SB 1878 MELVIN KIP HOLDEN PEDESTRIAN BRIDGE IMPROVEMENTS AT HARDING BLVD
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements project involves the furnishing and installation of a prefabricated pedestrian bridge measuring approximately 8 by 110 feet across Monte Sano Bayou. The scope of work includes the demolition of existing bridge structures, the installation of rip rap in the channel, and the addition of concrete paving to connect the new bridge to existing pathways on both sides, along with other associated miscellaneous tasks. This solicitation is being managed by BREC, with a non-mandatory pre-bid conference scheduled for October 14, 2026, at 9:00 AM CST at 3280 Harding Blvd. in Baton Rouge. Bids must be submitted by the deadline of October 27, 2026, with the official bid opening taking place at 2:00 PM CST at the BREC Administration Building located at 6201 Florida Blvd, Room 1501, Baton Rouge, Louisiana.
General Info
Agency
Place of Performance
USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
