Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Bernardino Library Norman Feldheym Branch Improvements Project No. 13686 Contract No. GB26-015

Closed
RFQ F-26-5077State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262, as well as associated buildings 261 and 263, at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price contract involves a comprehensive scope of work including the replacement of corridor and classroom flooring with composite modular materials, full restroom renovations involving new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include upgrading lighting to simple dimming controls, replacing ceiling fans, updating doors and life-safety components, and replacing variable air volume systems and HVAC controls. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Proposals are due by November 18, 2026, and will be evaluated based on price, past performance, and corporate relevant experience. Awardees must provide payment and performance bonds, and bidders are required to furnish a bid guarantee of 20 percent of the bid price or 3 million dollars. The project mandates strict adherence to ADA accessibility guidelines, the FLETC Hazardous Waste Management Plan, and prevailing wage rates as specified in Wage Determination GA20260315. Personnel must undergo background checks and security clearances to access the facility.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, exterior wall systems, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the project requires a full NFPA-compliant fire suppression system, replacement of electrical distribution, lighting, low-voltage systems, and building automation controls. Site improvements encompass paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, alongside hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Bidders must provide pricing for two primary exhibit line items: building renovation and paving work. Award is based on the lowest price, with specific evaluations for Buy American Act compliance. Key requirements include a comprehensive Contractor Quality Control Plan, adherence to Davis-Bacon Act wage determinations, and tiered bonding requirements based on proposal value. Deliverables include technical shop drawings, O&M manuals, and a 20-year no dollar limit warranty for specific roofing materials and labor. Responses are due by November 23, 2026.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under NAICS code 236220. The solicitation was posted on October 31, 2026, with a response deadline of November 4, 2026. The primary point of contact for this effort is Richie Tran. To ensure project financing and bid responsiveness, contractors must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements that expand upon State Water Resources Control Board standards. Critical requirements include posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration and the Minority Business Development Agency. Proof of these specific public notifications and agency utilizations must be submitted within the bid package, or the proposal will be deemed non-responsive. Other requirements include active outreach and recruitment of DBEs, with documentation for these efforts permitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator services, fire protection, plumbing, mechanical, electrical, sitework, and crane operations. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 29 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, rubber wall base installation, flooring replacement, and the replacement of vanities and cabinets, as well as necessary electrical work. All restoration must use like materials and comply with ADA, OSHA, EPA, and NFPA-101 life safety codes, as well as local Massachusetts building ordinances. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown for labor, materials, and equipment, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts contractor's license, and certification of compliance with the latest area wage rate decisions. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour for covered workers and the provision of paid sick leave. Contractors must maintain automobile liability insurance with minimum coverage of 200,000 dollars per person and 500,000 dollars per occurrence, naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30. The acceptance process involves a substantial completion walk-through and a final inspection, with a requirement that punch list items be corrected within 14 days.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring interior spaces damaged by water intrusion to return them to safe residential use. The scope of work includes repairs to sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms, specifically involving drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in the mechanical room. The contractor is responsible for providing all labor, materials, equipment, and supervision, and must ensure the protection of the occupied building and the coordination of service interruptions. This solicitation is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan with phasing and timelines, and itemized pricing by room and trade. Awardees must provide payment and performance bonding for the full project value within ten days of award, as well as proof of general liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract entails comprehensive improvements to the San Bernardino Library Norman Feldheym Branch, focusing on enhancing ADA accessibility and upgrading various building systems to improve energy efficiency. Key components of the project include ADA accessibility enhancements, window and emergency door replacements, modernization of HVAC and air filtration systems, electrical and security system upgrades, as well as interior water damage repair and foundation stabilization. These upgrades aim to ensure the library meets current standards for accessibility, safety, and environmental performance. The solicitation for this project was issued by the Finance Department of the City of San Bernardino, California, under RFQ F-26-5077, with a response deadline of July 16, 2026. Prospective bidders are required to review the detailed solicitation documents, which include the full project scope, bid instructions, mandatory pre-bid conference details, and technical specifications. The primary point of contact for this contract is Jennifer Broadnax, reachable via email or phone, to provide any necessary clarifications or additional information.

General Info

San Bernardino Library upgrades: ADA accessibility, HVAC modernization, security, electrical, water damage, foundation stabilization.

Place of Performance

555 W 6TH STREET SAN BERNARDINO, CA 92410, CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Contract opportunity posted

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Finance Department of City of San Bernardino
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts
Jennifer BroadnaxContact

Full Description

Show more
Scope: This project is intended to improve ADA accessibility and energy efficiency. The work consists of ADA accessibility upgrades; window and emergency door upgrades; HVAC and air filtration modernization; electrical upgrades; security system upgrades; interior water damage repair; and foundation repair.
Please see solicitation documents for the full scope of work, bid requirements, project plans, specifications, mandatory pre-bid conference information, and submission instructions.

More opportunities from California → Finance Department of City of San Bernardino

Same awarding agency

NAICS: 237110
New
SLED
CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003
Solicitation # RFQ F-26-4070
The City of San Bernardino is soliciting bids for the Connector Pipe Screen (CPS) Phase 4 project, under solicitation RFQ F-26-4070. The scope of work involves the preliminary measurement, fabrication, and installation of CPS units within catch basins to intercept stormwater runoff and remove debris larger than 5 mm in diameter. The contractor is responsible for cleaning existing catch basins and ensuring all units are sized to fit through manhole openings, with removable units required for any that encroach more than 4 inches. Technical specifications require the use of S-304 stainless steel for frames and S-316 stainless steel for hardware, with screens maintaining at least 45% open area and a minimum thickness of 14 gauge. Additionally, the contractor must paint staff gauges on interior walls with red stripes and numbers marking 40% and 100% screen height. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid. Bids must be submitted via the Planetbids portal by 3:00 PM on November 23, 2026, and must include a bid guarantee of at least 10% of the total bid price. Successful bidders are required to provide faithful performance and labor and material payment bonds, each equal to 100% of the contract price. Work must commence within ten days of the Notice to Proceed, with a construction schedule and schedule of submittals due shortly thereafter. Compliance requirements include adherence to prevailing wages, ADA standards, and California state licensing laws, as well as the submission of an Iran Contracting Act Certification and a Non-Collusion Declaration.
Water and Sewer Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 23 days
View Details
NAICS: 624229
SLED
MAILBOX ONLY – FY 2027-2028 CDBG and ESG Notice of Funding Availability
Solicitation # NOFA FY 2027-2028
The City of San Bernardino Community Development and Housing Department is seeking applications for FY 2027-2028 Community Development Block Grant (CDBG) and Emergency Solutions Grant (ESG) funding. The city anticipates approximately 2,600,000 dollars in CDBG funding, including 400,000 dollars specifically for public service activities, and 256,500 dollars in ESG funding, both subject to final HUD allocations. These grants are distributed through a reimbursement program to support eligible activities that benefit low- and moderate-income residents, provide community improvements, and address homelessness and housing instability. Key goals include enhancing access to affordable housing, improving homeless prevention services, and funding necessary infrastructure and fair housing rehabilitation. Applications must be submitted via the Neighborly Participant Portal between October 26, 2026, and December 7, 2026, at 3:00 p.m. Pacific Time. To be eligible, applicants must possess a Unique Entity Identifier (UEI) and be registered with the System for Award Management (SAM). ESG proposals must meet strict threshold criteria, including serving residents at or below 30 percent of the Area Median Income and providing a 100 percent funding match. Projects are scored on a 100-point scale, requiring a minimum of 70 points for a funding recommendation, with final approval granted by the Mayor and City Council. Awarded recipients must comply with HUD regulations, ADA standards, and maintain general liability insurance of at least 2 million dollars per occurrence.
Other Community Housing Services

POSTED

10 days ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
SLED
Professional Design Engineering Services for Safe Streets and Roads for All (SS4A) Implementation Grant Plan
Solicitation # F-27-1064
The City of San Bernardino is soliciting proposals under RFP F-27-1064 for professional design engineering services to implement roadway safety improvements at five specific locations: Highland Avenue at Eucalyptus Drive, 30th Street, Meridian Avenue, Kendall Drive, and Lynwood Drive. Funded by the FY 2024 Safe Streets and Roads for All (SS4A) grant from the U.S. Department of Transportation, the project focuses on pedestrian safety enhancements, bicycle facilities, traffic control and signalization, pavement friction treatments, lighting upgrades, and sidewalk gap closures. The scope of work includes preliminary engineering, NEPA documentation, right-of-way and utility impact assessments, and project reporting. An option phase may include final engineering design, subsurface utility engineering, utility relocation, and right-of-way acquisition support. Proposals must be submitted electronically via PlanetBids by 3:00 PM on November 18, 2026. The City will select a consultant based on demonstrated competence and professional qualifications, utilizing a combination of pass/fail criteria, weighted scoring, and in-person presentations. Key requirements include compliance with 2 CFR Part 200, State of California prevailing wage laws, and USDOT non-discrimination assurances. Selected consultants must provide monthly summary reports and adhere to a quarterly reviewed Performance Measurement Plan. Payment for services will be made within 45 days of invoice receipt, provided that detailed labor classifications and cost breakdowns are submitted for federal reimbursement purposes.
Engineering Services

POSTED

11 days ago

DEADLINE

in 18 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS