Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Recology Yuba Sutter

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Marysville, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Angela R Nguyen-TanSenior Environmental Scientist
Tom EnglerProject Contact

Full Description

Show more
To authorize the existing 123-foot diameter and 75-foot diameter storage tanks (combined capacity of 1.5 million gallons), above ground conveyance pipes, and pump station, originally approved as a temporary installation via Board Permit No. 19073, to be utilized for stormwater runoff management and treatment within the Yuba River Designated Floodway.

More opportunities from California → Central Valley Flood Protection Board

Same awarding agency

NAICS: 237990
SLED
Natomas Cross Canal Berm and Channel Enhancements Project
Solicitation # 2022010387
The Natomas Cross Canal Berm and Channel Enhancements Project, managed by the Central Valley Flood Protection Board, involves critical infrastructure improvements on the right bank of the Natomas Cross Canal in Sutter County, California. The scope of work focuses on the replacement and enhancement of pump platforms, intake pipes, and the installation of fish screens. Key deliverables include the removal of existing pump platforms and support piles to be replaced with new steel pump platforms and catwalks, the reinstallation of existing pumps, and the replacement of 36-inch and 24-inch intake pipes. Specifically, the project requires the installation of a new pump intake structure and fish screen at the intake end of the existing 24-inch irrigation pipe. This project is identified under solicitation number 2022010387 and falls under NAICS code 237990. It is governed by several permits, including Permit No. 19699, and has been granted categorical exemptions from the California Environmental Quality Act under Sections 15301, 15302, and 15303 of the California Code of Regulations. These exemptions are based on the project involving the maintenance of existing facilities, replacement of structures at the same site with similar capacity, and the construction of small structures with negligible expansion of use. Primary points of contact for the project include Angela Nguyen-Tan of the Central Valley Flood Protection Board and Steve Willey.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Chowchilla Subbasin Groundwater Recharge Project 1 (Streambed Alteration Agreement No. EPIMS-MAD-40478-R4)
Solicitation # 19790
The Chowchilla Subbasin Groundwater Recharge Project, managed by the Central Valley Flood Protection Board and Madera County, involves the construction of flow diversion structures to facilitate groundwater recharge and mitigate drought conditions in Madera County, California. Specifically, the project includes the construction of the Clayton and Haynes structures along the Eastside Bypass levees. The scope of work entails the installation of rubber gasket reinforced concrete pipe conveyance pipelines, 14-foot diameter fish screens, concrete cutoff walls, and reinforced concrete control and pump boxes. The Haynes structure is located approximately 14 miles southwest of Chowchilla near the junction of Lincoln Road and Avenue 20. Under solicitation number 19789 and associated permits, the project is designated as exempt from the California Environmental Quality Act (CEQA) pursuant to Executive Order N-7-22 and relevant Public Resources Code sections due to its role in emergency drought response. Administrative oversight is provided by Project Manager Stephanie Anagnoson of Madera County and Senior Environmental Scientist Jennifer Calles of the Central Valley Flood Protection Board. The project is classified under NAICS code 237990 for other heavy engineering projects.
Other Heavy and Civil Engineering Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS