Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Chowchilla Subbasin Groundwater Recharge Project 1 (Streambed Alteration Agreement No. EPIMS-MAD-40478-R4)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Chowchilla Subbasin Groundwater Recharge Project involves the construction of a flow diversion structure along or beneath the left bank levee of the Eastside Bypass in Madera County, California, to enhance aquifer recharge during periods of drought. The project includes the installation of a 36-inch diameter rubber gasket reinforced concrete (RGRCP) conveyance pipeline, a 14-foot diameter fish screen, a concrete cutoff wall, a reinforced concrete control box, and a reinforced concrete pump box, all designed to safely divert surface water into the subsurface. The effort is statutorily exempt from California Environmental Quality Act (CEQA) review under Executive Order N-7-22 due to the ongoing drought emergency and qualifies for exemption under Public Resources Code Section 21080(b)(4) and CEQA Title 14, Section 15269(c). The project is sited at three locations near Chowchilla—Haynes Parcel, Clayton Flood-MAR, and Vlot Parcel—each situated approximately 14 miles southwest of the city, with final construction activities occurring in the vicinity of Lincoln Road, Avenue 20, Avenue 21, and Road 3. The Central Valley Flood Protection Board is the approving agency, with Madera County serving as the lead agency and primary point of local administration. There is no formal contract value, pricing structure, or CLIN/SLIN data provided, indicating this is a preliminary or emergency-driven action not yet structured with standardized federal financial terms. The solicitation number is 19789, linked to the Streambed Alteration Agreement EPIMS-MAD-40478-R4, with a posting date of December 19, 2025, and an execution date of December 17, 2025. No federal acquisition regulation (FAR) clauses, federal contracting requirements, or socioeconomic certifications apply; the initiative operates under state authority without inclusion of federal procurement mechanisms such as WAWF invoicing, COR/COTR designations, TAS accounting codes, or UEI/CAGE identifiers. Performance will occur entirely within Madera County, with inspection and acceptance responsibilities held by state and county agencies, not by a formal contracting officer or technical representative. No delivery schedule, FOB terms, or submission deadline are explicitly defined, and proposals are to be filed with the Office of Land Use and Climate Innovation in Sacramento, though no formal bid process or evaluation criteria are documented. The

General Info

Drought emergency project diverting surface water to recharge aquifers in Madera County via pipeline and fish screen, state-exempted, no federal contracting terms.

Agency

California → Central Valley Flood Protection Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Chowchilla, CA

Set-Aside

NONE

Documents

(3)

Notice of Exemption - Permit No. 19790 - Chowchilla Subbasin Recharge Project

PDFnotice-of-exemption

Notice of Exemption - Permit No. 19788 - Chowchilla Subbasin Recharge Project

PDFnotice-of-exemption

Notice of Exemption - Permit No. 19789 Chowchilla Subbasin Recharge Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jennifer CallesSenior Environmental Scientist
Stephanie AnagnosonProject Manager

Full Description

Show more
To construct a flow diversion structure (Vlot) along and under the left (west) bank levee of the Eastside Bypass for groundwater recharge. The structure consists of a 36-inch diameter rubber gasket reinforced concrete (RGRCP) conveyance pipeline, a 14-foot diameter fish screen, concrete cutoff wall, reinforced concrete control box, and a reinforced concrete pump box.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details