This Government Contract opportunity from Massachusetts was posted on October 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Server Room Electrical Circuitry and Receptacles

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
26-140 Installation of Emergency Shut Off Switches
Solicitation # 26-140
Solicitation 26-140 is a subcontracting opportunity with Atterbury Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor, to install emergency shut-off switches on power tools in Indiana. The scope of work specifically requires the installation of two mushroom-head push-button emergency shut-off switches and a new 60A, 208/120V, 3-phase, 4-wire, 6-circuit branch circuit panel with a 60A shunt-trip main circuit breaker in the Facility Maintenance Shop. All work must comply with OSHA, EPA, and FNC guidelines, as well as state and local building codes, with Indiana regulations taking precedence if they are more stringent. The procurement is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Interested offerors must attend a mandatory site visit on November 10, 2026, and submit a typed proposal on company letterhead by November 20, 2026. Bids must be submitted as a single lump sum with a detailed cost breakdown and a 90-day bid guarantee. Award will be based on best value, evaluated across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Contractors must hold a valid State of Indiana Contractor's License and provide proof of automobile liability, general liability, and workers compensation insurance. Performance requirements include providing a sequenced construction schedule within 10 days of the Notice to Proceed and a one-year guarantee of workmanship. Payment is issued on Net 30 terms upon submission of certified payroll records, a completed SF 1413, and subcontractor releases of claims. Final acceptance is contingent upon a successful walk-through and the provision of all required training and maintenance manuals.
Atterbury Job Corps. – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformer assets. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections of energized transformers under load, installing standardized external oil sampling devices to improve technician safety, and performing comprehensive oil testing analysis. Additionally, the selected contractor will evaluate existing nitrogen blanket systems to ensure positive pressure and prevent oil oxidation, provide on-site training for up to 20 agency staff members, and develop standard operating procedures for the new sampling devices. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award based on the offeror's past performance, staffing plan, personnel availability, cost-effectiveness, and any exceptions taken to the contract terms. Qualified bidders must have completed at least two similar projects within the last five years, including at least one for a utility or industrial facility. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and various required forms such as a non-collusion statement and workers compensation certificate. The resulting contract will utilize fixed pricing with a not-to-exceed total value, and payments will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 2 hours ago

DEADLINE

in about 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves inspecting, testing, repairing, and certifying emergency lighting systems to ensure compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. Key deliverables include a full inventory of fixtures, functional testing via simulated power outages, the application of durable tracking labels to each fixture, integration of maintenance schedules into the facility's Computerized Maintenance Management System, and the provision of disposal certificates for hazardous materials. The estimated contract value ranges between $25,000 and $100,000, with a required performance period of 30 business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be submitted to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, contractors must provide a bid bond guarantee equal to 20% of the base bid, as well as performance and payment bonds upon award. The selection will be based on overall best value. Qualified bidders must submit a detailed cost breakout on company letterhead, proof of insurance, and a completed MTC Supplier Packet including a W-9 and self-certification of business status. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. The contract is subject to the Davis-Bacon Act, FAR 52.222-4 safety standards, and federal prevailing wage requirements for building construction in Idaho.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 27 days
NAICS: 238210
New
SLED
Installation of EV Chargers for the Electric Bucket Truck
Solicitation # CS 11-26-01
Alameda Municipal Power (AMP) is soliciting bids for the installation of two electric vehicle chargers at its service center, warehouse, and parking area in Alameda, California, to support a 2022 International eMV607 SBA electric bucket truck. The project requires a qualified C-10 Electrical Contractor to install one level-2 and one level-3 charger (InCharge ICE-30 and ICE-80), which will be supplied by AMP. The scope of work includes installing a 100 Amp 3-pole 480-volt circuit breaker in the electrical room, a 50 Amp 250-volt breaker in the warehouse panel, approximately 220 feet of EMT conduit, and a 60-amperage 600-volt safety switch. The contractor is also responsible for the mounting equipment and coordinating the programming and activation of the chargers with the software provider, In Charge. The contract will be awarded as a total lump sum to the lowest responsive and responsible bidder, with a preference given to local businesses in the City of Alameda. Bidders must demonstrate the capacity to complete the work within 90 calendar days from the Notice to Proceed, with an anticipated start date around December 14, 2026. Key requirements include adherence to prevailing wage laws, registration with the Department of Industrial Relations, and the provision of bid, performance, and payment bonds for projects exceeding 25,000 dollars. Bids must be submitted electronically via the OpenGov Procurement portal by November 19, 2026, and must include a Statement of Qualifications, Non-Collusion Declaration, and a signed W-9. Payment will be processed every 30 days at 90 percent of the approved amounts, with the final balance paid upon successful final inspection and recording of the Notice of Completion.
Support Services

POSTED

about 4 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This subcontract for the Executive Office of Energy and Environmental Affairs involves the installation of server room electrical circuitry and receptacles at the MEP Westborough HQ. The scope of work requires the installation of 20-amperage, 120-volt branch circuits extending from existing panels to attic spaces and dedicated HVAC circuits, including the provision of one 20-amp quad receptacle. The contractor is responsible for ensuring all work meets NEC and local codes through rigorous testing for voltage, polarity, and grounding. All delivered electrical circuits and receptacles must be fully verified. The response deadline for this project is November 3, 2026.

General Info

Install server room electrical circuitry and receptacles at MEP Westborough HQ by November 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Executive Office of Energy and Environmental Affairs
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical wiring and installation of dedicated circuits for prime contractors on EOEEA facility projects at the MEP Westborough HQ. Installs 20-amperage, 120-volt branch circuits from existing panels to attic space and dedicated HVAC circuits, including one 20-amp quad receptacle. Performs testing for voltage, polarity, and grounding per NEC and local codes. Delivers verified electrical circuits and receptacles.

More opportunities from Massachusetts → Executive Office of Energy and Environmental Affairs

Same awarding agency

NAICS: 925120
New
SLED
Municipal Vulnerability Preparedness (MVP) Planning 2.0 FY27
Solicitation # BD-27-1042-ENV-ENV01-134963
The Municipal Vulnerability Preparedness (MVP) Planning 2.0 FY27 is a grant program issued by the Massachusetts Executive Office of Energy and Environmental Affairs to support eligible municipalities and Tribes in building climate resilience. This two-year initiative focuses on a 10-step process centered on equity, social vulnerability, and the implementation of a Seed Project. Key deliverables include convening community teams for equitable resilience work, providing training on climate justice, conducting social vulnerability assessments, and co-developing a community resilience project. The program aims to increase the capacity of participants to secure future MVP Action Grants or other implementation funding. Funding is structured in two installments per community, with an anticipated 50,000 dollars for Steps 1-8 and 10, and another 50,000 dollars for Step 9, though regional projects may receive slightly more for the first installment. The Executive Office of Energy and Environmental Affairs expects to award funding to every community listed in the solicitation's required application list, while other eligible entities are evaluated based on their commitment, capacity, and the presence of burdened populations. Priority is given to entities that did not participate in MVP Planning 1.0. Applications must be submitted electronically via the EEA Grants Management System by December 11, 2026. Required documentation for a complete contract includes the Commonwealth Standard Contract Form, Commonwealth Terms and Conditions, a Contractor Authorized Signatory Listing Form, and an Electronic Funds Transfer set-up form. Tribal applicants must provide additional documentation of their status and presence within Massachusetts. All submissions are subject to the Massachusetts Public Records Law, and the contract includes provisions for suspension or termination should available funding cease.
Administration of Urban Planning and Community and Rural Development

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 924120
SLED
Landscape Partnership Grant FY27 RFR
Solicitation # BD-27-1042-ENV-ENV01-134823
The FY 2027 Landscape Partnership Grant Program, administered by the Massachusetts Executive Office of Energy and Environmental Affairs, provides funding to collaborations of two or more municipal, state, federal, or non-profit entities. The program supports the acquisition of property interests in large, unfragmented conservation and working landscapes, including undeveloped lands, farms, forests, water supply lands, and rare species habitats. The primary goal is to enhance large-scale connectivity to sustain ecosystem integrity and the viability of local farm and forest economies. Eligible projects can receive a maximum reimbursement of 50% of the total project cost, up to a limit of 1,250,000 dollars. Applications must be submitted via the EEA Grant Management System by March 11, 2027. A complete submission requires an itemized budget, appraisal reports no more than one year old, a letter from the Massachusetts Historical Commission, and documentation of stewardship capacity. Evaluation is based on local involvement, stewardship capacity, and project quality relative to program priorities. Awardees must execute their contracts within 90 days of the public announcement and ensure all project costs are expended by the end of the applicable fiscal year, ranging from June 30, 2027, to June 30, 2029. Key compliance requirements include the removal of all structures unless they support conservation or passive recreation, and municipal grantees must certify compliance with the MBTA Communities Act. Parcels cannot be located within designated Priority Development Areas. Awarded projects are subject to the Standard Commonwealth of Massachusetts Terms and Conditions and must provide a Baseline Documentation Report or Stewardship Plan. Invoicing is handled electronically through the Contract Manager and the EEA Finance department.
Administration of Conservation Programs

POSTED

9 days ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS