Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on November 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Schnepf Road Waterline Construction Phases 2A and 3B

Closed
IFB 26-012State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 13 days

General Info

Documents

12
PDF, High priority: read this first11 pages · wage-determination
High
PDF, High priority: read this first13 pages · special-specifications
High
PDF, High priority: read this first16 pages · contract-document
High
PDF, High priority: read this first46 pages · geotechnical-report
High
PDF, High priority: read this first1 page · bid-response-authorization
High
PDF, High priority: read this first26 pages · ifb
High
PDF, High priority: read this first1 page · bid-bond
High
PDF, High priority: read this first14 pages · special-provisions
High
PDF, Low priority17 pages · other
Low
PDF, Low priority23 pages · other
Low
PDF, Low priorityother
Low
PDF, Low priority1 page · resolution
Low

Read all 12 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 15 days
  • Lift Station No. 85 ReplacementOpen now, due in 26 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jan 27, 2026 to Jan 8, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → CIP
Contacts2 people available
OfficeQueen Creek, AZ, 85142, USA

Interested Companies (67)

Achen Gardner ConstructionChandler, AZ
Ames ConstructionScottsdale, Arizona

See All 67 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Town of Queen Creek is soliciting bids from qualified contractors for the installation of a 16-inch C909 PVC waterline and dual 3-inch Schedule 90 PVC conduits in a joint trench. The work is located within the San Tan Valley area of Pinal County and includes two distinct project segments: • Phase 2A (Project WA265): Home Place to the Main Plant • Phase 3B (Project WA264): South of Pima Road to Germann Road

More opportunities from Arizona → CIP

Same awarding agency

NAICS: 237110
SLED
Design/Build - Industrial Wastewater Treatment Facility
Solicitation # 27-011
The Town of Queen Creek, Arizona, is soliciting a Design-Build Team for the development of a new industrial and municipal wastewater treatment facility. The project aims to reduce reliance on groundwater and potable water by recycling wastewater, with an initial focus on the first phase: the Industrial Advanced Treatment Facility (IATF). This first phase is specifically dedicated to treating 1.25 mgd of industrial wastewater from the LG Energy Solution (LGES) manufacturing facility. Long-term goals include expanding the facility to a total capacity of 21 mgd, consisting of 15 mgd for industrial sources, 5 mgd for municipal sources, and 1 mgd of flex capacity. The facility is expected to be located within three miles of the LGES site, with a target for full operation by January 1, 2032. The procurement process requires a Statement of Qualifications (SOQ) submitted by December 8, 2026, evaluated based on project approach, relevant experience, and team structure. The selected Design-Build Team will be responsible for all design, permitting, construction, startup, and commissioning services under a Guaranteed Maximum Price (GMP) contract. Financial estimates for the project vary by phase, with the first phase budget attributed at 92 million dollars and total potential construction costs reaching approximately 710 million dollars. Mandatory requirements include a non-collusion affidavit, certification regarding debarment, and comprehensive insurance coverage, including professional liability and commercial general liability. Payment will be based on the actual cost of work minus a 10 percent retainage for construction work.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 20 days
View Details
NAICS: 541330
SLED
On-Call Professional Services - Transportation and General Civil Design Services
Solicitation # RFQ 27-012
The Town of Queen Creek is seeking statements of qualifications from engineering firms to provide on-call transportation and general civil engineering design services. The Town may award up to four contracts, each featuring an initial three-year term with the option to renew for two additional one-year terms based on performance and need. These services are intended for small to medium-sized projects with limited scopes and short deadlines, specifically focusing on the preparation of construction documents, improvement plans, drainage reports, and cost estimates for roadways, sidewalks, trails, and multi-use paths. Selected firms must adhere to Arizona Revised Statute Title 34, Maricopa Association of Governments standards, and Town of Queen Creek standards. The selection process involves scoring statements of qualifications to create a shortlist of three to five respondents, followed by stand-alone interviews to determine the final ranking. Mandatory compliance requires respondents to demonstrate financial stability and provide certifications regarding debarment and suspension per FAR 52.209-5. Awarded consultants must maintain a comprehensive risk control and safety program and provide insurance naming the Town of Queen Creek as an additional insured. Contract administration is managed by the Town Manager, with payments processed via monthly progress reports and detailed invoices. All responses must be submitted as an editable PDF through the Town's e-Procurement portal by the December 3, 2026, deadline.
Engineering Services

POSTED

13 days ago

DEADLINE

in 15 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS