This Sources Sought opportunity from Department Of Defense was posted on April 9, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SAD Hydropower SATOC

Closed
W912HN-15-Z-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Term Agreement with 4 Options to Renew - Fiber Optic Maintenance, Repair and Modernization for IT, Transportation, and Water Departments
Solicitation # REQ00003176
The City of Garland is soliciting bids for a term agreement under solicitation REQ00003176 to provide fiber optic maintenance, repair, and modernization services for its IT, Transportation, and Water Departments. The contract consists of an initial twelve-month term with four optional twelve-month renewal periods. The City intends to award the contract to the two highest-ranked respondents, designating one as the primary contractor and the other as the secondary contractor to ensure redundancy and emergency response capacity. Award decisions are based on best value, evaluated through overall qualifications, client references, and relevant project examples. The scope of work requires the contractor to provide all labor, materials, and equipment for installation, troubleshooting, and emergency repairs of critical infrastructure, including public safety and SCADA systems. Critical priority outages require a two-hour response time. Deliverables include schematic diagrams, OTDR test files, and as-built drawings, with a minimum two-year workmanship warranty required for all services. Bidders must submit comprehensive bids on all items to be considered responsive, adhering to Texas Government Code Chapter 2258 for prevailing wage rates. Materials are to be billed at actual cost plus a markup not exceeding 10 percent. All submissions must be made electronically via the IonWave portal by November 5, 2026.
City Of Garland

POSTED

about 15 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
SLED
North State And Hwy 101 Utility Infrastructure Boring Project
Solicitation # 26-02
The City of Ukiah, Department of Electric Utility, is soliciting bids for the North State and Hwy 101 Utility Infrastructure Boring Project (Solicitation #26-02). This project involves the installation of utility infrastructure through horizontal directional drilling (HDD) and trenching at North State Street and Highway 101 in Ukiah, California. The scope of work includes 1,375 linear feet of HDD and 142 linear feet of trenching, backfilling, and compaction. Key deliverables include the installation of various HDPE and PVC conduits ranging from 1.25 to 6 inches and the installation of six fiber service vaults. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. Eligible bidders must possess a valid State of California Class A Contractor's License and be registered with the Department of Industrial Relations. Submission requirements include a detailed proposal with unit pricing, a Fair Employment Practices Certification, a notarized Non-Collusion Affidavit, and a statement of experience. Bids must be accompanied by a 10 percent bid security. Upon award, the contractor is required to provide a performance bond for 100 percent of the total contract price, as well as a payment bond and appropriate insurance certificates. The City will provide engineering personnel for inspections, and the contractor is responsible for ensuring all materials are stored to preserve quality and fitness for the work. The response deadline for this solicitation is December 1, 2026.
City of Ukiah

POSTED

about 22 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Broadband Implementation Project - FFA
Solicitation # 2001063
The Broadband Implementation Project - FFA, solicitation number 2001063, is a comprehensive infrastructure initiative for the City of San Luis Obispo, California. The project involves the installation of aerial and underground fiber optics, including directional boring for conduit, deep bore casing, and the installation of 288 CT fiber cable. The scope of work encompasses the placement of various sized vaults, copper clad ground rods, pole risers, down guys, anchors, and new wooden poles, as well as cut and kick operations for existing poles. Additional requirements include potholing, tree trimming, public notification, and strict compliance with CPUC grant reporting and archaeological monitoring. The project is structured with a base bid and five additive alternates covering specific street segments, with award decisions based on a total project bid hierarchy capped at 2,400,000 dollars. Contractors must adhere to stringent technical and regulatory standards, including CPUC General Order 95, Caltrans 2024 specifications, and the City of San Luis Obispo 2025 Engineering Standards. Key requirements include the submission of OTDR bi-directional testing results prior to acceptance and the employment of directional drilling personnel with at least two years of experience. Bidders must provide a bid guaranty of 10 percent of the bid amount and, upon award, provide performance and payment bonds equal to 100 percent of the contract price. Compliance with California Labor Code is mandatory, requiring registration with the Department of Industrial Relations and adherence to prevailing wage laws. Sealed bids are due by 11:00 a.m. on November 19, 2026, to the Public Works Administration Office in San Luis Obispo.
City of San Luis Obispo

POSTED

about 22 hours ago

DEADLINE

in 30 days
NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The scope of work includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire line, and the use of both contractor-furnished materials and owner-furnished self-supporting steel poles. The project has an engineer's estimate of $1,900,000 and requires adherence to the National Electrical Safety Code and various ASTM standards for ductile iron poles and fiberglass crossarms. Bidders must provide evidence of financial and performance experience and are required to submit a bid bond of at least 10% of the total bid amount. The successful contractor must post a combined performance and payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications is mandatory. Bids must be submitted via Bid Express, email, or sealed hard copy by October 29, 2026. All equipment must be delivered FOB Destination to the City of Piqua, and any bids specifying FOB Factory will be rejected.
City of Piqua

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and bus support structures. The contractor is responsible for comprehensive site work, including minor clearing, excavation, structural fill, grounding for all equipment, and the installation of above-ground conduits. The project also requires assistance with the start-up and commissioning of all mechanical, electrical, and electronic systems. Bidders must adhere to strict compliance standards, including State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications. A bid bond of no less than 10 percent is required, and the successful contractor must provide performance and payment bonds equal to the full contract price. Award selection will be based on a comparison of relative merits and the lowest and best bid. Technical execution must follow NESC, NEC, IEEE, and ANSI standards, with specific quality controls for concrete foundations and equipment shipment integrity. Performance penalties of $500 per calendar day apply for deliveries exceeding the designated completion date.
City of Piqua

POSTED

1 day ago

DEADLINE

in 8 days

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

GA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Savannah
Contacts1 person available
OfficeSAVANNAH, GA, 31401-3604, USA
Office AddressSAVANNAH, GA, 31401-3604, USA

Full Description

Show more
SAD Hydropower SATOC SOURCES SOUGHT NOTICE The U.S. Army Corps of Engineers, Savannah District is conducting market research to identify any/all business sources with the capacity and technical capability necessary to successfully perform the requirements described herein. The subject requirement is to provide for the investigation of failures, repairs and/or replacement of generator components and hydraulic turbine components in support of the Southeastern Power Administration (SEPA). Work will be performed at USACE hydroelectric facilities within the SAD Area of Operations (AO) civil boundaries; Savannah District, Mobile District, Wilmington District and Charleston District. Task orders issued under this SATOC will be used by SAD for supplies and services for the analysis, testing, diagnostics, repair, rehabilitation, and/or replacement of generating equipment. The scope will provide immediate response capacity for failed or suspect equipment that is outside the maintenance cycle. This is critical to the SEPA mission to support power needs of its customers in the Southeast and operate the electric grid reliably. Task orders may also be used to perform emergency non-routine maintenance and assessment at SAD hydroelectric facilities. Lists of the hydropower facilities within SAD will be included in the solicitation. Task Orders will be issued on an as-required basis. General Services. Equipment to be worked on includes major electrical and mechanical equipment required to produce electrical energy from water. Examples of the components related to the power train equipment identified for the work under this contract are as follows: Equipment Type 1. Generators and large (500 hp & over) pump motors. Equipment Type 2. Turbines, large (500 hp & over) pumps, water passage, and closure devices (including their power and control units). Major rehabilitations, replacements, upgrades and installation work, which may occur under this contract, will be principally limited to generators, Kaplan turbines and Francis turbines. Major rehabilitations, replacement, and installation work on motors and pumps will be principally limited to units rated at 500 hp and above. Major rehabilitation, replacement, and installation work on water passage and closure devices (including their power and control units) will be principally limited to main unit equipment. Structural inspections, assessment and analysis of generators and of major equipment foundations may be requested under this contract. ? Types of Services Per Equipment Type. A list of the type of work/services for Equipment Type 1 and 2 that may be executed with this IDIQ SATOC are shown below. TABLE 1: TYPE OF WORK/SERVICE Equipment Type 1: Generators and Large (500 Hp & Over) Pump Motors - Performing periodic inspections including structural inspections - Re-tubing or replacing coolers - Performing inspections following unit failure may include testing, measurements, and/or diagnostics - Repair or replace thrust and guide bearing system components, including rebabbitting - Rewedging - Repairs to rotor & stator weldment - Reestablishing corona suppression systems - Disassembly and reassembly of generators - Performing half coil splices - Repairing rotor poles - Partially rewinding stators - Rewinding entire stators - Removing, aligning, and reinstalling rotor poles - Repairing stator cores - Replacing interpole rotor connections - Restacking stator cores - Replacing amortisseur windings - Designing manufacturing, installing, and testing replacement stator cores - Repairing rotating exciters - Designing, manufacturing, installing, and testing stator coils - Performing periodic inspections including structural inspections and repair - Designing, manufacturing, installing, and testing stator bars - Designing, manufacturing, installing, and testing rotor poles - Performing stator core and winding design vibration analysis including Finite Element Analysis of the stator core and windings for the purpose of identifying the cause of and eliminating machine vibration. - Repairing stator frame, e.g. repairing weld cracks, stiffening, etc. - Performing stator core and winding vibration repairs. - Repairing rotor spider frame - Performing electrical testing - Rim shrink analyses and recommendation - Repair or Replace neutral grounding - Performing rotor rim repairs and re-shrinking - Repair brake system - Generator shaft repair or replacement Equipment Type 2: Turbines, Large (500 Hp & Over) Pumps, Water Passage, and Closure Devices: - Crack Fracture Mechanics on non-rotating equipment including Finite Element Analysis - Performing inspections following unit failure may include testing, measurements, and/or diagnostics - Crack repair of Kaplan and Francis runner blades including inspections - Reattachment of failed turbine runner components, e.g. blades or fragment of runner cone - Refurbish existing high pressure oil lift systems or designing and installing new systems - Turbine inlet valve refurbishment, e.g. seal replacement, hydraulic power unit refurbishment - Weld repair of headcovers, stay vanes and turbine components including development of weld procedures and inspections by Certified Welding Inspectors. - Removal, refurbishment, and rehabilitation of wicket gate servomotors - Unit alignment, including redoweling and bearing housing(s) movement, and shimming - Cavitation repair including: Francis or Kaplan runner blades, discharge rings/draft tube liners, and/or wicket gates - Replacement of wicket gate(s) without rotor removal - Turbine shaft sleeve replacement - In-place blade blocking/blade pinning - Turbine shaft repair - Unit start-up and commissioning - Turbine shaft packing box refurbishment - Kaplan linkage repair - Dissassembly/Reassembly This is a Sources Sought Notice only. All offerors interested in competing for any future solicitation as a prime contractor should respond to this Sources Sought Notice. This is not a solicitation announcement. No contract will be awarded from this announcement. No reimbursement will be made for any costs associated with providing information in response to this announcement. The Government will use responses to this Sources Sought Notice to make appropriate acquisition decisions. Any resultant contract is anticipated to be a Single Award Task Order Contract (SATOC) with one (1) year base period; with four (4) one year option periods. The Scope of Work (SOW) requirements fall under the North American Industry Classification System (NAICS) code 237130, "Power and Communication Line and Related Structures Construction." Interested firms must demonstrate in their capability statement evidence of capabilities to perform comparable work identified for this project under identified NAICS code at the magnitude estimated for this IDIQ. Additionally, all potential offerors should submit past projects in which they have completed this type of work, completion date, total contract value and your company's level of involvement in the project. You should also provide at least one point of contact (with email address and phone number) for project validation. Please also include the name and address of your firm, point of contactyou're your company's business size to include any small business designation such as HUBZone, 8(a), SDVOSB, SDB, Women-owned, etc in your submission. The total capacity for this contract is $45M. The ordering limitation for task order shall range between $25K and $2M. Please submit the requested information to the attention of Ms. Kosha Jones, Contract Specialist, at kosha.k.jones@usace.army.mil by 2:00 p.m(Local Time) 15 April 2015.

More opportunities from Department Of Defense → W074 Endist Savannah

Same awarding agency

NAICS: 541620
New
Federal
Requirement to support the Formerly Used Defense Sites (FUDS) Program Single Award Task Order Contract (SATOC)
Solicitation # W912HN-27-S-1001
The United States Army Corps of Engineers Savannah District is conducting market research for a Single Award Task Order Contract (SATOC) to provide comprehensive Environmental Consulting Services (ECS) in support of the Formerly Used Defense Sites (FUDS) program. Under NAICS code 541620, the selected contractor will provide program management, administrative, logistical, and community relations support for the South Atlantic Division. Key responsibilities include maintaining the FUDSMIS database and FUDS Documents portal, developing Project Management and Site Management Action Plans, coordinating Cost-to-Complete estimates, and managing community outreach activities such as Restoration Advisory Board meetings and the creation of Section 508-compliant materials. All task orders under this contract will be performance-based in accordance with FAR 37.6 and FAR 37.102, utilizing a tailored Quality Assurance Surveillance Plan (QASP). The prime contractor must possess a Facility Clearance (FCL) and ensure personnel complete required OPSEC and Controlled Unclassified Information training. Additionally, personnel performing IA/IT services must comply with DoD 8570.01-M certifications. Deliverables must be uploaded to government-controlled platforms to prevent vendor lock-in. Interested respondents must submit their business identification, size status, and corporate structure via the provided survey link by November 18, 2026.
Environmental Consulting Services

POSTED

about 17 hours ago

DEADLINE

in 29 days
View Details
NAICS: 236220
New
Federal
Infantry Platoon Battle Course (IPBC) Fort Bragg, North Carolina
Solicitation # W912HN26BA005
The U.S. Army Corps of Engineers Savannah District is soliciting bids for the construction of a standard Automated Infantry Platoon Battle Course (IPBC) at Fort Bragg, North Carolina, under solicitation W912HN26BA005. This is a Full and Open Competition for a single Firm-Fixed-Price contract under NAICS code 236220, with an anticipated construction magnitude between $10 million and $25 million. The project scope includes the construction of the IPBC, a small control tower, a small arms range operations control area, an operations and storage building, covered bleachers, a covered mess, an ammunition breakdown building, and latrine pads. Supporting infrastructure requirements encompass electric service, site improvements, information systems, cybersecurity measures, and sustainability energy measures. The period of performance is 720 calendar days following the notice to proceed. Technical requirements are extensive, covering underground electrical distribution, telecommunications outside plant infrastructure, and specific structural standards for metal roof and wall panels, unit masonry, and concrete. Key deliverables include the installation of fiber optic cabling, grounding and lightning protection systems, and the emplacement of various infantry and armor targets. Bids must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. Following several amendments to revise drawings and specifications, the final bid opening date is established as October 30, 2026, at 2:00 PM local time. Offerors must maintain active registration in the System for Award Management (SAM) to be eligible for award.
Commercial and Institutional Building Construction

POSTED

about 17 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237990
New
Federal
Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging Select Sites
Solicitation # W912HN27S5000
The Savannah District Corps of Engineers is conducting a sources sought market research effort to identify capable contractors for the FY26 Atlantic Intracoastal Waterway maintenance dredging project. The scope of work involves unclassified dredging at Hell Gate and Florida Passage in Chatham County, Georgia, and Fields Cut in Jasper County, South Carolina. The project requires dredging to an authorized width of 150 feet and a depth of 12 feet, with an estimated total removal of 265,000 cubic yards of material. Dredged sediment will be transported via pipeline or alternative methods to beneficial use sites or confined upland containment areas, with some transport distances reaching up to 9 miles. The estimated magnitude of this requirement is between 5 million and 10 million dollars, falling under NAICS code 237990 with a size standard of 45 million dollars. The expected duration of performance is 165 days from the notice to proceed. Contractors must demonstrate capabilities in hydraulic cutterhead dredging, island shaping to specific slopes, and the use of low ground pressure or aquatic equipment for soft foundations. Additionally, the government is seeking evidence of experience operating in environmentally sensitive areas, managing high vessel traffic, and working within tidal cycles featuring flows up to 4 feet per second. Responses must be submitted via PIEE by November 20, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS