Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of The Interior was posted on July 24, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SFO-EAST MAGDALENA THIN 2023

Closed
140L2223Q0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 18 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months

General Info

NAICS

115310 - Support Activities for Forestry

Place of Performance

NM

Set-Aside

ISBEE

Documents

5

East Magdalena Thin 2023 Statement of Work

DOC, High priority: read this firstsow
High

Solicitation 140L2223Q0007 - East Magdalena Thin 2023

PDF, High priority: read this firstrfq
High

East Magdalena Thin 2023 - Lower Chavez Unit Map

PDF, Low priorityspecifications
Low

East Magdalena Thin 2023 - Red Canyon Map

PDF, Low priorityspecifications
Low

69-0115.txt

TXT

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Farmington District Office
Contacts1 person available
OfficeFARMINGTON, NM, 87401, USA
Office AddressFARMINGTON, NM, 87401, USA
Contacts

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. The Bureau of Land Management (BLM) Socorro Field Office has a requirement through the New Mexico State Office for the East Magdalena Thinning Project, 2023. Solicitation number 140L2223Q0007 is issued as a Request for Quote (RFQ). The solicitation documents and incorporated provisions and clauses are in effect through Federal Acquisition Circular (FAC) 2023-02. The North America Industry Classification System (NAICS) code is 115310 and the Small Business Standard size is $11.5. Product Service Code F003 - Natural Resources/Conservation-Forest Range Fire. This procurement is set aside 100% for Indian Small Business Economic Enterprises (ISBEE) in accordance with the Buy Indian Act Regulations Location of Project The project area is located on Bureau of Land Management (BLM) administered lands about 15 miles north-northwest of Socorro in Socorro County, New Mexico in parts of Sections 17, 19, 20, 24, 25, 29, and 30 of Township 4 South, Range 2 West (Red Canyon Unit) and Sections 7, 8, 17, 18, and 19 of Township 4 South, Range 1 West (Black Canyon Unit) and Sections 3-5, 9, and 10 of the Lower Chavez Unit. Project area is a variable mix of closed to moderate woodland on very steep to moderately steep on relatively rugged desert mountainous terrain to moderately steep terrain on rolling hills. Boundaries of Project Area Boundaries will be natural barriers, such as ridge tops and canyon bottoms. Boundaries will be explained on the ground and flagged if need be. The area to be thinned will be between 40-60% of the total acreage within the Red Canyon Unit and Black Canyon Unit (see maps) until contracted acres are thinned and between 17-25% of the Lower Chavez Unit. Preference will be to treat acres within the Red Canyon Unit first. The number of acres thinned will be dependent upon funding availability and cost per acre. If identified acreage is completed within the preference and/or identified sections, project will then move into the Black Canyon Unit, to thin remaining acreage. Access Red Canyon Unit: 1. From Socorro travel south on NM Highway 1 approximately 6.3 miles to County Road 126. Then travel west on County Road 126 approximately 4.8 miles until BLM two-track road heading west. Then travel south on two-track road approximately 0.75 miles to project area. 2. From Socorro travel west on NM Highway 60 approximately 7.5 miles to Box Canyon Road. Then travel south on Box Canyon approximately 5.5 miles to Mierra Well. Then travel east on two-track road approximately 1.5 miles. Lower Chavez Unit: From Socorro travel west on Highway 60 approximately 7 miles to the Box Canyon turn off. Then take County Road south approximately 8.7 miles to USFS access road. Access into the project area is by two track roads. Vehicle access is provided by a two track roads on the east and west of the project area(s). Foot access may be up to - mile from existing roads. All vehicles shall remain on existing roads. No Off-Highway Vehicle (OHV) use is authorized nor permitted as part of the project. No vehicle access will be allowed off existing travel routes. It is recommended that crews provide 4x4 vehicles and/or UTV's or ATV's to access project areas. Lower Chavez Unit: Project Purpose The purpose of this contract is to provide services for improvement of forest/woodland health and wildlife habitat improvement. Slash would be left on site and possibly burned at a later date when dry by Socorro Field Office fire personnel. Requesting Office: Socorro Field Office ------------------------------------------------------------------------------------------------------------ Sub Description/Project Est. Unit Item Area Name/Location Qty. Unit 0010 Red Canyon Unit 175.5 Acres AU 0020 Lower Chavez Thin 2023 88 Acres AU Project Prescriptions for: Prescriptions apply to entire project area. The Contractor shall cut one-seed juniper trees and mountain mahogany as specified in the prescriptions described below. Treatment will be done by hand-cutting (chainsaws and other hand equipment). Retain all pinon pine trees as leave trees. The Contractor shall cut live mature trees, saplings, and seedlings inside the identified one half to 100 acre polygons/patch boundaries, except for designated leave trees and groups. Due to the nature of the treatment the cut areas will be identified on the ground by the authorized officer. Leave tree preference - 1st Healthy tree, 2nd Larger tree, 3rd Pi'on Pine (Pinus edulis). When thinning, all unhealthy (i.e. mistletoe infested, diseased, dying, etc.) trees should be removed first regardless of size; then look at spacing and species requirements. No Girdling or Pruning. Cut any live tree 6 inches tall or above that do not meet the criteria below for leave trees. Cut smaller seedlings and saplings growing under larger leave trees. Cut trees shall be completely severed from the stump, with stump height 3 inches or less in height, measured on the high side of the tree. No live limbs will be left on the stump of cut trees. All cut areas shall be GPSed and all shape files provided to the BLM. Pi'on-juniper Prescriptions: Within meadow edges, slopes/hillsides, and canyon bottoms, pi'on and juniper trees up to 12-16 inches Diameter at Root Crown (DRC) and smaller would be removed. Larger diameter healthy trees (12-16 inches DRC or larger) of Pi'on and juniper would be retained as leave trees. Max DRC (12-16 DRC) will be dependent on site characteristic of each site/stand and can be modified as needed to maintain a sufficient amount of leave trees. Due to stem characteristics of Juniper and Pi'on, stem diameter will be measured 6 inches above ground surface on the high side for cutting (DSH-diameter at stump height), not DBH. Leaving 1-2 small groups of healthy trees per acre (approximately 6-10 trees per group) is acceptable, with an average spacing around groups of 100-300 feet. Within meadow edges, slopes/hillsides, and canyon bottoms, irregular shaped (chevron or diamond patterns) one-half to five acre strips or patches would be cut, interspersed with uncut areas. Uncut patches shall be left with spacing between patches of 50-300 feet, where conditions allow. Spacing between cut patches would not exceed 300 feet. Cut areas within canyon bottoms and swales would extend two chains or 132 feet upslope from streambed/canyon bottom. Thinning prescriptions and cut areas can be modified on site by authorized officer depending on site characteristics and to meet resource objectives. Mountain Mahogany Management Prescriptions: a. Select mahogany stands would be cut at a height specified below to rejuvenate and promote resprouting of browse. b. A mix of cut heights (1. At knee height 2. At waist height) shall be completed in each identified stand. Cut patches shall be spaced, according to the above specified prescriptions and according to verbal specifications provided by the authorized officer. The authorized officer will meet with the crew supervisor 2-3 times per week while work is in progress to determine status and to ensure work is completed to contract specifications. Leave trees: Retained trees should be free of diseases (conks, fungus, dwarf mistletoe, etc.), and of good form (no forks in lower portion of pi'on or ponderosa pine). All hardwood species and snags. Any tree having signs or survey marks. All trees along fence lines that have fence wire attached to them. Trees with cultural significance or obvious wildlife occupation, i.e. cavities or bird nests. Any tree or group of trees in a leave patch marked with flagging or identified by the authorized officer representative and according to the specified prescriptions. NOTE: All leave trees are not marked. It is the contractor's responsibility to identify the trees mentioned above. Special Treatment Requirements Slash Management: Trees felled into drainage bottoms shall be felled with the top of the tree pointed downstream and the end of the trunk of the tree pointed upstream. No trees shall be cut within 20 feet of a drainage cut or slope which shows significant signs of erosion. The Contractor shall cut, lop and scatter slash to within 2 feet of the ground ensuring that slash within the polygon or patch is continuous and connected. Cut and felled material shall be bucked into lengths of 4-6 feet to speed drying. Slash would be pulled away a minimum of 15 feet from leave trees (large diameter trees or snags, or any other sensitive resource as appropriate. Felled trees and slash will not be left within 30 feet of any fence, improvement, or access road edge. Standing trees (to be felled) within 30 feet of any fence or road will be felled so they lie on the side of the stump opposite to the road or fence. Period of Performance begins May 15, 2023 to September 14, 2023 There are two separate units within this contract. Site Visit: Approximately April 18th, 2023; meet at the Socorro Field office at 9 a.m. for a briefing, then travel to the site for the field visit. Information (maps and directions) will be available through the Socorro Field Office, 901 S. Highway 85, Socorro, New Mexico at +1 (555) 000-0000. The work site is approximately a 30-45 minute drive from Socorro. Offerors intending to attend the site visit tour shall contact Carlos Madril at +1 (555) 000-0000 (email: contact@example.gov) at least 2 working days before the scheduled site visit and advise him of the firm's name and number of persons that will attend. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. The provision at 52.212-1, Instructions to Offerors -- Commercial, applies to this acquisition. The provision at 52.212-2, Evaluation -- Commercial Items applies (LPTA) completed copy of the provision at 52.212-3, Offeror Representations and Certifications -- Commercial Items, with its offer. The clause at 52.212-4, Contract Terms and Conditions -- Commercial Items, applies to this acquisition along with the clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders -- Commercial Items, applies to this acquisition. Additional billing clauses and contract clauses are included in the document 140L2223Q0007. Solicitation is due April 28, 2023 1700 MT. Sent your response via email to contact@example.gov. Offerors must be registered at http://www.sam.gov to be eligible for award of a contract.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS