Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Mission Springs Water District involves the installation of a large-scale sewer collection system in Desert Hot Springs, California. The scope of work requires the installation of 146,200 linear feet of 8-inch sewer pipeline, encompassing all necessary trenching, pipe laying, bedding, backfilling, and compaction. The contractor is responsible for providing all essential equipment, including trenching tools, shoring, and compaction machinery, to deliver a fully installed and tested sewer main. All operations must strictly adhere to local water district standards and California environmental mitigation requirements. The project falls under NAICS code 237110 and is designed to support prime contractors on critical infrastructure improvements within the region.

General Info

Subcontract for installing 146,200 linear feet of sewer pipeline in Desert Hot Springs.

Agency

California → Mission Springs Water District

Place of Performance

Desert Hot Springs, CA, 92240

Set-Aside

NONE

Documents

This scope was carved out of MS-306.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Mission Springs Water District Groundwater Quality Protection Program Septic to Sewer Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mission Springs Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Mission Springs Water District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs a large-scale sewer collection system for prime contractors on Mission Springs Water District infrastructure projects in Desert Hot Springs, CA. Performs trenching, pipe laying, bedding, backfilling, and compaction for 146,200 linear feet of 8-inch sewer pipeline. Utilizes trenching equipment, shoring, and compaction tools. Must comply with California environmental mitigation and local water district standards. Delivers 146,200 LF of installed and tested sewer main.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of mechanical and electrical systems such as pumps, a generator, and odor control equipment, along with new gravity sewers, manholes, stormwater facilities, and site grading. The project has an estimated value of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and MWBE compliance. Bidders must provide a signed bid form, bid bond, and evidence of authority to do business in the state. The agreement is based on a stipulated price and follows EJCDC standard general and supplementary conditions. Performance and payment bonds, as well as proof of insurance, are required upon contract execution. Payment is processed monthly via applications for payment submitted to the engineer, with payments becoming due 30 days after presentation to the owner. Work must adhere to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for electric motors.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS