Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from South Carolina was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sculpture Installation and Site Preparation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 5 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract entails the on-site installation of completed stone sculptures in public spaces, requiring comprehensive site preparation including foundation construction, proper anchoring to ensure structural stability, precise leveling for aesthetic and safety standards, and full restoration of the surrounding environment to its original or approved condition. All work must be performed in accordance with industry best practices and local regulations to maintain public safety and aesthetic integrity in designated areas. The contract is classified as a subcontract under NAICS code 238990 for other specialty trade contractors and was posted on May 7, 2026, with a response deadline of May 22, 2026. It is managed by the South Carolina Economic & Urban Development agency, with performance expected in unspecified public locations within the state. Bidders must be prepared to handle logistical coordination, heavy equipment operation, and compliance with environmental and safety standards, with no set-aside provisions indicated. Interested parties can access additional details through the provided procurement portal link.

General Info

On-site installation of stone sculptures, foundation, anchoring, leveling, and site restoration in South Carolina.

Documents

This scope was carved out of 2107-RFQ.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

On-Call Stone Sculpture Art Commissions

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 9 days
  • EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySouth Carolina → Economic & Urban Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
On-site installation of completed stone sculptures including foundation work, anchoring, leveling, and site restoration in public spaces.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS