Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Dieguito Lagoon Double Track Project

Closed
20260715041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334310
New
DIBBS
MICROPHONE ASSEMBLY
Solicitation # SPE7M5-27-U-0043
Solicitation SPE7M5-27-U-0043 is a request for quotations issued by the DLA Weapons Support Active Devices Division for the procurement of microphone assemblies, identified by NSN 5965-01-230-2350. This total small business set-aside involves an estimated annual quantity of 390 units, with a guaranteed contract minimum of 58 units and a maximum contract value of 350,000 dollars. The items are designated as critical application items and must meet specific technical data requirements, including a total assembly weight of approximately 67 grams and the use of cordage per MIL-C-83501. A notable technical exception specifies that the assembly is not required to function after salt-fog testing, as this process is used solely to evaluate the corrosion resistance of exposed metal parts. Delivery is required within 102 days after the delivery order, with terms set as FOB Origin and inspection and acceptance occurring at the destination. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, respectively, with additional requirements for the handling and labeling of hazardous materials per IP025 and 29 CFR 1910.1200. The contract incorporates various FAR and DFARS clauses, including the Buy American Act, Berry Amendment, and cybersecurity requirements for safeguarding covered defense information. Invoicing and payment are to be processed electronically through the Wide Area WorkFlow system. Quotations are due by November 12, 2026, and will be evaluated based on the price quoted for the estimated annual demand.
DLA WEAPONS SUPPORT ACTIVE DEVICES DIVISION

POSTED

about 19 hours ago

DEADLINE

in 15 days
NAICS: 334310
New
Federal
58--SWITCH MATRIX,COMMS, IN REPAIR/MODIFICATION OF
Solicitation # N0010426QYAFG
Solicitation N00104-26-Q-YAFG, issued by NAVSUP Weapon Systems Support Mechanicsburg, is a Firm-Fixed Price request for the teardown, evaluation, repair, and potential modification of the Switch Matrix, Comms (NSN 5830-01-731-0049). The contract requires the repaired items to meet specific operational and functional requirements defined by the applicable Cage Codes and reference numbers, with all work performed according to approved repair and overhaul standard practices. A critical technical requirement is that all materials must be mercury-free to prevent corrosion and toxicity on submarines and surface ships. The delivery turnaround time is 38 days, and the government maintains an option to increase the quantity by up to 200 percent of the base item within 365 days. The government intends to make a single award based on the most advantageous offer, prioritizing past performance over price. Evaluation will include risk assessments via the Supplier Performance Risk System regarding item, price, and supplier risk. Contractors must adhere to strict packaging and marking standards, including MIL-STD-2073 and MIL-STD-130, and utilize the Wide Area Workflow system for electronic invoicing. Additional compliance mandates include NIST SP 800-171 cybersecurity assessments, Buy American preferences, and the provision of Material Safety Data Sheets for any hazardous materials used during the repair process.
Navsup Weapon Systems Support Mech

POSTED

about 24 hours ago

DEADLINE

in 3 months

AI Contract Overview

Show more

The San Dieguito Lagoon Double Track Project, solicited by the San Diego Association of Governments (SANDAG), is a comprehensive rail infrastructure initiative located along the LOSSAN corridor between Solana Beach and Del Mar, California. With an engineer's estimate of 276,588,718.78 dollars and a project duration of 922 working days, the scope includes the construction of a new double track bridge (BR 243.0) over the San Dieguito River, 2.1 miles of track improvements featuring 1.7 miles of new double track, and a special events rail platform at the Del Mar Fairgrounds. Additional technical requirements involve the installation of a No. 20 universal crossover, a No. 24 turnout, signal and communication systems, a double reinforced concrete box culvert at Stevens Creek, and extensive utility relocations for electrical, fiber optic, sewer, and water systems. The project also emphasizes environmental restoration, including coastal salt marsh restoration and hydroseeding. The contract is subject to stringent federal and state regulations, including Buy America and Build America, Buy America (BABA) preferences, and Davis-Bacon Act prevailing wage standards. Bidders must provide a bid guarantee of 5 percent of the bid price, with performance and payment bonds required at 100 percent of the contract price. Technical execution must adhere to AREMA, Caltrans, and AASHTO standards, with specific safety requirements mandating a dedicated Safety Representative knowledgeable in FRA and CPUC regulations. Award evaluation is based on the bidder's integrity, past performance, financial capability, and technical capacity. All bids must be submitted electronically via BidNet Direct, including a detailed Bid Booklet and Price Sheet, while adhering to the modifications outlined in Addendum No. 1.

General Info

Replace wood bridge with double-track rail, add events platform, upgrade infrastructure, and restore coastal habitats.

Place of Performance

San Diego, CA, 92101, USA

Set-Aside

NONE

Documents

18

SOL1630425 Addendum No. 1 for San Dieguito Lagoon Double Track Project

PDF, High priority: read this firstamendment
High

SOL1630425 Part A2 Technical Specifications Sections 10+

PDF, High priority: read this firstspecifications
High

SOL1630425 Part A3 Exhibits - Federal Labor Contract Provisions

PDF, High priority: read this firstwage-determination
High

SOL1630425 Part C1b Plans - Construction and License Agreements

PDF, High priority: read this firstplans
High

SOL1630425 Part C1c Plans - San Dieguito River Bridge Replacement Track Cross Sections

PDF, High priority: read this firstplans
High

SOL1630425 Part C1d Plans - Construction and Drainage Notes

PDF, High priority: read this firstspecifications
High

SOL1630425 Part C1e Plans - San Dieguito River Bridge Replacement Track Bridge Plans

PDF, High priority: read this firstspecifications
High

SOL1630425 Part C1g Plans - Structural and Construction Notes

PDF, High priority: read this firstspecifications
High

SOL1630425 Part C1h Plans - Railway Systems Design Overview

PDF, High priority: read this firstspecifications
High

SOL1630425 Part C2 Reference Drawings

PDF, High priority: read this firstspecifications
High

SOL1630425 San Dieguito Lagoon Double Track Project Bid Booklet

PDF, High priority: read this firstifb
High

SOL1630425 San Dieguito Lagoon Double Track Project IFB Special Provisions

PDF, High priority: read this firstifb
High

SOL1630425 San Dieguito River Bridge Replacement Plans

PDF, High priority: read this firstdesign-drawings
High

Planholders List for Solicitation 1785177993858

PDF, Low priorityplanholders-list
Low

SOL1630425 Part A3 Exhibit 3B Contractors Experience.xlsx

XLSX

SOL1630425 Part B2 Price Sheet.xlsx

XLSX

SOL1630425 Part C1f Plans.pdf

PDF

SOL1630425_Pre-Bid_Meeting_Attendee_List_1784754922871.xlsx

XLSX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Association of Governments
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #SOL1630425: The San Dieguito River Bridge Replacement, Double Track and Special Events Platform Project involves constructing a new double-track bridge over the San Dieguito River, 2.1 miles of track improvements including 1.7 miles of new double track, and a special events rail platform at the Del Mar Fairgrounds. The project spans from Solana Beach to Del Mar. Work includes track construction, a new crossover and turnout, signal and communication systems, bridge and platform construction, a double box culvert, excavation, ground improvements, retaining walls, drainage, site work, demolition of an existing wood trestle bridge, utility relocations (electrical, fiber optic, sewer, water), and environmental restoration including hydroseeding and coastal salt marsh restoration.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS