San Joaquin River Basin, Lower San Joaquin River, CA Project Compensatory Mitigation Plan
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project centers on implementing a revised compensatory mitigation strategy for the Lower San Joaquin River basin in California, replacing the previously planned purchase of mitigation bank credits with the establishment of up to six onsite and offsite habitat restoration sites due to the unavailability of suitable credits in the region. Spearheaded by the San Joaquin County Area Flood Control Agency, the effort is designed to fulfill ecological obligations under the Endangered Species Act and other federal regulations by restoring wetland and riparian habitats critical for listed species, with oversight and acceptance responsibilities held by the U.S. Army Corps of Engineers. Environmental performance is evaluated using standardized scientific methods including the California Rapid Assessment Method for wetlands and the Habitat Evaluation Procedure for riparian zones, with success measured against 50-year functional targets and reference site benchmarks. Key criteria for acceptance include soil quality, water turbidity limits not exceeding 50 NTUs above ambient levels, erosion and sediment control compliance, and adherence to biological opinions from the U.S. Fish and Wildlife Service and National Marine Fisheries Service. Construction activities, set to commence in May 2032 and conclude by August 2028, require noise and vibration mitigation, pre-construction monitoring, worker training on environmental protections, hazardous material handling protocols, and implementation of Best Management Practices to safeguard aquatic receptors. The total project cost is estimated between $144.9 million and $233.1 million, encompassing land acquisition, habitat design, construction, long-term monitoring, and regulatory compliance. Deliverables include detailed ecological accounting reports, mitigation performance documentation, and compliance submissions, with the final approval authority resting with the Corps based on ecological outcomes rather than cost. Coordination with federal, state, and local agencies is integral, and all work must align with the 2018 Integrated Feasibility Report’s mitigation goals, albeit through a new, locally sourced implementation approach. No formal contract line items, pricing structure, or federal acquisition clauses are specified, indicating this is primarily an environmental compliance and restoration project administered through regulatory coordination rather than a traditional procurement contract with defined CLINs or award mechanisms.
General Info
Agency
NAICS
Place of Performance
Stockton, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
