Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

San Jose Creek Multipurpos Path Project

Forecast
EPIMS-SBA-41011-R5State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Jose Creek Multipurpose Path Project, managed by the City of Goleta and overseen by the California Department of Fish and Wildlife (CDFW) under Streambed Alteration Agreement EPIMS-SBA-41011-R5, involves the construction of a continuous multipurpose path along San Jose Creek in Santa Barbara County. The project connects existing paths from the Goleta Slough in the south to a point north of the US Route 101 crossing. The development is divided into two segments: a northern segment consisting of a 2,400-foot paved path and a southern segment approximately one mile in length. Key infrastructure includes a pedestrian crossing over San Jose Creek, a pedestrian box culvert under SR 217, and a concrete barrier with a bicycle and pedestrian rail to separate the path from SR 217. A recent amendment to the agreement, approved on June 2, 2026, pursuant to Fish and Game Code section 1602, increases the allowable temporary impact acreage from 0.24 to 0.34 acres. Additionally, the amendment extends the deadlines for critical mitigation deliverables, including the habitat mitigation plan, the submittal of the endowment, and the draft conservation easement. The project must adhere to a Mitigation Reporting or Monitoring Plan adopted by the CDFW to ensure that environmental impacts within the agency's jurisdiction are managed appropriately. Primary points of contact for the project include Teresa Lopez for the City of Goleta and Kelly Schmoker for the CDFW.

General Info

Goleta builds 1.4-mile paved trail along San Jose Creek with CDFW-approved habitat impact increase and extended mitigation deadlines.

Agency

California → City of Goleta

Place of Performance

Goleta, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Goleta
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Goleta
Office AddressN/A
Contacts
Kelly SchmokerSenior Environmental Scientist (Specialist)
Teresa LopezProject Manager

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has amended Streambed Alteration Agreement (EPIMS-SBA-41011-R5), pursuant to Fish and Game Code section 1602, the project Applicant, City of Goleta. The project is the construction of a section of a multipurpose path along San Jose Creek in the City of Goleta that will eventually connect two existing multipurpose paths to create one continuous one. It will run generally from the terminus of an existing multipurpose path at Goleta Slough in the south to the terminus of an existing multipurpose path in the north just north of where San Jose Creek crosses underneath United States Route 101. For construction purposes, the path is split into two segments, northern and southern. Both the northern and southern segments of the project take place within the limits of the stream; however, most project activities are taking place along the top of the bank with no activities within the bed of the stream. The northern segment will consist of a paved multipurpose path approximately 2,400 feet in length ranging from 10 feet to 14 feet in width, including shoulder widths. The maximum excavation depth will be approximately 3.5 feet. The southern segment of the project will consist of a paved multipurpose path approximately 1 mile in length ranging from 8 to 12 feet wide including shoulder widths. It will also include a 2-foot-wide and 3-foot-tall concrete barrier with a bicycle/pedestrian rail for purposes of separating the path from SR 217. The southern segment will include the construction of a pedestrian crossing over San Jose Creek near the northern end and the construction of a pedestrian box culvert under SR 217 near the southern end. This Amendment is to increase the acreage of temporary impacts from 0.24 acre to 0.34 acre and to extend the due date for several mitigation deliverables (submittal of habitat mitigation plan, submittal of endowment, draft conservation easement).

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 8 hours ago

DEADLINE

in 27 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS