SANTA CRUZ SWINE BARN DEMO

Closed
014-26-009State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Unclaimed Freight Company Building
Solicitation # 27-2084-1118
Solicitation RFQ No. 27-2084-1118, issued by the City of Newport News Codes Compliance department, seeks a contractor for the demolition and removal of a 17,775-square-foot commercial structure located at 10615 Jefferson Avenue, Newport News, VA. The building has been deemed an unsafe structure and fire hazard, leading to a court-ordered demolition. The scope of work includes the removal and legal disposal of all personal property and debris, though a specific revision in Addendum 1 excludes the removal of the concrete slab. The project must be completed within 15 days, with liquidated damages of 500.00 dollars per calendar day assessed for delays beyond the substantial completion date. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price, considering factors such as technical capacity, past performance, and financial resources. Bidders must submit a bid bond of 5 percent of the bid amount, a W-9, and a list of at least three similar projects completed within the last five years. The successful contractor must adhere to the Hampton Roads Planning District Commission Regional Construction Standards, Sixth Edition, and the Newport News City Code. Additionally, the contractor is required to use the Projectmates system for electronic invoicing and must comply with various federal and state nondiscrimination and safety laws. Payment terms are set to Net 30 Days unless otherwise specified.
Codes Compliance

POSTED

about 17 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract governs the complete demolition of two existing livestock barn structures at the Santa Cruz County Fairgrounds, involving removal of all wood framing, metal roofing, concrete footings, columns, knee braces, and associated components, along with proper disposal of all debris. Electrical systems, including exterior panels and underground conduits, must be deactivated, severed, and capped in place, while all barrels secured to building columns are to be removed and disposed of. Any surfaces damaged during demolition must be patched and repaired to match existing materials and grades, and the site must be graded and backfilled to restore original contours. The "Mel McCandless" signage is to be carefully salvaged and offered to the owner for preservation. The project requires strict adherence to the demolition plan outlined in drawing A 1.2, along with protection of existing infrastructure such as paving, swine wash racks, hose bibs, and water lines. A Stormwater Pollution Prevention Plan (SWPPP) must be developed, installed, and maintained as required by local jurisdiction, included in the base bid cost. Waste diversion goals mandate recycling or salvaging at least 75% of all construction debris, with a target of 80%, and documentation must be submitted to the Environmental Spec Coordinator at least seven working days before final inspection. All materials must be delivered F.O.B. destination in manufacturer’s unopened packaging with labels intact, stored in dry, ventilated conditions, and handled per manufacturer guidelines; no additional charges are permitted for packing, unpacking, drayage, or insurance. The work must comply with Cal/OSHA and California Department of Industrial Relations’ Construction Safety Orders, specifically Article 31 on Demolition, and all labor must be performed by skilled workers meeting the highest industry standards. The contractor must submit a preliminary construction schedule showing critical path tasks and milestones, with a key deadline for submittals by July 15, 2026, and is required to provide certified payroll records for DIR and CCA, maintain cost-accounting records, and submit notarized payment applications in PDF format. A performance bond and payment bond, each equal to 100% of the contract price, are required from a California-admitted surety, alongside employers’ liability insurance of $2 million and workers’ compensation coverage per state statutory limits. The contractor must comply with prevailing wage requirements, be registered with DIR under Labor Code section 1725.5, and meet DVBE participation goals of three percent. Non-discrimination, ADA

General Info

Demolition of two pole barns in California including removal, repair, grading, and strict environmental compliance.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

9

014-26-009 Santa Cruz Swine Barn Demo Addendum No.1

PDF, High priority: read this firstamendment
High

OSFM Stamped Plans Barns Demo - Fire Apparatus Access Site Plan

PDF, High priority: read this firstsite-plan
High

Santa Cruz County Fair Swine & Sheep/Goat Barn Demolition Project Manual

PDF, High priority: read this firstspecifications
High

Santa Cruz Swine Barn Demo Project Manual 014-26-009

PDF, High priority: read this firstspecifications
High

MAP SCCF Livestock Pavilion Site Plan 4.6.2026

PDF, Low priorityother
Low

OSFM Building Permit 26-N-1936-C-PI for SheepGoat Barn 2

PDF, Low prioritypermit
Low

OSFM Building Permit 26-N-1936-C-PI for Swine Barn Demo

PDF, Low prioritypermit
Low

INDIVIDUAL SHEETS (3).zip

ZIP

SCCF-Swine & Goat Barn_6.15.26.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Construction Authority
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The project will consist of labor, equipment, and materials to demolish two existing open pole barn structures • Roofing: Remove and dispose of existing metal roofing. • Roof Framing: Remove and dispose of wood rafters, purlins, and beams. • Columns: Remove and dispose of wood columns and knee braces. • Footings: Remove and dispose of concrete footings. • Electrical: Remove existing exterior electrical panels, disable, cut, and cap underground conduit and wire in place. Coordinate with Owner before disposing of panels. • Barrels: Remove and dispose of all existing barrels strapped to building columns. • Patching & Repair: Patch and repair all existing surfaces damaged during demolition to match existing materials and grades within the project area. • Building Description: Existing structures are wood construction with metal roof over wood rafters over wood beams over wood columns with knee braces and concrete footings. This area is used to house livestock, and no hazardous materials are to be stored in and around the work area. 2. SITE WORK: • Demolition Plan: Per sheet A 1.2 of the demolition plans. • Grading and Backfilling: All holes and trenches created from demolition and removal shall be backfilled and compacted to match existing grades and surface finishes. • Protection in Place: Protect existing paving, swine wash rack, hose bibs, and water lines per demolition notes. • Signage Salvage: Carefully remove "Mel McCandless" signage and offer to Owner to retain for preservation. WPPP AND EROSION CONTROL: • Contractor shall provide SWPPP as required by local jurisdictions, preparation of plans, installation of plan, and maintenance included in the base bid cost. 4. WASTE DIVERSION: • A minimum of 75% (goal to increase to 80%) of construction waste generated at this site shall be diverted to recycle or salvage. Provide documentation to Environmental Spec. Coordinator at least 7 working days prior to requesting final inspection.

More opportunities from California Construction Authority

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS