Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Saba County — CSJ 6508-35-001 — September 2026 Letting — Local-Let Maintenance

Closed
6508-35-001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 324121
New
Federal
FA8501-27-RAPID-PAVE-OTA
Solicitation # FA8501-27-RAPID-PAVE-OTA
The Department of the Air Force, 78th Civil Engineer Group, is seeking industry solutions to restore, modernize, and sustain critical airfield infrastructure at Robins Air Force Base, Georgia. Executed under the Robins Agile Practices for Infrastructure Development (RAPID) framework and the statutory authority of 10 U.S.C. 2808a, this project utilizes a Build-Only Other Transaction Agreement (OTA) approach. The scope of work involves the repair and replacement of runway 3901 pavement and shoulders, the south runway overrun, Taxiway C (Facility 3931), and drainage and storm-drain disposal systems at Facility 8700. The estimated magnitude of construction for this effort is between 58 million and 108 million dollars, with a total contract period of performance of 1,120 calendar days after the Notice to Proceed. The government is utilizing a two-step, best-value selection process. Step one requires a Phase 1 Solution Brief, due by 3:00 PM EST on October 30, 2026, which must demonstrate at least five years of experience in comparable government runway or taxiway projects. Short-listed firms will advance to step two, consisting of interactive pitch presentations and the submission of a formal price proposal. Evaluation factors focus on past performance in restricted airfield environments, the qualifications of key personnel, technical understanding of the 100 percent government-furnished design, and financial bonding capacity. Special emphasis is placed on managing congested site logistics, mitigating environmental risks related to PFAS-impacted soil, and minimizing disruptions to active aircraft operations.
FA8501 Opl Contracting Afsc/pzio

POSTED

about 14 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Texas Department of Transportation has issued solicitation 6508-35-001 for local-let maintenance involving emulsion work on US Highway 190 in San Saba County. The contractor is responsible for supplying asphalts, oils, and emulsions under Item 8003 of the TxDOT Standard Specifications, delivered to designated locations as specified in individual work orders. The initial period of performance is 365 calendar days, with a potential extension up to 730 days. Key performance requirements include strict temperature controls between 120°F and 140°F at delivery, the use of sealed transport vehicles, and the provision of plant-level sampling. Acceptance occurs at the delivery site and is verified by the Engineer via signed material tickets. The contract is governed by project-specific special provisions and the September 1, 2024, edition of the TxDOT Standard Specifications. Bidders must provide a 2,000 dollar bid bond and adhere to several certifications, including E-Verify participation, nondiscrimination compliance, and the disclosure of interested parties via Form 1295 for contracts exceeding 1 million dollars. Additional requirements include certifications against the discrimination of firearm entities and prohibitions against surveillance or intimidation of state officials. Blake Stembridge, P.E., serves as the primary point of contact for contract administration. Proposals must be submitted using official Department forms, with materials supplier questionnaires due ten days prior to the letting date.

General Info

TxDOT maintenance contract for San Saba County, Texas, with a September 2026 deadline.

Place of Performance

San Saba, TX, USA

Set-Aside

NONE

Documents

2

MMC-6508-35-001 Materials Maintenance Contract Plan

PDF, High priority: read this firstsow
High

Proposal 6508-35-001 San Saba US 190 Emulsion Work

PDF, High priority: read this firstproposal
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeTX, USA
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
San Saba County — CSJ 6508-35-001 — September 2026 Letting — Local-Let Maintenance

More opportunities from Texas Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
BRIDGE REPAIR
Solicitation # 6510-75-001
Solicitation 6510-75-001 is a contract issued by the Texas Department of Transportation for callout bridge structure repair on IH 20 and other roadways within Ector, Crane, Ward, Loving, Winkler, Midland, Stanton, Andrews, and Upton Counties. The scope of work involves non-site-specific repairs, including concrete structure and beam repairs utilizing carbon fiber reinforced polymer and strand splicing. The project is to be completed within 365 calendar days, with work executed via individual emergency or routine work orders issued by the Engineer. The contract is awarded to the lowest bidder, provided the bid is not mathematically unbalanced and the bidder complies with DHS E-Verify and other state and federal certifications, including nondiscrimination laws under 49 CFR 21 and various Texas Government Code boycott and discrimination prohibitions. Technical requirements mandate adherence to the September 1, 2024, Standard Specifications for Construction of Highways, Streets and Bridges and the Texas Manual on Uniform Traffic Control Devices. Specific quality standards include AWS D1.1, D1.5, and ANSI/AWS D1.3 for welding, and AASHTO LRFD specifications for steel bridge fabrication. All work is subject to inspection by Maintenance Supervisors, with payment requests certified by the Odessa Maintenance Office. Safety protocols require personnel to wear ANSI 107-2004 Class 2 or 3 high-visibility apparel. Compensation includes mobilization paid per county, while specific repair costs are negotiated and agreed upon prior to the commencement of work.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS