Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Diego Lossan Rail Realignment Engineering Support Services

Closed
34241State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 12 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The San Diego LOSSAN Rail Realignment Project aims to improve the rail corridor between San Dieguito Lagoon and Sorrento Valley Station by relocating a segment of the existing Los Angeles-San Diego-San Luis Obispo Rail Corridor. The project involves preparing preliminary engineering plans and securing environmental clearance, with a focus on constructing a tunnel through the highlands between San Dieguito Lagoon and Los Penasquitos Lagoon. This realignment is designed to enhance rail operations and mitigate environmental and community impacts by shifting the tracks to a new alignment north of Sorrento Valley Station. The contract, titled San Diego Lossan Rail Realignment Engineering Support Services, was posted on August 19, 2024, with a response deadline of September 17, 2024. It is managed by the North County Transit District in California and is valued between $50 million and $150 million. The project seeks engineering support services under NAICS code 541330, with primary contact Alesia Atkinson available via email and phone for further inquiries. The contract aims to facilitate the project's technical development, ensuring compliance with environmental and engineering standards to support the successful realignment of this vital rail corridor.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

5

34241-04-06 Attachment 02 - List of Deliverables

PDF, High priority: read this firstsow
High

RFSQ# 34241 - San Diego LOSSAN Rail Realignment Engineering Services

PDF, High priority: read this firstrfq
High

RFSQ 34241 - San Diego LOSSAN Rail Realignment Engineering Support Services Agreement

PDF, High priority: read this firstcontract-document
High

San Dieguito to Sorrento Valley Double Track Alternatives Analysis Report

PDF, High priority: read this firstspecifications
High

Attachment 03 - SANDAG Comments Review Form

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 1, 2024 to Sep 17, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → North County Transit District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The San Diego Association of Governments (SANDAG) is working with regional stakeholders to prepare preliminary engineering plans and obtain environmental clearance for the San Diego LOSSAN Rail Realignment Project (Project). The Project proposes to realign a segment of the Los Angeles-San Diego-San Luis Obispo Rail Corridor (LOSSAN) from its existing location along the Del Mar Bluffs to a new location between San Dieguito Lagoon and Sorrento Valley Station. The Project is envisioned to relocate the tracks generally between the San Dieguito Lagoon to a location north of the Sorrento Valley Station. The Project is anticipated to include a tunnel through the highlands between the south end of San Dieguito Lagoon and the north end of Los Penasquitos Lagoon.

More opportunities from California → North County Transit District

Same awarding agency

NAICS: 238990
SLED
On Call Bus Stop Bench Replacement
Solicitation # 37923
The North County Transit District (NCTD) is soliciting bids under IFB No. 37923 for an on-call contract to furnish, install, and replace bus stop furniture, specifically hot-dipped galvanized metal benches and trash receptacles, throughout North San Diego County. The agreement features a three-year base term with a two-year option term. The scope of work includes the removal and disposal of existing furniture, repair of ground surfaces, and the installation of new units securely anchored to the ground. NCTD anticipates an average of 40 replacements annually, with the potential for one-time replacements of up to 74 units. The contract is awarded to the lowest responsible bidder who complies with all solicitation requirements. Bidders must submit their proposals electronically via PlanetBids by the November 10, 2026, deadline. Required documentation includes bid bonds at the time of submission, with performance and payment bonds totaling 100 percent of the bid amount required upon execution. The contractor must adhere to California prevailing wage laws, FTA Circular 4220.1G, and various federal and state non-discrimination and civil rights regulations. Payment is processed monthly within 30 days of invoice confirmation. Performance is monitored through field inspections and a final punch walk conducted by the NCTD Project Manager to ensure all installations meet quality and safety standards.
All Other Specialty Trade Contractors

POSTED

15 days ago

DEADLINE

in 13 days
View Details
NAICS: 561710
SLED
Pest Control Services (Bus And Train)
Solicitation # 38028
The North County Transit District is soliciting bids for pest control services for its bus and rail vehicles in Oceanside, California. The contract consists of a three-year base term with two optional one-year extensions. The selected contractor will be responsible for the inspection, monitoring, treatment, and eradication of various pests, including ants, cockroaches, rodents, and bed bugs, while excluding termites. Services must include scheduled preventive maintenance and on-call emergency support available seven days a week. All pesticide applications must strictly adhere to EPA, FIFRA, and California Department of Pesticide Regulation standards, and Safety Data Sheets must be submitted to the project manager prior to any application. The contract will be awarded to the lowest responsible bidder who meets all technical and financial requirements. Bidders must submit their proposals electronically via PlanetBids by October 30, 2026, including all required certifications such as ADA compliance, lobbying restrictions, and debarment status. The contractor is required to maintain all necessary licenses and insurance, and may be required to provide performance and payment bonds totaling 100 percent of the bid amount. Invoicing is permitted on a monthly basis, with payments made in arrears. Additionally, the contractor must comply with sensitive security information procedures and assist the agency in tracking Disadvantaged Business Enterprise and Small Business participation.
Exterminating and Pest Control Services

POSTED

23 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS