Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SD FLAP SDGFP PARKING(1) North Point Parking Lot

Closed
6982AF26B000005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 12 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 17 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The contract pertains to the reconstruction of a 98,000 square-foot parking lot at the North Point Recreation Area near Pickstown, South Dakota, servicing the boat ramp adjacent to the Fort Randall Dam on the Missouri River. The work involves full removal and subexcavation of the existing asphalt and base to a depth of 9.5 inches, replacement with six inches of aggregate base, and installation of a three-and-a-half-inch asphalt concrete pavement. The project includes subgrade soil removal, adjustments to ensure ADA-compliant handicap parking, installation of a concrete dumpster pad, and full signing and striping of the lot. Construction will necessitate a full closure of the parking area during execution. Key measurable work items include 5,700 cubic yards of roadway excavation, 3,000 cubic yards of subexcavation, 3,800 tons of roadway aggregate, and 2,300 tons of asphalt concrete pavement. The estimated contract value ranges from $2,175,000 to $2,346,000, inclusive of an executable option for additional work. Performance is governed by a hierarchy of standards including the Federal Acquisition Regulation, Texas Administrative Rules, Standard Contract Requirements, project plans, and industry specifications from ASTM, AASHTO, and MUTCD. Quality control is enforced through statistical pay factors derived from material testing, with incentives for performance above minimum thresholds, indicating a trade-off selection basis rather than low-price technically acceptable. The contract is issued by the Federal Highway Administration’s Central Federal Lands Highway Division out of Lakewood, Colorado, under solicitation number 6982AF26B000005 with a response deadline of May 19, 2026. Electronic proposal submissions are mandatory via email in native file formats, and mailed paper copies are restricted to only specific documentation like weight records and batch tickets. No set-aside provisions apply, and small business utilization is included as a standard clause. Contract administration is governed by FAR clauses addressing government property, inspection of construction, termination for convenience, default, prompt payment, labor standards, and change orders, with deviations applied to several clauses as of late 2025 and early 2026. All materials must comply with strict packaging, preservation, and labeling requirements, and inspections occur at multiple stages including origin, in-transit, and in-place, with final acceptance determined solely by government verification testing. No specific period of performance

General Info

Reconstruction of 98,000 sq ft parking lot with new pavement, ADA compliance, and signage.

Agency

Department Of Transportation → 6982AF Central Federal Lands DivisiView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Pickstown, SD, 57367, USA

Set-Aside

NONE

Documents

(12)

Amendment A001 to Solicitation 6982AF26B000005 for SD FLAP SDGFP Parking

PDFamendment

6982AF26B000005-+IFB+SD+FLAP+SDGFP+Parking%281%29+North+Point+Parking+Lot.pdf

PDF

North Point Boat Ramp Parking Lot Floodplain Development Memo

PDFother

Design+Physical+Data+and+Reports.zip

ZIP

Bid+Opening+Summary-+SD+FLAP+SDGFP+Parking+%281%29+North+Point+Parking+Lot.pdf

PDF

Pavement Design Report SD FLAP SDGFP North Point Parking Lot

PDFpavement-design-report

QnA for SD FLAP SDGFP Parking North Point Parking April 28, 2026

PDFq-and-a

SD FLAP SDGFP Parking Plans - North Point Parking Lot

PDFspecifications

QnA for SD FLAP SDGFP Parking North Point Parking

PDFq-and-a

Final.BidTabulationReport.pdf

PDF

QnA for SD FLAP SDGFP North Point Parking Project

PDFq-and-a

FP-24 Standard Specifications for Construction of Roads and Bridges

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Response Deadline

Deadline has passed

Amendment 6

Contract was updated

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
View Agency Profile
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Stephanie Navarro
Ryan Phillips

Full Description

Show more

PROJECT DESCRIPTION: 


The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area.



SCOPE OF THE WORK: 


The project will consist of removal of excavating the existing parking lot’s asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities.


PRINCIPAL WORK ITEMS:


  • 20401-0000 Roadway Excavation: 5,700 CUYD
  • 20402-0000 Subexcavation: 3,000 CUYD
  • 30202-2000 Roadway Aggregate, Method 2: 3,800 TON
  • 40301-0000 Asphalt Concrete Pavement, 2,300 TON

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
New
Federal
NV BL SONV 500(3) Red Rock Trail
Solicitation # 6982AF26SS00007
The Red Rock Trail project in Las Vegas, Nevada, is currently in the sources-sought phase to determine if there is sufficient interest from qualified small business prime contractors to justify a set-aside. Located within the environmentally sensitive Red Rock Conservation Area, the scope of work involves constructing approximately seven miles of paved multi-use trail, widening State Highway 159 for additional turn lanes, and reconstructing the Moenkopi and Blue Diamond Mesa parking areas. Key technical requirements include 35,000 cubic yards of embankment construction, 30,000 tons of roadway aggregate, 12,000 tons of asphalt concrete pavement, 200 linear feet of precast reinforced concrete box culverts, and 2,500 square feet of MSE wall. Interested prime contractors must be certified in the System for Award Management and submit their response to Douglas Whitcomb by September 23, 2026, at 2 p.m. local Denver time. Submissions must include a statement of intent to bid, confirmed socioeconomic categories, a bonding agent letter verifying a single project capacity of 30 million dollars, and a list of previous road construction projects of similar value and scope. Specifically, applicants must demonstrate experience in multi-use trail construction, highway widening, parking area reconstruction, and grade-separated under-crossings within environmentally sensitive areas.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS