Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

San Lorenzo Way Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Lorenzo Way Bridge Replacement Project, managed by the County of Santa Cruz Department of Public Works, involves the replacement of the aging and historic single lane bridge structure number 36C-0085 over the San Lorenzo River. The scope of work includes modifying bridge approaches to correct steep grades and implementing improvements at the SR 9/San Lorenzo Way intersection to enhance highway merging. To maintain land access on the east side of the bridge during construction, an existing private gravel road will be utilized as a temporary access route. The project is governed by Lake and Streambed Alteration Agreement EPIMS-SCR-64152-R3 and was approved by the California Department of Fish and Wildlife on December 31, 2025. Environmental protections are a primary requirement, mandating that all replacement work remain outside the ordinary high-water marks of the San Lorenzo River and that construction activities be isolated to the upper banks above the river channel. The project is located at 6676 Rose Acres Lane, Felton, California, and has been determined to have no significant environmental effect within the jurisdiction of the California Department of Fish and Wildlife.

General Info

Santa Cruz County replaces aging San Lorenzo Way Bridge with improved safety, access, and environmental compliance.

Agency

California → Santa Cruz County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, 95018

Set-Aside

NONE

Documents

(1)

Notice of Determination for San Lorenzo Way Bridge Replacement Project EPIMS-SCR-64152-R3

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Cruz County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Santa Cruz County
Office AddressN/A
Contacts
Todd SexauerLead Agency Contact
Alexis HarrisonEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SCR-64152-R3), pursuant to Fish and Game Code section 1602, the project Applicant, County of Santa Cruz, Department of Public Works, as represented by Amber Myer. The Project will replace an aging and historic single lane bridge structure (bridge number 36C-0085) carrying San Lorenzo Way over the San Lorenzo River. In addition to replacing the bridge, the proposed Project includes modifications to the bridge approaches to correct the steep grade and improvements at the SR 9/San Lorenzo Way intersection to facilitate merging on and off the highway. The Project also includes using an existing private gravel road as a temporary access road to land uses on the east side of the bridge during construction. All work for the bridge replacement will be outside the ordinary high-water marks of the San Lorenzo River. Project construction activities will be isolated to the upper banks above the San Lorenzo River channel.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
Solicitation W9127N26BA024 is a total small business set-aside for the replacement of the Navigation Lock 1 Bridge at the Bonneville Lock and Dam in Cascade Locks, Oregon. The project involves replacing the existing bridge with a new single-span steel girder bridge featuring a concrete deck, two travel lanes, and a sidewalk. The scope includes partial demolition of the existing bridge, construction of approach roadways, and the installation of a concrete stub abutment anchored into rock and a concrete abutment supported by drilled shafts. Due to the requirement that vehicular access remain open throughout construction, the project will likely be executed in phases. Additional technical requirements include lead and asbestos removal, working within environmental and seasonal restrictions, and performing barge crane lifting near high-voltage power lines. The procurement is managed by the USACE Portland District, with a project magnitude estimated between 10 million and 25 million dollars. Following several amendments, the solicitation closing date was extended to October 8, 2026. Bids must be submitted electronically in PDF format to the designated points of contact, as hard copies will not be accepted. Site visit attendees must be U.S. citizens and possess a Real ID for access. The contract includes specific regulatory requirements, such as the use of a professional archaeological monitor during ground disturbance and strict adherence to employment eligibility verification via Form I-9. Foreign contracting parties are subject to a 2 percent Federal excise tax withholding unless specific IRS documentation is provided.
W071 Endist Portland

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
Federal
ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road
Solicitation # 69056726R000010
This contract opportunity is issued under the Idaho, Montana, and Surrounding Areas MATOC IDIQ vehicle for a federally funded transportation project along the Western Heritage Byway – Swan Falls Road, located approximately seven miles south of Kuna, Idaho. The work involves comprehensive highway improvements including shoulder widening, paving, signage installation, parking lot enhancements, and culvert replacements over a stretch of up to 8.5 miles. The project is structured with four separate bid schedules, but only one will be awarded under a Firm-Fixed-Price task order. Estimated value ranges between $5 million and $10 million, with a tentative solicitation date in summer 2026 and planned completion by summer 2027. Performance is governed by the Federal Highway Administration’s Standard Specifications for Construction of Roads and Bridges (FP-24), along with FLH Standards 619-3 and 635-1, which dictate material, construction, and traffic control requirements. Detailed plans, including permanent traffic control layouts and pavement marking details, are available as attachments. The contract will be administered by the Western Federal Lands Division of the Department of Transportation, based in Vancouver, Washington, with inquiries directed to the contracting office. Only prequalified IDIQ contractors eligible under the MATOC program may respond, and interested parties must register on SAM.gov to access the Interested Vendors List. No evaluation factors, contract clauses, representations, certifications, or detailed pricing structure beyond the estimated range have been published at this pre-solicitation stage. Notification of solicitation posting is available by following the opportunity on SAM.gov.
690567 Western Federal Lands Division

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
Federal
New Fort Bliss Paving IDIQ Contract
Solicitation # W911SG27BA002
The Mission and Installation Contracting Command (MICC) Fort Bliss is soliciting a single award, firm-fixed-price Indefinite Delivery/Indefinite Quantity (IDIQ) construction contract for the repair, reconstruction, and maintenance of paving infrastructure. The scope of work covers Fort Bliss, Texas, and surrounding areas, including training areas in Dona Ana and Otero counties of New Mexico. This requirement is a 100% competitive set-aside for 8(a) certified firms under NAICS code 237310, with an estimated magnitude exceeding 10 million dollars. The contract structure consists of a twelve-month base year and four twelve-month option periods, with the government reserving the right to unilaterally exercise each option. The contractor is responsible for providing all supervision, labor, materials, and equipment necessary to complete various task orders, which range in value from 2,000 to 3 million dollars. A key requirement is the provision of a non-subcontracted Superintendent who must be a direct employee of the prime contractor and present at all times during work. Technical specifications are governed by Unified Facilities Guide Specifications (UFGS) and state standards from TxDOT and NMDOT, covering asphalt and concrete paving, earthwork, storm drainage, and traffic signage. Bidders must provide a bid guarantee of 20% of the bid price or 3 million dollars, whichever is less, along with performance and payment bonds equal to 100% of the original contract price. All work must comply with Davis-Bacon Act wage determinations and federal safety and environmental regulations.
W6QM Micc-Ft Bliss

POSTED

about 7 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS