Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Scalable Implement for Lunar Trenching

Active
NASA-SBIR-185596SBIR / STTR

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Scalable Implement for Lunar Trenching (SILT) project, under solicitation NASA-SBIR-185596, focuses on developing an analytical model and a TRL 4 undercutting auger prototype to advance lunar trenching capabilities. Managed by the NASA SBIR/STTR Program and performed at the Kennedy Space Center, the initiative aims to enable the construction of 3-meter deep trenches for buried utilities, site preparation, and in-situ resource utilization. The project will characterize key performance metrics such as excavation force and regolith throughput, validating these models through testing in lunar regolith simulant to support the Artemis program and long-term lunar sustainability goals. The SILT technology provides significant operational benefits by allowing for the simultaneous excavation and burial of utilities, which improves thermal stability and mechanical protection for lunar infrastructure. With a high-throughput capacity of 100 metric tons per hour, the system is designed to support the extraction of volatiles like helium-3, hydrogen, and water for terrestrial markets, as well as providing feedstock for 3D-printed roads and berms. This scalable solution addresses critical gaps in NASA's Excavation, Construction, and Outfitting road map, reducing the mass required for launch from Earth and enhancing the commercial viability of lunar surface operations.

General Info

NASA project developing a lunar trenching auger prototype for infrastructure and resource extraction.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNational Aeronautics and Space Administration → NASA SBIR/STTR Program
Contacts4 people available
OfficeUSA
Office AddressUSA
Contacts
Nathan J GelinoProject Manager
Gabriella BlacknerPrincipal Investigator
Jason L KesslerProgram Director
Carlos TorrezProgram Manager

Full Description

Show more
This project advances lunar trenching capabilities through the development of a new analytical model and testing of a TRL 4 undercutting auger prototype, called Scalable Implement for Lunar Trenching (SILT). The analytical model investigates high-throughput regolith trenching with SILT for NASA's Artemis program by characterizing key performance metrics, including excavation force, regolith throughput, tractive force, and plunge characteristics for trench initiation. A TRL 4 prototype will be tested in representative lunar regolith simulant to validate model predictions and refine design parameters. Furthermore, a trench stability analysis will be completed to ensure construction of the 3-meter deep trenches are properly modeled for the lunar environment and the undercutting auger.The findings from this work will inform future trenching implement designs to directly support Artemis mission objectives and NASA’s long-term lunar sustainability goals under the Space Technology Mission Directorate (STMD). Beyond NASA programs, the SILT trenching technology support broader lunar surface operations and commercial applications. Its capabilities for high-throughput regolith processing (100 metric tons per hour) supports processing of lunar-derived volatiles such as helium-3, hydrogen, and water. These volatiles are primarily targeted for terrestrial markets, ensuring commercial viability independent of in-space demand. Additional commercial applications include lunar site preparation and in-situ resource utilization (ISRU), such as trenching for feedstock supply in 3D printing of roads and berms. The scalability of the SILT design allows integration into diverse lunar excavation architectures, ensuring long-term utility across multiple lunar programs.
Benefits: SILT directly addresses NASA’s need for regolith trenching, enabling efficient, scalable site preparation for lunar infrastructure. As identified in NASA’s Excavation, Construction, and Outfitting (ECO) Capability road map, trenching is currently limited to shallow depths and requires advancement to support buried utilities, site preparation, and ISRU. This project will develop and test an efficient trenching solution that will be capable of reaching 3-meter depths at full scale while also maturing a prototype suitable for near-term CLPS demonstration. This capability supports Artemis and Moon to Mars Objectives, including LI-4 (advanced manufacturing and autonomous construction) and LI-8 (infrastructure maximizing in-situ resource use). The system enables “utility corridors” for power, communication, and fluid transfer, improving mechanical protection and thermal stability. Regolith burial mitigates extreme lunar temperature fluctuations, providing passive insulation for buried infrastructure. Unlike conventional trenching methods, the undercutting auger’s efficient regolith handling allows simultaneous excavation and burial of utilities, reducing time, energy, and mission complexity. In addition to site preparation, the system enhances ISRU operations (LI-7), particularly by integrating with existing excavation architectures. It can remove dry overburden to expose ice-rich regolith, reducing energy requirements for resource extraction and optimizing ISRU processing efficiency. Its continuous operation and high throughput also support bulk regolith handling for additive construction, roads, and berms, accelerating lunar surface development while minimizing mass launched from Earth. By providing a scalable, energy-efficient trenching solution, this project addresses critical gaps in NASA’s lunar infrastructure plans, ensuring that trenching capabilities are developed to meet Artemis goals. The SILT undercutting auger has many commercial applications beyond NASA, particularly in lunar resource extraction and infrastructure development. The full-scale SILT implement is capable of high-throughput regolith processing at 100 metric tons per hour to extract helium-3, hydrogen, and water. Interlune has seen strong interest to date in lunar volatiles, driven by terrestrial markets, ensuring commercial viability independent of in-space demand. Beyond resource extraction, the undercutting auger enables efficient lunar site preparation, supporting commercial applications such as road construction, berms, radiation shielding, and foundation development. The auger facilitates in-situ resource utilization (ISRU) by providing regolith feedstock for 3D-printed habitats and industrial manufacturing, advancing lunar settlement sustainability. Using in-situ regolith eliminates the need to transport materials from Earth, significantly reducing costs. The system’s continuous operation further enhances construction efficiency, reducing time and energy requirements for large-scale infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 541715
New
Federal
Fast Assessment of Solutions, Therapeutics, Pharmaceuticals, and SupplieS (FASTPASS) Innovative Solutions Opening
Solicitation # ARPA-H-SOL-26-160
The Fast Assessment of Solutions, Therapeutics, Pharmaceuticals, and Supplies (FASTPASS) program, under solicitation ARPA-H-SOL-26-160, is an initiative by the Advanced Research Projects Agency for Health (ARPA-H) to develop a near real-time, non-destructive, AI-enabled screening system. The goal is to identify contamination, adulteration, and quality defects in pharmaceutical products through their packaging at ports of entry and other supply-chain nodes using multi-modal sensing and data fusion. This 54-month program is structured into three 18-month phases, culminating in a fieldable platform with validated training materials and integrated documentation capabilities. This procurement is conducted as a multiple-award Other Transaction (OT) Agreement rather than a standard federal contract, meaning it is governed by specific OT articles instead of the Federal Acquisition Regulation. Awards are based on the most advantageous proposals, with primary evaluation factors including innovation, soundness, execution planning, risk management, and team expertise. Payments are fixed and triggered by the successful completion of milestones, managed through the Payment Management System. Proposers must be registered in SAM.gov and provide detailed technical and cost proposals, including a milestone payment schedule and research security disclosures. Amendment 01 specifically updated the cost proposal narrative model and workbook to correct typographical errors and rename appendices.
Advanced Research Projects Agency For Health (arpa-H)

POSTED

about 15 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541715
New
Federal
HYDROSPHERE, BIOSPHERE, & GEOPHYSICS (HBG) SUPPORT SERVICES II - FINAL REQUEST FOR PROPOSAL (FRFP)
Solicitation # 80GSFC27R0015
The National Aeronautics and Space Administration Goddard Space Flight Center is soliciting proposals for the Hydrosphere, Biosphere, and Geophysics (HBG) Support Services II contract, under solicitation number 80GSFC27R0015. This small business set-aside is a hybrid Indefinite Delivery Indefinite Quantity (IDIQ) contract with a five-year effective ordering period. The contract allows for the issuance of both Cost Plus Fixed Fee (CPFF) and Firm-Fixed Price (FFP) task orders to support science research and computing activities across various laboratories, including the Cryospheric Sciences, Ocean Ecology, Hydrological Sciences, Biospheric Sciences, Geodesy and Geophysics, and the Terrestrial Information Systems Laboratory. The primary objective is to develop and apply space, field-deployed, and laboratory-based technologies to address societal issues related to water resources, ecosystems, sea level change, and the Earth's magnetic and gravity fields. The scope of work encompasses scientific modeling, simulation, data assimilation, satellite instrument performance analysis, and the planning and execution of field campaigns. Performance will occur at the Goddard Space Flight Center and the contractor's facilities, with acceptance managed by the Contracting Officer or a designated representative. Award selection will be based on a tradeoff approach, prioritizing Mission Suitability as the most important factor, followed by Cost and Past Performance. Proposals must be submitted in four volumes, including a numerically scored Mission Suitability volume and a detailed Cost volume. Additionally, the contractor must adhere to strict security requirements, including the provision of a Cyber Supply Chain Risk Management plan and compliance with NDAA Section 889 regarding telecommunications and surveillance equipment.
NASA Goddard Space Flight Center

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541715
New
Federal
Engineering Support for the Asymmetric Systems
Solicitation # N0017827R3106
Solicitation N0017827R3106 is a sources-sought effort for the Naval Surface Warfare Center Dahlgren Division to obtain comprehensive technical and engineering support for the Asymmetric Systems Division (H10). The anticipated contract will be a Cost-Plus-Fixed-Fee, Level of Effort Task Order with a five-year period of performance, consisting of a twelve-month base period and four twelve-month option periods. The primary objective is to provide qualified personnel to integrate advanced automation and asymmetric machine learning architectures into naval weapon systems across the entire acquisition lifecycle, from initial material solution analysis through testing and safe fielding. Work will be performed primarily at the Dahlgren, Virginia facility and at the contractor's own facilities. The scope of work is broad, encompassing multi-disciplinary engineering in domains such as software, mechanical, cyber, robotics, and RF micro-electronic design. Key deliverables include the development of data-driven validation frameworks, high-computing cloud services, and the implementation of Open Architecture standards. The contractor must adhere to strict security and quality requirements, including DFARS 252.204-7012 for system security plans and FAR 52.219-14 regarding subcontracting limitations. Award will be based on best value, evaluating technical capabilities, personnel qualifications and security clearances, and past performance as a prime contractor within the last five years. Invoicing will be managed through the Wide Area Workflow module on the Procurement Integrated Enterprise Environment system.
Nswc Dahlgren

POSTED

about 15 hours ago

DEADLINE

in 7 days
View Details

More opportunities from National Aeronautics and Space Administration → NASA SBIR/STTR Program

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS