Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

San Jose Creek Multi-Use Bikeway Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Pomona is implementing the San Jose Creek Multi-Use Bikeway Project, a Tier 1 priority initiative to develop a 3.5-mile off-road bike and pedestrian path between Temple Avenue and Murchison Avenue. The project aims to provide a safer transit corridor connecting key destinations, including California Polytechnic University at Pomona, the Los Angeles County Fairplex, regional transit hubs, parks, schools, and shopping centers. The infrastructure will feature a 10-foot wide path with 2-foot shoulders, constructed using asphalt concrete over a crushed miscellaneous base. Key project components include 15 access points, six at-grade street crossings, stormwater capture treatments, concrete retaining walls at the SR 71 undercrossing, and three landscaped trailheads equipped with bike racks, wayfinding signage, and solar post lights. The project includes the installation of approximately 77 solar-powered LED post lights and traffic signal modifications at seven intersections. Construction is anticipated to occur between January 2026 and July 2027, with a total duration of 12 to 18 months. Environmental compliance has been established through a Final Initial Study and Mitigated Negative Declaration, with the project officially approved on August 3, 2026. Special requirements for the contractor include the use of best-available noise-reducing technology, the installation of temporary sound barriers with a Sound Transmission Class rating of 30 or greater near sensitive receptors, and the placement of conspicuous site signage including permit numbers and violation reporting contacts.

General Info

Pomona building 3.5-mile bikeway linking Cal Poly, Fairplex, transit, and schools with safety and sustainability features by August 6, 2026.

Agency

California → City of Pomona

Place of Performance

Along San Jose Creek between Temple Avenue and Murchison Avenue, Pomona, CA, 91766

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pomona
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Pomona
Office AddressN/A
Contacts
Arnold DichosaCity Engineer

Full Description

Show more
The City of Pomona (City) is proposing the San Jose Creek Multi-Use Bikeway Project (proposed project), which consists of the development of a 3.5-mile off-road bike and pedestrian path along a segment of San Jose Creek between Temple Avenue and Murchison Avenue in Pomona, California. The proposed project is identified as a Tier 1 priority project in the City’s Active Transportation Plan; it is envisioned to provide pedestrians and bicyclists a safer off-street path of travel between community destinations and amenities in the city, which include the California Polytechnic University at Pomona, the Los Angeles County Fairplex, regional transit and bikeway connections, various parks and schools, and commercial shopping centers. The proposed project would consist of 15 access points, including 6 at-grade street crossings. The proposed project would also feature stormwater capture treatments, trailhead gateways and access points, wayfinding and safety signage, and at-grade safe street crossings along the 3.5-mile alignment.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; extensive pipeline and utility work involving tunneling, boring, jacking, and the installation of steel casing and cathodic protection; and surface improvements including asphalt paving, lighting, and landscaping. Additionally, the project requires environmental and support services such as storm water pollution prevention, quality control, and waste management, as well as the supply of ready mix, precast concrete, and manhole materials. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. All quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 14 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
Bridge Front Upgrade Project (Re-Bid)
Solicitation # ITB27-6310-01B
The City of Lauderdale Lakes is soliciting bids for the Bridge Front Upgrade Project (ITB27-6310-01B) through its Public Works Administration. The scope of work involves the installation of decorative walls and pavers, swale regrading, minor drainage modifications, curb and pavement restoration, and signing and marking. All work must adhere to applicable building codes, City standards for dust nuisance abatement, and ADA guidelines for detectable warnings. Bids must be submitted via the City's eProcurement portal by December 9, 2026, at 3:00 PM. Qualified firms must demonstrate a track record of completing at least two similar projects in Florida and provide necessary licensing, certificates of competency, and a federal tax ID. Required submission documents include a bid bond, certificates and affidavits for bonds, and forms for subcontractors and principal materials manufacturers. The City evaluates respondents based on the licensing of supervising personnel, owned equipment, and confirmation of a drug-free workplace. The contract includes strict compliance requirements, including the Florida Trench Safety Act, E-Verify for employment eligibility, and certifications regarding scrutinized companies and foreign concerns. The successful contractor must provide performance and payment bonds in accordance with Florida Statutes and maintain all required insurance, submitting renewals 30 days prior to expiration. Payments are processed through the City's Accounts Payable Department within 30 days of invoice receipt, with a 15-day window for the City to notify the contractor of any disputed amounts.
Public Works Administration

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Tom Nevers Road Multi-Use Path Project
Solicitation # 2026-DPW-1007
The Town of Nantucket Department of Public Works is soliciting bids for the Tom Nevers Road Multi-Use Path Project, which involves the construction of a multi-use path and raised boardwalk. The scope of work includes selective demolition, salvage, grading, drainage improvements, erosion and sediment controls, and the installation of permanent signage and pavement markings. The project also requires loam, seeding, planting, and the restoration of disturbed pavement shoulders. All work must be completed by May 28, 2027, with a final revised project schedule due to the Engineer within 60 days of the Notice to Proceed. Bids are due by November 17, 2026, at 2:00 pm via the Town's e-Procurement Portal. The contract will be awarded to the lowest responsible and eligible bidder who meets specific criteria, including the ability to furnish labor that works in harmony and certification that all employees have completed a 10-hour OSHA-approved construction safety course. Required submissions include a bid deposit of five percent of the base bid, current certificates of insurance, and signed certifications regarding tax compliance, non-collusion, prevailing wages, and EEO/AA and DBE compliance. The successful bidder must provide performance and payment bonds equal to 100 percent of the contract price within 10 days of the award notification.
Department of Public Works

POSTED

about 14 hours ago

DEADLINE

in 10 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS