Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

SAC 104 Cold Plane and RHMA-G

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation District 3 is executing the SAC 104 Cold Plane and RHMA-G project, a highway maintenance effort on Route 104 in Sacramento County near Galt. Spanning from Postmile 0.5 to 4.6, between 0.1 mile west of McKenzie Road and 0.1 mile west of Conley Road, the project aims to extend the service life of the pavement and prevent further deterioration. The scope of work includes performing dig-outs and Hot Mix Asphalt overlay, grinding and overlaying 0.10 inch Cold Plane AC Pavement with Rubberized Hot Mix Asphalt-Gap Graded, and implementing shoulder backing. Additionally, the project involves upgrading six noncompliant curb ramps to meet current ADA requirements. All work will be performed within the operational right-of-way and is classified as a Class 1 Categorical Exemption under PRC 21084 and Title 14 CCR 15301(c), meaning it is exempt from CEQA and NEPA requirements with no significant environmental impacts. A critical requirement for the project is the procurement of Maintenance and Consent Letters from the Union Pacific railroad and the Central California Traction Company due to the proximity of the work to existing railroads. Key personnel overseeing the project include Project Manager Harjinder Dhillon and Environmental Coordinator Masum Patwary.

General Info

Caltrans to repair Route 104 with asphalt overlay, curb ramp upgrades, and railroad coordination by August 2026 in Galt.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Galt, from 0.1 mile west of McKenzie Road to 0.1 mile west of Conley Road from PM 0.5/ 4.6, Galt, CA

Set-Aside

NONE

Documents

(2)

03-4G130 CEQA Exemption NEPA Categorical Exclusion Determination Form

PDFenvironmental-determination

SR104 Cold Plane and RHMA-G Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Masum A PatwaryEnvironmental Scientist

Full Description

Show more
California Department of Transportation (Caltrans) HM-1 Highway Maintenance pavement project in Sacramento County on Route 104 that will perform dig-outs and Hot Mix Asphalt (HMA) overlay, grind and overlay of 0.10’ Cold Plane AC Pavement/Rubberized Hot Mix Asphalt-Gap Graded (RHMA-G) and Shoulder Backing along the corridor of Route 104 from Postmile 0.5 to 4.6. Noncompliant existing curb ramps will be upgraded based on ADA requirements. Working near the two existing railroads will require obtaining a Maintenance and Consent Letter from Union Pacific railroad and Central California Traction Company to proceed with the pavement work.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
REPAIR Airfield Apron - 126 ARW, Scott AFB, IL
Solicitation # W50S7S26
Solicitation W50S7S26Q0031 is a total small business set-aside for comprehensive airfield repairs at the 126th Air Refueling Wing, Scott Air Force Base, Illinois. The project, with an estimated magnitude between 1 million and 2 million dollars, involves four primary components: concrete apron joint sealant and crack/spall repair, asphalt shoulder milling and overlay of approximately 14,500 square yards, airfield marking removal and replacement of approximately 35,000 linear feet, and POL asphalt road repair of 550 square feet. All work must adhere to Air Force and FAA standards, including UFC 3-260-01 and UFC 3-270-02, and utilize Federal Specification TT-P-1952 approved paint for markings. The contract requires a 90-day period of performance, starting from the issuance of the Notice to Proceed. Award evaluation is based on a combination of technical capability, past performance, and price, with a technical boost provided to vendors who attended the site visit. Submission requirements include a technical narrative, a proposed project schedule, a supervisor resume not exceeding two pages, and a completed pricing sheet. The project is subject to Construction Wage Rate Requirements per Wage Determination IL20260017 and requires performance and payment bonds. While initial documents mentioned bid guarantees, Amendment 2 clarified that no bid bonds are required.
W7M6 Uspfo Activity Ilang 126

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS