Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

San Dieguito Lagoon Double Track Project

Active
20260715041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Dieguito Lagoon Double Track Project involves the construction of a new double-track bridge over the San Dieguito River, 2.1 miles of rail track improvements including 1.7 miles of new double track, and a special events rail platform at the Del Mar Fairgrounds, spanning from Solana Beach to Del Mar in California. Work encompasses comprehensive civil, structural, and environmental components including bridge and platform construction, a double box culvert, excavation, ground improvements, retaining walls, drainage systems, site preparation, demolition of an existing wood trestle bridge, and relocation of multiple utilities such as electrical, fiber optic, sewer, and water lines. Environmental restoration efforts include hydroseeding and coastal salt marsh habitat rehabilitation to comply with regional ecological standards. The project is managed by the San Diego Association of Governments (SANDAG) under solicitation number 20260715041, with responses due by September 10, 2026, and performance expected to occur in San Diego, California. While the full contract value and pricing details are not disclosed, participation by Disadvantaged Business Enterprises and Small Businesses in architecture, engineering, construction management, or planning services is strongly encouraged through SANDAG’s Bench Program, which provides a pre-vetted pool of certified firms to support equity and inclusion goals. No specific contract type, payment terms, invoicing system, accounting codes, or formal inspection criteria are provided in the available documentation, nor are there detailed specifications, standards, or evaluation factors publicly listed. The point of contact for the solicitation is Dominic Brunele, with submissions expected through an electronic procurement platform, though exact submission protocols and required documentation formats remain unspecified.

General Info

Replace wood bridge with double-track rail, add events platform, upgrade infrastructure, and restore coastal habitats.

Agency

California → San Diego Association of GovernmentsView Agency

NAICS

334310 - Audio and Video Equipment ManufacturingView NAICS

Place of Performance

San Diego, CA, 92101, USA

Set-Aside

NONE

Documents

(18)

SOL1630425 Part C1e Plans - San Dieguito River Bridge Replacement Track Bridge Plans

PDFspecifications

SOL1630425 Part C1g Plans - Structural and Construction Notes

PDFspecifications

SOL1630425 Part A2 Technical Specifications Sections 10+

PDFspecifications

SOL1630425 Part C1d Plans - Construction and Drainage Notes

PDFspecifications

SOL1630425 Part C1h Plans - Railway Systems Design Overview

PDFspecifications

SOL1630425 Part C1b Plans - Construction and License Agreements

PDFplans

SOL1630425 Part C1f Plans.pdf

PDF

SOL1630425 Part A3 Exhibits - Federal Labor Contract Provisions

PDFwage-determination

SOL1630425 Part C2 Reference Drawings

PDFspecifications

SOL1630425 Part C1c Plans - San Dieguito River Bridge Replacement Track Cross Sections

PDFplans

SOL1630425 San Dieguito River Bridge Replacement Plans

PDFdesign-drawings

SOL1630425 San Dieguito Lagoon Double Track Project Bid Booklet

PDFifb

SOL1630425 Part B2 Price Sheet.xlsx

XLSX

SOL1630425_Pre-Bid_Meeting_Attendee_List_1784754922871.xlsx

XLSX

SOL1630425 Part A3 Exhibit 3B Contractors Experience.xlsx

XLSX

SOL1630425 San Dieguito Lagoon Double Track Project IFB Special Provisions

PDFifb

Planholders List for Solicitation 1785177993858

PDFplanholders-list

SOL1630425 Addendum No. 1 for San Dieguito Lagoon Double Track Project

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Association of Governments
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Diego Association of Governments
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #SOL1630425: The San Dieguito River Bridge Replacement, Double Track and Special Events Platform Project involves constructing a new double-track bridge over the San Dieguito River, 2.1 miles of track improvements including 1.7 miles of new double track, and a special events rail platform at the Del Mar Fairgrounds. The project spans from Solana Beach to Del Mar. Work includes track construction, a new crossover and turnout, signal and communication systems, bridge and platform construction, a double box culvert, excavation, ground improvements, retaining walls, drainage, site work, demolition of an existing wood trestle bridge, utility relocations (electrical, fiber optic, sewer, water), and environmental restoration including hydroseeding and coastal salt marsh restoration.

Similar Contracts

Same NAICS industry code