Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Sewer Pipeline Installation (Gravity & Force Main)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract is for the installation of sanitary sewer pipelines encompassing all phases of construction, including trenching, bedding, jointing, backfilling, and testing for both gravity-fed and pressurized force main systems. The work requires adherence to engineering specifications for both types of systems, ensuring proper alignment, structural integrity, and hydraulic performance. All materials and methods must meet industry standards for durability and long-term functionality in municipal sewer infrastructure. This is a subcontract opportunity posted by MPTAP under the Mississippi agency, with a North American Industry Classification System code of 237110 for sewer and wastewater facilities construction. The solicitation was posted on July 16, 2026, and responses are due by July 31, 2026. The place of performance details are not specified, but the scope suggests work within Mississippi. Interested parties must submit proposals through the designated state portal by the deadline, and the contract will be awarded to a qualified subcontractor capable of executing the full scope of pipeline installation and testing with appropriate equipment, labor, and compliance protocols.

General Info

Install sanitary sewer pipelines including gravity and force main systems in Mississippi by July 31, 2026.

Agency

Mississippi → MPTAPView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

MS, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMississippi → MPTAP
ContactsNo contacts available
OfficeN/A
Organization / Agency
Mississippi → MPTAP
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of sanitary sewer pipelines including trenching, bedding, jointing, backfilling, and testing for both gravity and pressurized force main systems.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting a contract to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology. This project follows the Design-Bid-Build procurement model, indicating that design will be completed prior to competitive bidding, and the selected contractor will be responsible for construction based on finalized plans. The work involves rehabilitation of the aging water main to ensure continued service reliability and compliance with infrastructure standards, leveraging CIPP methods to minimize disruption and avoid full excavation. The project is classified under NAICS code 237110, which corresponds to water and sewer line and related structures construction, signaling its focus on critical utility infrastructure. Primary point of contact for the solicitation is Moraa Omwega, reachable via phone or email, with Ray Moreno serving as the Project Manager. The contract is currently in the forecast stage, meaning it has not yet been formally solicited but is anticipated for future release, with the posting date indicating the information was made available in July 2026. All work is expected to occur at the specified location along the Airport Expressway, though exact city and state details are not provided in the data. Stakeholders are encouraged to monitor the official portal link for the official solicitation notice, which will include detailed requirements, timelines, and bid submission guidelines.
Aviation Project Management Group

POSTED

about 1 hour ago

DEADLINE

N/A
View Details
NAICS: 237110
New
Federal
Repair Water Tower B738Funds are not currently available for the Repair Water Tower B738 project at Goodfellow Air Force Base in San Angelo, Texas, and no award will be made until funding is secured; the government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for incurred costs. This is a combined synopsis and solicitation issued as a Request for Quotation under FAR Part 12, targeting small businesses as a total small business set-aside, with a NAICS code of 237110 and a size standard of $45 million. The scope includes comprehensive repair and repainting of a 400,000-gallon elevated steel water tank, involving full surface preparation, removal of existing coatings, application of potable-water-compliant protective coatings, metal fabrication repairs to replace the overflow stub pipe and internal ladder, installation of a new riser access manway and safety grating, and compliance with NFPA and OSHA standards, all to be completed within 120 days of the Notice to Proceed. The estimated value ranges between $500,000 and $1,000,000. Offers must be submitted by 2:00 PM CST on Thursday, August 24, 2026, to designated points of contact and must include a completed pricing schedule, a cover letter with company details and CAGE code, and technical documentation not exceeding twenty pages addressing evaluation criteria. Base Access Letters must be submitted by July 27, 2026, and a mandatory site visit is scheduled for July 30, 2026. Questions must be submitted by August 6, 2026. Inspection and acceptance will occur on-site after project completion, with designated personnel responsible for verification. The government anticipates prompt definitization of any change orders, with a target of 60 days for final pricing negotiation if an undefinitized change order is issued, and all costs will be determined in accordance with applicable federal regulations.
FA3030 17 Cons Cc

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Mississippi → MPTAP

Same awarding agency