Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

SCADA and Telemetry System Deployment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the design, installation, and configuration of SCADA and telemetry systems to enable real-time remote monitoring and control of flow operations across five distinct basins. This effort is critical for ensuring efficient water management, precise flow regulation, and timely response to operational conditions within the irrigation infrastructure. The scope requires robust system integration capable of collecting, transmitting, and analyzing data from remote sensor networks, with an emphasis on reliability, scalability, and continuous operational uptime under variable environmental conditions. The work is structured as a subcontract under the Consolidated Irrigation District in California, with the North American Industry Classification System code 541330 indicating engineering services related to systems design and implementation. The project is scheduled for posting on May 29, 2026, and performance is expected to occur across multiple geographic locations within the district’s service area, though exact locations are not specified. The contract demands technical expertise in industrial automation, telemetry protocols, data communication systems, and compliance with regional water control standards, with the ultimate goal of modernizing legacy monitoring capabilities to support sustainable and data-driven irrigation operations.

General Info

Design, install, and configure SCADA and telemetry systems for real-time irrigation flow monitoring across five basins.

Agency

California → Consolidated Irrigation District

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of E202610000147.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Recharge Basin Flow Measurement and Modernization Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Consolidated Irrigation District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Consolidated Irrigation District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design, install, and configure SCADA and telemetry systems for real-time remote monitoring of flow and control operations across five basins.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS