Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Septic to Sewer Conversion Franklin & Hood

Closed
Bid #6036State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for ground maintenance services at its campus in Greenville, Kentucky. The scope of work involves the comprehensive maintenance of approximately 50 acres and 35 or more buildings, including mowing turf to a height of 3 to 4 inches, string trimming, edging, and general cleanup. The contract is structured for an initial one-year term with the option for four additional one-year renewals, contingent upon funding and satisfactory performance. This is a subcontracting opportunity under U.S. Department of Labor Contract 1605JE22C0007 and is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to the responsible offeror who is deemed technically acceptable and provides the lowest price. Technical acceptability requires the submission of a detailed technical and price proposal, company qualifications, three references, an equipment list, proof of insurance, a safety program, and evidence of registration and licensing in the State of Kentucky. Offerors must also be verified through the SAM portal. The contract mandates strict adherence to the Federal Acquisition Regulation, OSHA and EPA standards, and the Davis-Bacon Act, specifically Wage Determination Number KY20210041. Contractors must submit weekly certified payroll and a signed Statement of Compliance with every invoice to receive payment. All rejected work must be corrected within 48 hours at no additional cost to the government. Quotes are due by October 30, 2026, at 5:00 pm.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 5 hours ago

DEADLINE

in 1 day
NAICS: 561730
New
SLED
IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing
Solicitation # RFP-Lot-Cleanup-CCT-IT-10_15.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for comprehensive cleanup, vegetation control, debris removal, and metal product decommissioning services for five designated lots located in Nespelem and Omak, Washington. The selected contractor will be responsible for providing all labor, equipment, and transportation to perform grass cutting, vegetation trimming, and the removal of loose garbage and abandoned materials. Additionally, the scope includes the decommissioning and removal of authorized products, equipment, and fixtures, with a strict requirement to notify the owner of any hazardous or contaminated materials discovered. The objective is to restore all properties to a clean, orderly, and safe condition, concluding with a final site inspection. Proposals are due by November 5, 2026, and will be evaluated based on a 100-point scale considering reliability, budget, and TERO scoring, which provides a preference for Indian-owned businesses. Specifically, a responsible Indian Offeror may be awarded the contract if their price is within 10 percent of the lowest non-Indian bid. The contract term is for an as-needed period not to exceed three years, subject to yearly tribal appropriations. Key requirements for the contractor include maintaining appropriate insurance, providing resumes for key personnel, and adhering to a 25 percent retainage or a performance bond for contracts exceeding 100,000 dollars.
Confederated Tribes of the Colville Reservation

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 561730
New
SLED
Sod & Services
Solicitation # 26-8696
Solicitation 26-8696 is an invitation for licensed contractors to provide the supply, delivery, and installation of premium sand-grown sod varieties, including Bahia, Bermudagrass, and St. Augustine, for Collier County, Florida. The contract is intended for a three-year term with two one-year renewal options. Services are divided into several categories based on fulfillment method, including County pickup, delivery and off-loading, and full-service installation. Additional available services include hydroseeding for slopes and embankments, as well as ground preparation and grading. Awards will be granted to the lowest responsive and responsible bidder per category. Contractors are held to strict quality and safety standards, requiring sod to be installed within 24 hours of harvesting and ensuring all joints are butt tight. For work performed within County roadways, contractors must implement approved Maintenance of Traffic plans and coordinate utilities via Sunshine 811. Mandatory submission requirements include a bid bond equal to 5 percent of the cost proposal, E-Verify enrollment, and various certifications regarding conflicts of interest and vendor declarations. For projects exceeding 200,000 dollars, performance and payment bonds for 100 percent of the contract amount are required. Bids must be submitted electronically via the OpenGov portal by November 9, 2026.
Procurement

POSTED

about 14 hours ago

DEADLINE

in 12 days
NAICS: 561730
New
SLED
Contract No. HCSNO28SBR Snow and Ice Removal
Solicitation # BPM059512
Solicitation BPM059512 is a fixed-price contract for snow and ice removal services at the Maryland State Highway Administration Hanover Complex located at 7491 Connelley Drive, Hanover, Maryland. The contractor is responsible for providing all labor, equipment, and expertise to clear roadways, parking lots, and sidewalks, ensuring operational readiness throughout each snow event and adhering to standards set by agencies such as OSHA, EPA, and NFPA. The contract duration is two years, with estimated service requirements including 35 hours for a skid loader and operator, 40 hours for a 2.5-ton 4x4 dump truck and operator, and 140 hours of additional labor. Award will be granted to the responsive and responsible vendor offering the lowest total bid price. Qualified bidders must have five years of commercial snow and ice removal experience and provide three references from the past two years. Mandatory submission documents include a current Maryland Business License, a W9, a Bid Price Form, a Conflict of Interest Affidavit, and a Mercury Affidavit. All bids must be submitted via the eMaryland Marketplace Advantage portal by November 4, 2026. The successful contractor must maintain significant insurance coverages, including 1 million dollars per occurrence for Commercial General Liability and Employee Theft insurance, and agree to electronic funds transfer for payments.
State Highway Administration

POSTED

about 16 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract involves a comprehensive sewer infrastructure upgrade in the Franklin and Hood areas of Sacramento County, California, replacing septic systems with a new sewer system. The project encompasses the installation of approximately 38,818 linear feet of both public and private sanitary sewer force mains, utilizing HDPE pipes of various diameters, along with the construction of 8-inch VCP sewer lines and six polymer concrete manholes. Key features include multiple crossings of waterways, freeways, and railroads through horizontal directional drilling and jack-and-bore methods, ensuring minimal surface disruption. Additionally, around 99 low-pressure sewer pump stations will be installed on private property, complete with alarm systems, house connections, and electrical hookups, with existing septic systems being decommissioned. The scope of work also covers surface restoration, pavement repair, landscaping, site dewatering, excavation support, traffic and erosion control, pipe verification, and permit compliance, ensuring a fully functional and compliant sewer system upon completion. The project is scheduled for substantial completion by November 18, 2025, with an estimated construction cost of approximately $22.5 million. The contract requires a Class A General Engineering license for bidding, and a mandatory pre-bid conference is part of the process. The work aims to improve sanitation infrastructure, reduce environmental impact, and enhance community health and safety in the targeted areas.

General Info

Agency

California → SacSewer

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → SacSewer
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → SacSewer
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work to be performed under this contract includes the furnishing of all labor, materials, tools and equipment for the Septic to Sewer Conversion Franklin & Hood (Project) located in the Franklin and Hood areas of Sacramento County, CA (location map shown in Drawings). The Project includes construction of the following items: Construct approximately 38,818 linear feet of public and private sanitary sewer force main (which includes 9,860 linear feet of 1.25-inch through 4-inch HDPE pipe for the Franklin community and 28,958 linear feet of 1.25-inch through 6-inch HDPE pipe for the Hood community), complete, with cleanouts, valves, and incidentals. Provide one (1) crossing of waterway by horizontal directional drilling (HDD) for the Franklin community and two (2) crossings of waterways by HDD for the Hood community. Provide one (1) freeway crossing inside casing installed by HDD for the Hood community. Provide one (1) railroad crossing inside steel casing installed by jack-and-bore (which is applicable to both the Franklin and Hood communities). Construct approximately 1,299 linear feet of 8-inch VCP sanitary sewer with six (6) polymer concrete sanitary sewer manholes (which is applicable to both the Franklin and Hood communities). Construct approximately 99 low pressure sewer (LPS) pump stations (which includes 31 LPS for the Franklin community and 68 LPS for the Hood community) on private property complete with alarm panels and connection to house plumbing and existing electrical power supply, and with abandonment of existing septic systems. Pavement restoration, restoration of landscaping and other surface improvements, mobilization, material acquisition and storage, permits, coordination, and other incidentals needed for a complete project. All Work associated with this contract must include, but is not limited to, mobilization/demobilization, dewatering of excavations, sheeting, shoring, and bracing of excavation, traffic control, erosion and sediment control, cleaning, debris removal and disposal, verification of pipe lengths and diameters, installation of PVC and VCP by open cut, installation of HDPE by open cut and horizontal directional drilling, installation of casing by boring and jacking, permitting, site restoration, and additional items or details that are required by the Contract Documents to be performed, placed, constructed or installed. Additional items or details not mentioned above but required by these specifications and drawings must be performed, placed, constructed, or installed in accordance with the Contract Documents. All work shall be completed as outlined in provided permit requirements. The successful bidder will achieve substantial completion of the Work by November 18, 2025. CONTRACTOR LICENSE REQUIRED: Class A – General Engineering ESTIMATED CONSTRUCTION COST: $ 22,500,000 Note: there is a mandatory pre-bid conference meeting.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS