Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Mossdale Tract Area Urban Flood Risk Reduction Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mossdale Tract Area Urban Flood Risk Reduction Project is a large-scale infrastructure initiative spanning 22,400 acres in San Joaquin County, California, encompassing Reclamation District 17 and portions of Stockton, Lathrop, Manteca, and unincorporated areas along the San Joaquin River and French Camp Slough. The project focuses on enhancing flood risk reduction through the construction and ongoing operation and maintenance of a range of multi-benefit components, including fix-in-place levee improvements, a dryland levee extension, ecosystem restoration, habitat enhancement, revegetation efforts, and the integration of recreational features along the levee system. These components are designed to address both flood protection and environmental sustainability, aligning with the State Plan of Flood Control and supporting regional resilience. The project is led by the San Joaquin Area Flood Control Agency, with environmental compliance overseen by state agencies such as the California Department of Fish and Wildlife and the Central Valley Flood Protection Board, requiring permits under the California Endangered Species Act for species including the California tiger salamander, riparian brush rabbit, and green sturgeon, as well as compliance with Fish and Game Code Section 1602 and CalGEM regulations regarding abandoned oil and gas wells. The project’s period of performance is scheduled from December 19, 2025, to February 2, 2026, though ongoing maintenance and ecological monitoring will extend beyond this initial timeline. While the scope is clearly defined with specific locations tied to Assessor’s Parcel Numbers and wetland delineations, there is no publicly available contract value, pricing structure, or line-item breakdown. The procurement is in presolicitation status with no formal contract clauses identified under the Federal Acquisition Regulation, and no evaluation factors, award methodology, or procurement-specific requirements such as unique entity IDs, small business set-asides, or contracting officer representatives have been disclosed. Key administrative contacts include Ryan Curry, Senior Project Manager, who serves as the primary point of liaison, and the agency’s mailing address in Stockton for formal correspondence. Environmental documentation, including the Draft Environmental Impact Report, must be submitted to the State Clearinghouse in Sacramento with specified hardcopy and electronic formats, and final acceptance of work will occur at the project sites under the authority of SJAFCA, with all activities requiring adherence to CEQA, CESA, and U.S. Army Corps of Engineers standards for wetlands and water resources. No formal delivery or packaging requirements are specified

General Info

Mossdale Tract flood project improves levees, restores habitat, and enhances recreation in San Joaquin County from December 2025 to February 2026.

Agency

California → San Joaquin County Area Flood Control Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

South Union Rd and Fig Rd, CA, 95337

Set-Aside

NONE

Documents

(7)

Mossdale Tract Area Urban Flood Risk Reduction Project Draft EIR NOC

PDFnotice-of-completion

Mossdale Tract Area Urban Flood Risk Reduction Project - CalGEM Well Abandonment Advisory

PDFspecial-notice

Mossdale Tract Area Urban Flood Risk Reduction Project Draft EIR Notice of Availability

PDFnotice-of-availability

CDFW Comment on Mossdale Tract Area Urban Flood Risk Reduction Project DEIR SCH No. 2022040471

PDFcomment

Notice of Determination - Mossdale Tract Area Urban Flood Risk Reduction Project

PDFnotice-of-determination

SCH Summary Form for Mossdale Tract Area Urban Flood Risk Reduction Project

PDFenvironmental-summary

03_Mossdale COMPLETE DEIR Dec 2025_OCR FLAT

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County Area Flood Control Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Joaquin County Area Flood Control Agency
Office AddressN/A
Contacts
Ryan CurrySenior Project Manager
Catherine McEfeeVice President

Interested Companies (1)

Show more
Environmental Science Associates
Los Angeles, CA

Full Description

Show more
The proposed project area covers 22,400 acres, including Reclamation District 17 ([RD 17], 16,110 acres) and portions of the cities of Stockton, Lathrop, Manteca, and unincorporated San Joaquin County. The RD 17 levee system is comprised of state-federal project levees (also referred to as State Plan of Flood Control [SPFC]) along the San Joaquin River and French Camp Slough. The proposed project would include the construction and operation and maintenance of flood risk reduction and multi-benefit components in and adjacent to the proposed project area. Project components include fix-in place improvements with habitat enhancement and revegetation, dryland levee extension, ecosystem restoration, and recreational features along the levee system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 15 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 21 hours ago

DEADLINE

in 26 days
View Details