San Jacinto Leadership Academy Modernization Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Jacinto Unified School District is implementing the San Jacinto Leadership Academy Modernization Project, a campus improvement initiative located at 181 N Ramona Boulevard in San Jacinto, California. The project involves the construction of a new 18,335 gross square foot two-story classroom and administrative building on the northwestern portion of the campus, which will feature 10 classrooms, administrative offices, a conference room, a health office, and a lobby. This new facility will replace 10 existing portable classrooms (Building Nos. 201-205 and 301-305) that are scheduled for removal. Additionally, the project includes the modernization of four existing buildings (400, 500, 700, and 800) through interior upgrades to walls, ceilings, restrooms, and doors. Site improvements include a new 38-space parking lot near the intersection of Tahquitz Street and Ramona Boulevard, featuring three ADA stalls, three electric vehicle (EV) spaces, and 13 EV-capable stalls. The scope also encompasses 31,750 square feet of hardscaping and 6,100 square feet of landscaping. The project will be executed in three phases over approximately 14 months, beginning in November 2026 and concluding in January 2028. All work will be performed on campus and must comply with the City of San Jacinto Municipal Code regarding construction noise regulations. The project is exempt from CEQA as it does not increase the net number of classrooms or the overall student capacity of the school.

General Info

Replace ten portables with new two-story building, modernize four buildings, add 38-space EV-ready parking, complete in three phases over 14 months.

Agency

California → San Jacinto Unified School District

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Ramona Boulevard and 1st Street, San Jacinto, CA, 92583

Set-Aside

NONE

Documents

(1)

San Jacinto Leadership Academy Modernization Project Notice of Exemption August 2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Jacinto Unified School District
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Jacinto Unified School District
Office AddressN/A
Contacts
Mary ElderFacilities Project Manager

Full Description

Show more
The District proposes the addition of a two-story building with 10 classrooms, administrative offices, workrooms, and restrooms on the northwestern portion of the campus; removal of ten portable classrooms that are currently in the northwestern portion of the campus and will be replaced by the new classroom building; interior alterations to four existing classroom buildings on the campus; and addition of a new 38 space parking lot near the intersection of Tahquitz Street and Ramona Boulevard, which will include three electric vehicle (EV) parking spaces, and three ADA parking spaces New Classroom Building: The District proposes the construction of a two-story classroom and administrative building on the northwestern portion of campus, along Ramona Boulevard. The new building will include 10 new classrooms, student and staff restrooms, utility rooms, a health office, administrative offices, a conference room, a workroom, an elevator, and a lobby area. The new building will be 18,335 gross square feet. The addition of the new building will replace the portable classrooms proposed to be removed. Portable Classroom Removal: The proposed project will include the removal of 10 portable classrooms (Building Nos. 201–205 and 301–305) and associated utilities currently located at the northwestern portion of the campus, with the new classroom building serving as their replacement. Building Modernization: The proposed project will also include the modernization of four existing buildings—Building 400, 500, 700, and 800. Modernization will include minor interior upgrades to doors, walls, restrooms, and ceilings. New Parking Lot and Access: The proposed project will add a new 38-space parking lot near the intersection of Tahquitz Street and Ramona Boulevard on the northwestern corner of campus, and the location of an existing grassy field. Access to the new parking lot will be provided by a connection to an existing driveway on Tahquitz Street that currently provides access to an adjacent parking lot, located directly north of the project site. The new parking lot will provide additional parking for students and staff, and will include three electric vehicle (EV) parking spaces and 13 EV-capable parking stalls. Three ADA parking stalls will be added. New associated landscaping and tree shading will be implemented throughout the parking lot. Hardscaping and Landscaping: Proposed new hardscaping and landscaping will be added to the areas surrounding the proposed new building and parking lot and will consist of ornamental landscaping, shade trees, and concrete paving. New hardscaping will encompass 31,750 total square feet, and new landscaping will encompass 6,100 total square feet. Construction: The proposed project will be constructed in three phases over approximately 14 months, beginning in November 2026 and ending in January 2028. Phase 1 will consist of the construction of the new classroom and administrative building; Phase 2 will consist of the modernization of Buildings 400, 500, 700, and 800; and Phase 3 will consist of the removal of the ten portable classrooms. All construction equipment and workers will be within the boundaries of the project site, and contractors will adhere to Section 8.40.090, Construction Activity Noise Regulations, of the City of San Jacinto Municipal Code, which limits construction activities to 7:00 a.m. to 7:00 p.m. on weekdays and Saturdays, and between 9:00 a.m. and 6:00 p.m. on Sundays and holidays to avoid disruption to nearby residences. The proposed project will not increase the net total number of classrooms on the campus and will not increase the school’s student capacity. All project improvements will occur on campus, and no off-site improvements will be included as part of the proposed project.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Both structures will feature shallow foundations, structural steel framing, standing-seam roofs, and a combination of masonry and metal panel exterior walls. The scope of work is extensive, covering everything from demolition of an existing engineering facility to comprehensive site improvements, including stormwater retention, utilities, landscaping, and parking. Bids are requested across numerous trades, including concrete, masonry, electrical, mechanical, plumbing, and structural steel. The project adheres to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional structures include a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive site preparation involving rock excavation, grading, and wetland mitigation. Technical requirements include specialized foundation features such as rigid inclusions and load transfer mats, as well as the installation of grounding, lightning protection, and intrusion detection systems. The scope covers a wide array of trades, including structural steel, electrical utilities, plumbing, mechanical systems, and paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS