Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sewer Main Replacement Program

Closed
20260813017State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the installation of approximately 1,450 square feet of permeable pavement and eight vegetated stormwater management cells to treat roughly 1.7 acres of impervious surface within a 3.3-acre drainage area. The project requires comprehensive drainage, underdrain, inlet, pipe, and downspout work, along with limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements include the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This solicitation specifically encourages participation from small business concerns, including minority, woman-owned, disadvantaged, HUBZone, and veteran-owned businesses, who may also form consortiums to handle larger bid items. Bids are due by 4:00 P.M. on September 17, 2026. Interested parties must submit a response indicating their intent to bid to the primary contact, Jonah Leith. The project falls under NAICS code 237110, focusing on professional civil engineering construction.
Harbel, Inc.

POSTED

about 8 hours ago

DEADLINE

in 5 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 8 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The City of Arcadia is soliciting bids for the Sewer Main Replacement Program, specifically for project number 33861626. The scope of work involves replacing existing 8-inch and 10-inch sewer pipes with larger 12-inch HDPE pipes on Santa Anita Avenue, between Christina Street and a manhole north of El Dorado Street. This project will utilize pipe bursting technology and requires the contractor to reconnect all active sewer laterals, bypass sewer mains, and repair any manhole walls damaged during the bursting process. The selected contractor will be responsible for the full project lifecycle, including mobilization, traffic control plan implementation, and the restoration of the road surface and striping. Compliance with safety and environmental regulations, such as SWPPP, is mandatory. Responses to solicitation number 20260813017 must be submitted by September 1, 2026.

General Info

City of Arcadia seeks bids for sewer pipe replacement on Santa Anita Avenue.

Agency

California → City of ArcadiaView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Arcadia, CA, 91006, USA

Set-Aside

NONE

Documents

(1)

City of Arcadia Sewer Main Replacement Program Project No. 33861626 - Notice Inviting Bids

PDFrfb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Arcadia
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Arcadia
View Agency Profile
Office AddressN/A

Full Description

Show more
Bid #33861626: The project involves replacing the existing 8-10-inch sewer pipe on Santa Anita Avenue between Christina Street and a manhole approximately 150 feet north of El Dorado Street with a larger 12-inch HDPE pipe. The replacement will be performed using pipe bursting technology, and all active sewer laterals will be reconnected to the new pipe. The scope also includes the restoration of the existing road surface and striping after the pipe replacement. Key tasks include mobilization, diversion of recyclable waste, traffic control plan design and implementation, locating and reconnecting sewer laterals, repairing manhole walls affected by pipe bursting, pipe bursting operations for both 8-inch and 10-inch pipes to 12-inch HDPE, bypassing sewer mains, street repair, and reinstalling striping. The contractor is responsible for ensuring proper lateral connections, preventing damage to utilities, and complying with all safety and environmental regulations, including SWPPP and traffic control requirements.

More opportunities from California → City of Arcadia

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS