be timely and at the proper dosage so that perennial weeds do not go to seed. Herbicide shall be applied to all turf acreage, in burial sections and including areas between and around all headstones and along section perimeters and will be applied in liquid form. Fertilization: Contractor shall apply a granular turf fertilizer, which is specified in the application schedule to all turf areas using a properly calibrated spreader/sprayer. The fertilizer shall have a guaranteed NPK analysis of 24-0-12 and consist of a minimum 50% slow release nitrogen from sulfur coated urea. Fertilizer shall be applied to all turf areas at the times and rates that are listed in the turf application schedule and will be applied in granular form only. The Contractor is not to deviate from this granular form of application for fertilizer. Aeration & Over Seeding: Contractor will core aerate the entire cemetery turf (including in between headstones) beginning in early September. Soil cores will be removed to a depth of 4 inches with a between core spacing of 6 inches and can be left on the soil surface. After aeration has been completed, over seeding will be done with a turf type Tall Fescue mix being used and applied at a rate of 8-10 lbs. / 1000 sq. ft. Seed will be applied using a calibrated broadcast spreader. If aeration equipment cannot get between headstones then contractor will be sure to heavily rake between headstones to remove excessive thatch so that the new grass seed can make good soil contact for better germination results. Since turf between the headstones tends to dry out quicker due to the underground headstone support system and tends to die back, it is imperative that the turf be re established during the aeration / over seeding process. All application methods of herbicides and treatments of annual grasses shall be in strict accordance with manufacturer, Department of Environmental Protection and all applicable federal, state and local laws. All applications must be made in accordance with manufactures label instructions to insure proper rate and timing of application. The contractor shall apply all liquid herbicides no earlier than 6 hours before anticipated rainfall to allow herbicide sufficient time to be absorbed into plant tissue to maximize the herbicide s full potential. Any rainfall that is received within this six-hour time frame after the application shall require the contractor to treat all turf areas a second time at the contractor s expense. Prior to any application, the Contractor shall provide to the COR, a copy of product label for each chemical used and appropriate supporting Material Safety Data Sheets (MSDS). Contracto...

More opportunities from Department Of Veterans Affairs → National Cemetery Administration (36C786)

Same awarding agency

NAICS: 337211
New
Federal
Furniture Tahoma National Cemetery
Solicitation # 36C78627Q0020
Solicitation 36C78627Q0020 is a combined synopsis and request for quotation issued by the Department of Veterans Affairs, National Cemetery Administration, for the purchase, delivery, and installation of new commercial furniture at Tahoma National Cemetery in Kent, Washington. This firm-fixed-price purchase order is a total small business set-aside under NAICS code 337211. The scope of work includes providing desk systems, tables, seating, lockers, and storage for the Administration and Honor Guard buildings, with all work to be completed within 60 days after receipt of order. The contractor is responsible for all unloading, placement, and professional installation, as well as the removal of all packaging debris and the protection of government facilities during the process. The government will award the contract to the responsible offeror who provides the lowest price that is found to be fair, reasonable, and technically acceptable based on a pass/fail evaluation of the submitted technical documentation. Interested vendors must submit their quotations electronically by November 16, 2026, at 4:00 PM PST, organized into three separate PDF volumes: Administrative, Price, and Technical. Requirements include active registration in the System for Award Management and adherence to specific supplemental insurance minimums, including $500,000 for general liability bodily injury and $100,000 for property damage. Delivery is FOB Destination, and contractors must coordinate scheduling at least 14 business days in advance.
Wood Office Furniture Manufacturing

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 811310
New
Federal
J039 - Equipment Maintenance - Golden Gate National Cemetery
Solicitation # 36C78627Q0027
The Department of Veterans Affairs, through the National Cemetery Administration, is issuing a sources sought notice for recurring large equipment maintenance at the Golden Gate National Cemetery in San Bruno, California. Under NAICS code 811310, the government is seeking capable vendors to provide all labor, supervision, tools, equipment, materials, and transportation necessary to perform on-site preventative and corrective maintenance. The scope of work covers government-owned equipment including dumpers, forklifts, utility vehicles, loaders, and mini excavators. Services must be performed in accordance with manufacturer recommendations and government schedules, encompassing oil and filter changes, fluid and lubrication services, battery testing, and comprehensive system inspections of engines, drivetrains, hydraulics, and electrical systems. Interested respondents must submit their company name and Unique Entity Identifier (UEI) to the contracting officer by the November 3, 2026, deadline, and are encouraged to provide a capabilities statement. Qualified contractors must employ certified mechanics and technicians with experience in heavy equipment maintenance and the ability to service both diesel and gas-powered machinery. Key performance requirements include rigorous safety system checks and forklift inspections to ensure operational compliance. All maintenance activities are to be conducted on-site at the cemetery facility.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

3 days ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
Solicitation # 36C78626B0028
The Department of Veterans Affairs National Cemetery Administration is soliciting bids for the Fort Bliss National Cemetery Gravesite Expansion and FCA Deficiencies project in El Paso, Texas. This firm-fixed-price contract is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated construction magnitude between $20 million and $50 million. The scope of work includes burial expansion, sitework, and the correction of FCA deficiencies, organized into a base bid for installation and pre-placed crypts, and a separate bid option for additional burial expansion and sitework. The project involves comprehensive construction activities, including the installation of 6,632 pre-placed crypts, mass grading, stormwater pollution prevention, and various architectural improvements to the Administration and PIC/Restroom buildings, such as clay roof tile replacement, stucco application, and electrical upgrades. The performance period is 540 calendar days from the notice to proceed, with work beginning within 10 days of award. Bidders must comply with Davis-Bacon prevailing wage requirements and provide performance and payment bonds totaling 100 percent of the awarded contract amount. Technical requirements include adherence to ADA accessibility standards, OSHA safety regulations for excavations, and strict guidelines for the treatment of historic decorative metal. Award will be granted to the responsible bidder whose conforming bid is determined to be most advantageous to the government, with evaluation based primarily on price and price-related factors.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 14 days
View Details
NAICS: 561730
New
Federal
Grounds maintenance services for Riverside National Cemetery. -- S208
Solicitation # 36C78626R501200008
The Department of Veterans Affairs National Cemetery Administration is soliciting proposals for comprehensive grounds maintenance and improvement services at Riverside National Cemetery in Riverside, California. This is a best value source selection procurement set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 561730. The contract structure consists of a twelve-month base year starting November 1, 2026, with four subsequent twelve-month option years. The scope of work covers approximately 460 developed acres and includes turf and grasses maintenance, pest control, irrigation system services, pond and drainage system maintenance, trash and debris removal, structure cleaning, and a one-time replacement and repair of the MOH pool pump system. The maximum aggregate value of the contract is 23,000,000 dollars, with a guaranteed minimum of 9,115.51 dollars. Award decisions will be based on a tradeoff analysis of three factors: Technical Capability, Past Performance, and Price, with the combined non-price factors carrying more weight than price. Technical evaluation focuses on the offeror's approach to turf management, safety compliance with OSHA and SCA standards, and the qualifications of key personnel, specifically the Site Manager. Proposals must include a signed SF 1449, completed price schedules, a draft Quality Control Plan, and at least two relevant past performance references. Following several amendments to address technical publishing issues and vendor inquiries, the final deadline for proposal submission has been extended to November 5, 2026, at 5:00 PM PST, with submissions sent via email to the contracting office.
Landscaping Services

POSTED

4 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS