Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Merced Irrigation District Water Resources Management Plan

Forecast
20097State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Merced Irrigation District Water Resources Management Plan, administered by the Central Valley Flood Protection Board, involves the authorization of critical water infrastructure in Merced County, California. Key components include Permit No. 20055 for the Owens Creek stream gauge station and associated erosion control measures, which feature a corrugated metal pipe recorder house, concrete foundations, and riprap with geotextile fabric. Additionally, Permit No. 20097 authorizes the Booster 5 Lateral Pipeline, utilizing a 30-inch diameter steel siphon pipe constructed prior to 1927 to transport irrigation water under Mariposa Creek. Both projects are categorized as exempt under the California Environmental Quality Act CEQA Section 15301, as they involve existing facilities with negligible expansion of use. The authorizations are managed by the Central Valley Flood Protection Board, with primary points of contact including Jordan Robbins, Michael Morris, and Bryan Kelly. The project areas are located within the Le Grand topographic quadrangle, specifically focusing on the maintenance and legal authorization of infrastructure installed prior to the Adopted Plan of Flood Control.

General Info

Central Valley Flood Protection Board authorizes water infrastructure maintenance in Merced County, California.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts3 people available
OfficeN/A
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist
Michael MorrisProject Manager
Bryan KellyDeputy General Manager

Full Description

Show more
To authorize the existing stream gauge station and erosion control measures on the right bank of Owens Creek. The stream gauge station consists of a 36-inch diameter corrugated metal pipe recorder house on top of a concrete foundation, a 30-inch diameter concrete pipe underneath the concrete foundation, and a leader pipe that extends into the Owens Creek floodway with a concrete footing. The erosion control measures include a 20-foot-by-25-foot section of geotextile fabric and riprap. The stream gauge station was installed prior to the Adopted Plan of Flood Control.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables encompass the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers, manholes, stormwater facilities, and site grading. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran, service-disabled veteran, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a performance bond, a payment bond, and proof of insurance from companies with an A.M. Best rating of A-VII or better. Compliance with North Carolina Administrative Code regarding Minority and Women-Owned Business requirements is mandatory, requiring the submission of a Good Faith Efforts Form and Table A. Project administration is managed by Willis Engineers on behalf of the City of Belmont, with payments processed via Applications for Payment due 30 days after presentation to the owner. Work must adhere to various industry standards, including AWWA Specification C-600 for pipelines and NEMA standards for electric motors.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements involve the demolition of existing facilities and the relocation of a fuel tank. The project must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is actively seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including bidder qualifications, past project experience, and management plans. Key contractual terms include a 5% retainage on progress payments and liquidated damages of $1,000 per calendar day. Compliance with the Davis-Bacon Act, American Iron and Steel requirements, and OSHA standards is mandatory. The successful bidder must provide performance and payment bonds equal to 100% of the contract amount and file required insurance within 15 days of the award.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including aggregate supply, asphalt paving, electrical work, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax to Veronica Garcia by the deadline of December 3, 2026, and must remain valid for 120 days. All participating subcontractors are required to maintain valid California contractor licenses and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance standards. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to a maximum of 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → Central Valley Flood Protection Board

Same awarding agency

NAICS: 237990
SLED
Natomas Cross Canal Berm and Channel Enhancements Project
Solicitation # 2022010387
The Natomas Cross Canal Berm and Channel Enhancements Project, managed by the Central Valley Flood Protection Board, involves critical infrastructure improvements on the right bank of the Natomas Cross Canal in Sutter County, California. The scope of work focuses on the replacement and enhancement of pump platforms, intake pipes, and the installation of fish screens. Key deliverables include the removal of existing pump platforms and support piles to be replaced with new steel pump platforms and catwalks, the reinstallation of existing pumps, and the replacement of 36-inch and 24-inch intake pipes. Specifically, the project requires the installation of a new pump intake structure and fish screen at the intake end of the existing 24-inch irrigation pipe. This project is identified under solicitation number 2022010387 and falls under NAICS code 237990. It is governed by several permits, including Permit No. 19699, and has been granted categorical exemptions from the California Environmental Quality Act under Sections 15301, 15302, and 15303 of the California Code of Regulations. These exemptions are based on the project involving the maintenance of existing facilities, replacement of structures at the same site with similar capacity, and the construction of small structures with negligible expansion of use. Primary points of contact for the project include Angela Nguyen-Tan of the Central Valley Flood Protection Board and Steve Willey.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Chowchilla Subbasin Groundwater Recharge Project 1 (Streambed Alteration Agreement No. EPIMS-MAD-40478-R4)
Solicitation # 19790
The Chowchilla Subbasin Groundwater Recharge Project, managed by the Central Valley Flood Protection Board and Madera County, involves the construction of flow diversion structures to facilitate groundwater recharge and mitigate drought conditions in Madera County, California. Specifically, the project includes the construction of the Clayton and Haynes structures along the Eastside Bypass levees. The scope of work entails the installation of rubber gasket reinforced concrete pipe conveyance pipelines, 14-foot diameter fish screens, concrete cutoff walls, and reinforced concrete control and pump boxes. The Haynes structure is located approximately 14 miles southwest of Chowchilla near the junction of Lincoln Road and Avenue 20. Under solicitation number 19789 and associated permits, the project is designated as exempt from the California Environmental Quality Act (CEQA) pursuant to Executive Order N-7-22 and relevant Public Resources Code sections due to its role in emergency drought response. Administrative oversight is provided by Project Manager Stephanie Anagnoson of Madera County and Senior Environmental Scientist Jennifer Calles of the Central Valley Flood Protection Board. The project is classified under NAICS code 237990 for other heavy engineering projects.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS