Safety and Reliability Upgrade, KSC Institutional Power Systems, Phase 6
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract involves a safety and reliability upgrade project for the institutional power systems at Kennedy Space Center (KSC), designated as Phase 6. The main focus is to replace degraded and obsolete electrical infrastructure, including switchgear, substations, load break switches (LBS), vacuum fault interrupters (VFI), and various other power components as necessary throughout multiple KSC locations. The work aims to enhance the overall reliability and safety of the power distribution system across the facility. The solicitation is identified by the number nasa-e226bbba53a8fcbb and was posted on July 1, 2025. It falls under NAICS code 236220, which pertains to commercial and institutional building construction. There is no set-aside for small businesses associated with this forecast. Points of contact for the contract include Brian G. Graf and Natalie B. Colvin, the latter serving as the small business specialist. The project will be performed on-site at KSC, and further details or inquiries can be directed via the provided emails or through NASA’s procurement forecast website.
General Info
Agency
NAICS
Place of Performance
KSC, FL, United StatesSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
