SCADA and Remote Control System Integration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract calls for the implementation of an integrated SCADA system with remote access controls designed to monitor and manage filtration and reverse osmosis processes at the water treatment facility operated by the City of Calhoun in Georgia. The system must enable real-time data collection, automated process control, and secure remote operation to enhance efficiency, reliability, and response times for water treatment operations. All components must be fully interoperable with existing infrastructure and compliant with industry standards for water utility automation and cybersecurity. The contract is structured as a subcontract with a NAICS code of 541330, indicating it falls under engineering services. The posting date is June 29, 2026, and responses are due by July 30, 2026, at 3:00 PM. The place of performance is located within the jurisdiction of the City of Calhoun, Georgia, though specific address details are not provided. The solicitation number is not listed, and there is no set-aside designation specified, meaning the subcontract is open to all qualified bidders regardless of business size or ownership characteristics. All work must be executed to meet operational requirements for uninterrupted water service and regulatory compliance.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
