Septic System Design and Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract for the Confederated Tribes of the Colville Reservation involves the design and installation of wastewater systems for residential projects in Nespelem. The selected contractor will be responsible for performing soils evaluations and percolation tests, designing septic systems, and installing all necessary tanks, distribution components, drainfields, and reserve-area protection. To qualify, the contractor must hold a septic installer certification and obtain all required jurisdictional design approvals. The final deliverable consists of a fully inspected septic system accompanied by comprehensive as-built records. Responses for this opportunity are due by October 30, 2026.
General Info
Place of Performance
Nespelem, WA, 99155Set-Aside
Documents
This scope was carved out of RFP-Template_format_fixed_CCT_Sturgeon-Residence-10-1-2026-xbmk.pdf.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
F&W, Residential House, Resident Fish Hatchery - Sturgeon
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Confederated Tribes of the Colville Reservation
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
