Sewer System Rehabilitation & Inspection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 53061.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Ash-Woods Area Infrastructure Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works-Engineering
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs sewer pipe installation and CCTV diagnostic inspections for prime contractors on City infrastructure projects. Installs socket and spigot sewer pipes with waterproof elastomeric gasket joints. Conducts CCTV camera inspections, maps lateral connections, and measures manhole depths to identify structural defects and sags per Standard Specifications 207-8, 208, and 306. Delivers installed sewer lines and CCTV inspection reports.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this opportunity is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 18 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing water mains. The work is located on Walnut Street, Ebony Lane, and 247th Place in California. W.A. Rasic Construction Company, Inc. is acting as the prime contractor and is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for subcontractor quotations is October 19, 2026, at 1:00 PM. This is an SBA set-aside opportunity encouraging participation from DBE, MBE, WBE, and SBE firms. Qualified subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All selected subcontractors must execute the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company, Inc.
W.A. Rasic Construction Company

POSTED

about 18 hours ago

DEADLINE

in 13 days
View Details

More opportunities from California → Public Works-Engineering

Same awarding agency

NAICS: 237110
New
SLED
Ash-Woods Area Infrastructure Improvements
Solicitation # 53061
The City of Fullerton, through its Public Works-Engineering department, is soliciting sealed proposals for the Ash-Woods Area Infrastructure Improvements project, solicitation number 53061. This public works construction project has an engineer's estimate of 2,680,000 dollars and involves a comprehensive scope of civil engineering activities, including pipeline system rehabilitation, street lighting and traffic signal systems, landscaping and irrigation, and asphalt concrete recycling. Work must be performed in accordance with the 2024 Greenbook, 2018 Caltrans Standard Specifications, and City of Fullerton Standard Drawings. The contract will be awarded to the lowest responsible bidder, with proposals due via the OpenGov Procurement Portal by 1:00 pm on October 26, 2026. Performance begins upon receipt of a written Notice to Proceed, with work hours restricted to 7:00 a.m. to 4:00 p.m. and prohibited during City holiday closures. The contractor is required to provide a detailed phasing schedule and maintain record drawings on-site, delivering as-constructed plans prior to progress payments. Key administrative requirements include the provision of bid, performance, and payment bonds, as well as general liability insurance with a minimum limit of 1,000,000 dollars per occurrence. Contractors must adhere to California prevailing wage rates and ensure the removal of all construction markings within five calendar days of project conclusion to avoid a 250 dollar daily fine. Final acceptance is contingent upon a successful final inspection and the completion of all punch list items within ten working days.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 21 days
View Details
NAICS: 237110
SLED
STORM DRAIN LINING FISCAL YEAR 2026-27
Solicitation # 52027
The City of Fullerton is soliciting sealed proposals for Project No. 52027, Storm Drain Lining for Fiscal Year 2026-27. The project involves the rehabilitation of existing storm drain pipes using cured-in-place-pipe liners, with a scope of work that includes cleaning and preparation, pre- and post-construction video inspections, storm drain inlet replacement, and necessary traffic control. The engineer's estimate for the project is 358,000 dollars. Bids must be submitted through the OpenGov Procurement Portal by 1:00 pm on October 7, 2026. The contract will be awarded to the lowest responsible bidder who possesses a Class A license at the time of submission. The successful contractor must execute the agreement and provide all required insurance and statutory bonds, including a 10 percent bid bond and subsequent performance and payment bonds, within 21 calendar days of the award. Work must be completed within 21 working days from the notice to proceed, with an additional 10 working days allowed to resolve punch list items. Compliance requirements include adherence to the California Labor Code regarding prevailing wages, DIR registration, and various federal certifications such as the Copeland Anti-Kickback Act and Equal Employment Opportunity standards. Payment is processed monthly via invoices on company letterhead, typically within 30 days of approval by the Engineer.
Water and Sewer Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS