Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on July 20, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

F--CROW MESA WILDLIFE & RANGELAND IMPROVEMENT

Awarded
140L3723Q0099Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
SLED
San Poil Forest, Louie Creek
Solicitation # LoisCreen2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for an excavator piling and scarification project totaling 90.8 acres within the Louie Creek logging area on the Colville Indian Reservation. The scope of work includes piling logging slash and debris, removing brush and standing dead trees, and removing non-merchantable trees exhibiting dwarf mistletoe. Contractors must utilize equipment with low ground pressure of less than 8.5 p.s.i. and are required to construct water bars on slopes to prevent water channeling. Performance will be monitored by a designated Contract Officer’s Representative from San Poil Forestry, who will conduct inspections in each unit to ensure quality and progress. Bids must be submitted in a sealed envelope to the San Poil Forestry locked box at the Mt. Tolman Fire Center by November 5, 2026, at 4:00 PM. Mandatory submission requirements include a bid on every inspection item, a bid evaluation form, a contracting and subcontracting plan, and proof of SAM.gov registration. Evaluation factors include technical qualifications, reasonable pricing, and a strong emphasis on Indian preference in the award of contracts and subcontracts. Contractors must provide liability insurance and are encouraged to obtain a Trader License and TERO Tile ID certification to avoid specific fees. All work must comply with the Tribal Occupational Safety and Health Administration standards and applicable federal and state laws.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 6 days
NAICS: 115310
New
SLED
San Poil Forest, 3 commercial thinning contracts
Solicitation # thinningcontract2026.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry and the Tribal Employment Rights Office, is soliciting bids for three commercial pre-commercial thinning contracts located in the 30 Mile Logging area of the Colville Indian Reservation. The scope of work involves thinning operations across three specific units: SP-06-PCT-27 (39.7 acres), SP-07-PCT-27 (33.0 acres), and SP-08-PCT-27 (37.0 acres). Key technical requirements include the felling of overtopped or suppressed trees, the removal of all mistletoe-infected trees, and specific slash management to create a uniform fuel bed. Quality standards mandate that stumps be cut below five inches and that brush or hardwoods interfering with leave trees be cleared within a four-foot radius. Bids must be submitted in a sealed envelope labeled 30 Mile PCT 2027 and deposited in the San Poil Forestry Drop-Off Box at the Mt. Tolman Complex by 4:00 PM on November 2, 2026. The award process emphasizes Indian Preference and requires bidders to provide a bid per acre and a total bid price. Essential submission documents include a work plan, bid sheet, debarment certification, TERO compliance forms, and proof of liability insurance. Contractors must also obtain a BIA Trader License and adhere to TOSHA safety standards. Payment terms include a 20 percent withholding until final approval, with partial payments authorized for units exceeding 10 acres. Final acceptance is contingent upon a final inspection by the Contracting Officer's Representative and the complete removal of all debris from the units.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 3 days
NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning (PCT) contracts in the McAllister Creek area on the Colville Indian Reservation. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the selection and retention of the most vigorous trees, strict slash management including clearing roadways and streams, and the removal of all foreign debris. Contractors must adhere to specific technical standards, such as maximum stump heights of one-half the stump diameter and a maximum slash height of 24 inches, with financial penalties of 3 dollars per tree for damage to leave trees. Bids must be physically submitted to the mailbox at the Mt Tolman Complex by 4:00 PM on November 17, 2026, as electronic submissions are prohibited. A complete bid packet must include a bid sheet, bid evaluation form, a detailed work plan, TERO compliance and utilization forms, and a signed debarment certification. Award decisions are based on the contractor being responsive and responsible, though the lowest bid is not guaranteed to be accepted. Payment is issued per completed and accepted acre, with 20 percent of each payment withheld until final acceptance. Contractors are required to provide liability insurance and comply with TERO Title X and TOSHA safety regulations.
Confederated Tribes of the Colville Reservation

POSTED

about 20 hours ago

DEADLINE

in 18 days
NAICS: 115310
New
Grant
Landscape Scale Restoration Grant Program for Tribes
Solicitation # USDA-FS-2026-LSR-TRIBAL
The Landscape Scale Restoration Grant Program for Tribes, solicitation USDA-FS-2026-LSR-TRIBAL, is a competitive funding opportunity administered by the USDA Forest Service. The program supports collaborative, science-based forest restoration projects on rural non-industrial private forest land, rural state or local government forest land, and Indian trust or fee lands. Projects must align with a science-based restoration strategy, such as a Tribal Forest Plan, and focus on reducing wildfire risk, improving fish and wildlife habitats, maintaining water quality, or mitigating invasive plants, insects, and disease. Total program funding is 1.26 million dollars, with individual awards ranging from 100,000 to 300,000 dollars. A mandatory 1:1 non-Federal cost-share match is required for all grant recipients. Applications must be submitted via email to [email hidden] by January 26, 2027. Required documentation includes a project narrative limited to five pages, a detailed budget spreadsheet, and a valid Unique Entity Identifier from SAM.gov. Projects involving equipment purchases must submit form FS 1500-34, and all applicants must undergo a risk assessment and submit a financial capability questionnaire prior to award. The evaluation process is based on a 100-point scale focusing on deliverables, goals, strategy integration, and sustainability. Awarded projects must be completed within three years, with possible extensions up to five years. Performance is measured by quantitative outcomes in hazardous fuels management, invasive plant treatment, or insect and disease management.
Forest Service

POSTED

1 day ago

DEADLINE

in 3 months

General Info

Contract Value

$120,217

NAICS

115310 - Support Activities for Forestry

Place of Performance

ID

Set-Aside

NONE

Award Issued Date

Documents

1

Crow_Mesa_Thinning_Contract_Combined_Synopsis.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Interagency Fire Center
Contacts1 person available
OfficeBOISE, ID, 83705, USA
Office AddressBOISE, ID, 83705, USA

Full Description

Show more
CROW MESSA WILDLIFE AND RANGELAND IMPROVEMENT THINNING PROJECT, BUREAU OF LAND MANAGEMENT, FARMINGTON FIELD OFFICE, NEW MEXICO This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement and attachments constitute the only solicitation; quotes are being requested and a written solicitation will not be issued. Consider this solicitation (140L3723Q0099) as a Request for Quotes (RFQ). This solicitation documents incorporate provisions and clauses in effect through Federal acquisition Circular 2019-03. This solicitation is set-aside for small business. NAICS 115310 - Support Activities for Forestry - Fuels Management Services. The small business size standard is $34.0 million. Product Service Code F014 - Natural Resources / Conservation - Tree Thinning. The resulting purchase order will be a firm-fixed price type contract. (SEE ATTACHMENTS FOR COMPLETE STATEMENT OF WORK, MAPS, WAGE DETERMINATIONS, AND CLAUSES / PROVISIONS.) 503 acres x $______________ = $___________________ In accordance with the procedures in FAR Part 12 and 13, RFQ 140L3723Q0099 is available for viewing through electronic commerce via Land Management's website at https://beta.sam.gov. The Government will award a purchase order resulting from this solicitation to the responsible offeror whose offer is conforming to the solicitation and is the lowest price technically acceptable. Quotes are due Friday, July 14, 2023, by 4:00 p.m. Mountain Time. Contractors submit quotes by email to contact@example.gov. Note: Any contractor to submit an acceptable quote or be awarded a government contract must be registered and active in the System for Award Management (SAM). Contractors must register at www.sam.gov. Contractor's must submit their Unique Entity ID (UEI) and CAGE code with their quote. UEI ______________________ CAGE ____________________ For further information about this requirement, offerors should contact Audrey Whetham at contact@example.gov. The provisions and clauses attached apply to this solicitation. CROW MESA WILDLIFE AND RANGELAND IMPROVEMENT THINNING PROJECT STATEMENT OF WORK A. INTRODUCTION The Bureau of Land Management's mission is to sustain the health, diversity, and productivity of public lands for the use and enjoyment of present and future generations. BLM manages public lands to maximize opportunities for commercial, recreational, and conservation activities. This promotes healthy and productive public lands that create jobs in local communities while supporting traditional land uses such as responsible energy development, timber harvesting, grazing, and recreation, including hunting and fishing. A.1 BLM MISSION PRIORITIES 1. Clean Energy: We will help lead the way to a clean energy future, leaving no communities behind. 2. Restoration: Nature is our planet's best engineer. As the effects of climate change increase, we will restore our lands and waters to create healthy, resilient landscapes and to allow nature to better store carbon. 3. Recreation for All: We will work to ensure that all families now and into the future have equal opportunity to hunt, camp, fish, hike and play on our public lands. 4. Conservation: As part of our multiple use and sustained yield mandate, we will address climate change and conservation in all we do. 5. Rebuild the Agency: To achieve the above and create an agency the future is relying upon; we will fix staffing shortages and build a team that represents all of America. B. BACKGROUND Pinyon-juniper woodlands provide thermal and escape cover for big game, as well as some forage resources. Vegetation types typically found in pinyon-juniper woodlands provide important, nutrient rich browse for wintering big game species. Over the past 150 years, fire suppression and historic overgrazing have likely contributed to an expansion of pinyon and juniper trees over much of the Farmington Field Office. As pinyon-juniper woodlands expand, infill and age, they can reduce production of understory vegetation by depriving those species of direct sunlight and competing with them for nutrients and moisture. Gradual replacement of superior browse forager with pinyon-juniper forest reduces habitat carrying capacities for many species. Still, pinyon and juniper forest does provide important cover for wintering wildlife, as well as essential nesting and foraging substrate for a variety of bird species. Existing vegetation consists primarily of persistent pinyon/juniper woodland with low density intermixed shrub and grass components. C. OBJECTIVE Clearing and thinning of pinyon-juniper forest shall be conducted in patches, to preserve intact forests and protect obligate wildlife species. In proximity to roads and other developments, forested buffers (screens) shall be retained to reduce visual exposure to wildlife. PROJECT SIZE The project shall consist of one option with 503 acres to quote on. The BLM will choose one proposal that is most advantageous to the agency and maximizes the full extent of the requirement as outlined per Section C, Project Size in the Statement of Work (SOW). Vendors are encouraged to offer up their best overall pricing. Requesting Office: Farmington Field Office Description/Project Area Name/Location Est. Qty. Unit Crow Mesa Thinning 503 Acres C.1 TASKS/TECHNICAL REQUIREMENTS The following tasks for which the contractor shall use in the treatment of the Crow Mesa Wildlife and Rangeland Improvement Thinning Project (see attached maps): Thinning An on-site meeting with the Farmington Field Office (FFO) archeologist and on- site contractor personnel shall be held prior to the implementation of any thinning treatments. Treatment shall be done by hand-cutting (chainsaws and other hand equipment). Thinning shall reduce stand density to a range of 30 - 50 stems/acre of juniper and pi'on pine species. Tree species removed shall include Juniper and Pi'on Pine. Preference for leave trees shall be given first to the healthiest pi'on pine trees with the lowest level of defect under 15" diameter at stump height (DSH). Cut all juniper trees under 15 diameter at stump height (DSH). No pi'on pine or juniper trees with a diameter at root collar (DRC) greater than 15 inches, shall be removed. Due to stem characteristics of Juniper and Pi'on, stem diameter shall be measured 6 inches above ground surface on the high side for cutting (DSH-diameter at stump height), not DBH. All standing dead trees (snags) under 15" diameter at stump height (DSH) shall be cut, lop and scattered. All dead and down woody material shall be limbed and the heavy fuels (greater than 3 inches in diameter) shall be bucked up to a maximum of 6-foot sections. Cut stumps shall be three (3) inches or less in height with no live limbs or foliage attached. Cut and felled material shall be bucked up to a maximum of 6-foot sections. Slash from cutting operations shall be lop and scattered. Scattered material shall be focused in areas prone to erosion (drainages, washes, gullies etc.) to prevent future erosion. Limb tops of mountain mahogany, oak brush, and serviceberry bushes to approximately waist height to promote growth regeneration. The contractor shall not cut culturally altered juniper and pi'on pine trees as per the district archeologist guidelines. (Reference Archeological Sites Section in this SOW) Shall not delimb live branches on left trees. Slash Management Slash within the cutting area shall be lopped and scattered through-out the area and shall not exceed 18 inches in height. Cut material that is less than 15 inches in diameter shall be placed in arroyos and erosion "cuts" located within 1 chain (66 feet) of cut trees to help slow head cutting and soil erosion. Any tree that is cut within 66 feet of an active erosion cut, arroyo or area of bare ground shall have the slash placed in areas, in a manner that shall allow the slash to catch sediment and help reduce soil erosion. Leave Trees (No Cut Trees)- The contractor shall at no time cut trees for the following: Any tree having signs or survey markers. Any tree having wildlife nests or cavities. All trees along fence lines that have fence wire attached to them. All Alligator Juniper Seeding Areas to be treated shall be seeded prior to thinning, following the guidelines listed below. Seed supply shall be provided by the FFO-BLM. Seed supply is stored at the Farmington District Office. Contractor shall mix seed to comply with desired seed species ratio. Contractor shall disperse seed within treatment areas PRIOR to thinning activities at a rate of 10lbs of mixed seed per acre. No application of seed shall be applied if there is persistent snow on the ground. Approval for seed application shall be done through coordination with the delegated BLM COR if snow conditions exist. D. DELIVERABLES Requirements: Due On Site meeting with Farmington Field Office Archaeologist and Contractor. Determined by Contracting Officer Representative (COR) and Contracting Officer (CO) after award. Acreage Final Approval As determined by the Farmington Field Office and in consultation with the COR and CO Onsite meeting before any Thinning is to begin Determined by COR in consultation with the Farmington Field Archaeologist E. SUPPORTING DOCUMENTATION E.1 PLACE OF PEROFRMANCE The project lies approximately 8 miles northeast of Nageezi, NM. All project boundaries reside within BLM lands. Grid Coordinates are as follows: Township 27 N, Range 7 W, Sections 4, 5, 6, 7, 8 and 9. The Contractor shall NOT block roadways. The Contracting Office shall at any time place certain work restrictions as necessary to the project, for the safety of general public. Any use of All Terrain Vehicles (including four-wheelers, Mules, Gators, etc.) must be approved in advance by delegated COR and in conjunction with the CO. Before any equipment is brought into the public land project area it shall be washed to remove non-native seeds or any other foreign object debris. Cleaning shall consist of the removal all dirt, grease, debris, and materials that shall harbor noxious weeds and their seeds. Cleaning shall occur away from the project site. Equipment includes Trucks, UTVs, Trailers and Hand-tools. E.2 PERIOD OF PERFORMANCE Estimated start date is August 1, 2023, with performance time of completion due by November 30, 2024, (note work restrictions dates). WORK RESTRICTIONS UNDER PERIOD OF PERFORMANCE The Contractor shall abide by the following Work Restrictions: MIGRATORY BIRD: May 15th - July 31st (No prescribed treatment activity is allowed during this period, unless cleared by a BLM biologist prior to treatment. Do not assume that BLM biologist shall be available to clear treatment areas during this time. If BLM biologist is available, the maximum cleared acres by BLM biologist per day shall be 10 acres. Clearances are valid for 10 calendar days.) BIG GAME WINTER RANGE: December 1st - February 28th. (No prescribed treatment activity is allowed during this period, unless approved by Farmington Field Manager in coordination with the COR and/or CO.) E.3 SPECIAL CONSIDERATIONS MAPS BLM Maps shall show thinning boundaries, treatment acreage, and areas within the project boundary excluded from treatment. Geo-referenced PDF Avenza Maps of treatment polygons shall be made available by the Farmington Field Office Fire and Fuels program. PROJECT SITE ACCESS The contractor shall use existing roads and/or access routes that have been previously approved for vehicle use by the BLM. All access into the project shall be by existing roads or by foot. No vehicle access shall be allowed off established two track roads and must be approved for use prior to project implementation. Closest amenities (fuel; food; lodging) are approximately 53 miles (approx. 46 miles on pavement) from the southern portion of the project area. Road Conditions may become difficult in wet conditions. Tire chains are recommended (not provided by BLM). BOUNDARIES OF PROJECT AREA Project area boundaries shall be provided as geo-referenced PDF maps for use in Avenza Maps. Contractor may flag project area boundaries as needed (flagging not provided by BLM). MIGRATORY BIRDS Nesting Migratory Breeding Season begins on May 15th and ends on July 31st. No prescribed treatment activity shall be allowed during this period, unless cleared by a BLM biologist prior to treatment and in coordination with the Contracting Officer Representative (COR) and Contracting Officer (CO). Do not assume that BLM biologist shall be available to clear treatment areas during this time. If BLM biologist is available, the maximum cleared acres by BLM biologist per day shall be 10 acres. Clearances are valid for 10 calendar days. If contract personnel encounter any bird nests within the acres to be thinned, they shall not cut the tree in which the nest is located or otherwise physically disturb the nest. BIG GAME WINTER RANGE Big game wintering range season begins December 1st and ends on February 28th. No prescribed treatment activity is allowed during this period, unless approved by Farmington Field Manager in coordination with the COR and/or CO. ARCHAEOLOGICAL SITES This project may pose adverse effects to unknown cultural resources within the boundaries of the area. An on-site meeting with the Farmington Field Office (FFO) archeologist and on-site contractor personnel shall be performed prior to the implementation of any thinning treatments. Follow guidance from the Farmington Field Office Archeologist to avoid adverse effects to cultural resources. Notify the COR of any unidentified cultural sites discovered during the implementation of the project. SAFETY AND EQUIPMENT Contract personnel shall follow and meet all federal, state, and local safety standards and requirements for this project. REMOVAL OF FOREST PRODUCTS FROM AREA Removal of any forest product from the project site is not authorized. TRASH Thinning contractor shall be responsible for removal of all trash from the project site daily through the duration of the project. E.4 GOVERNMENT FUNSIHED EQUIPMENT: The government shall furnish all seed(s) required for the tasks associated with this SOW. E.5 CONTRACTOR FURNISHED EQUIPMENT: The contractor shall furnish all equipment and supplies, not furnished by government as listed in the SOW, to complete associated tasks required in this SOW. E.6 INSPECTION AND MEASUREMENT Initial inspections of treated areas shall be done by a delegated BLM COR or the assigned Project Inspector (PI). Final inspections shall include interior and exterior examinations for adherence to prescription. E.7 SITE VISIT is scheduled for Thursday, July 6, 2023, at 9:30 a.m. MST. Meeting Place: Sinclair Gas Station; 11260 Us Hwy 550, Nageezi, NM 87037 Point of Contact: Jake Quintana Telephone: +1 (555) 000-0000 Special Instructions: Optional site visit Wednesday June 28th, 2023; meet at the Sinclair Gas Station; 11260 Us Hwy 550, Nageezi, NM 87037, then travel to the site for the field visit. Information (maps and directions) will be available through the Farmington Field Office, 6251 College Blvd. Suite A Farmington, NM 87042 at +1 (555) 000-0000. The work site is approximately a 0.5 hr. drive from 11260 Us Hwy 550, Nageezi, NM. If you plan on attending the site visit, please contact Jake Quintana via phone (505)-478-1485, or email contact@example.gov 48 hrs. before day of visit to confirm. The roads out there can be slick if they are wet, so we will have to pay close attention to the weather leading up to this date. High clearance vehicle recommended. This visit will be conducted outdoors. This visit will take place in Rio Arriba County. Site visit is subject to cancellation dependent upon weather and road conditions. E.8 LOWEST PRICE TECHNICAL ACCEPTABLE REQUIREMENTS: For the quote to be technically acceptable it must include the following information: Experience: Provide 3 references for projects completed similar in scope and size. (Name of Job, Start and end dates, Location, Description of work performed, Company - Contact Information, Value of the Job) Schedule: Provide a schedule to show how work described in the SOW will be completed within the Period of Performance requirements. Technical: Provide information on how the contractor will approach the project that demonstrates a thorough knowledge and understanding of the requirements in the SOW.

More opportunities from Department Of The Interior → National Interagency Fire Center

Same awarding agency

NAICS: 541370
Federal
Geographic Information Systems (GIS) Mapping and Compliance VerificationThe contract requires the use of ArcGIS and GPS technologies to accurately define, verify, and report on treated land areas, with a focus on pre- and post-seeding boundary mapping, precise area measurement, and comprehensive compliance reporting to support payment verification. All mapping and data collection must be conducted to ensure alignment with established treatment protocols and to provide verifiable evidence of work completed, enabling accurate reimbursement based on geographic and operational metrics. The work involves meticulous spatial documentation to confirm that seeding and treatment activities occur within authorized boundaries and meet regulatory and contractual standards. This subcontract is issued under NAICS code 541370, which pertains to surveying and mapping services, and is managed by the National Interagency Fire Center within the Department of the Interior. The performance location spans areas under federal land management jurisdiction, where precise geospatial data is critical for ecological restoration and fire prevention initiatives. While specific geographic details are not provided, the task demands high accuracy in georeferenced data capture and reporting, with deliverables serving as the basis for financial accountability. The contract is posted as a subcontract opportunity with no set-aside designation, indicating it may be open to a broad range of qualified service providers with expertise in geospatial analysis and field verification.
Surveying and Mapping (except Geophysical) Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 115310
Federal
F--Idaho Falls District Herbicide Application
Solicitation # DOILFBO260021
The Department of the Interior, through the National Interagency Fire Center, is seeking a Total Small Business Set-Aside for a firm-fixed-price contract to perform herbicide application services across 4,106 acres in the Idaho Falls District, targeting invasive species such as Russian thistle and cheatgrass within sagebrush steppe rangelands and roadside fuel breaks. The work will be conducted in three designated treatment units—Curlew, Big Desert, and Wigwam—with additional areas in Oneida County near the Idaho-Utah border, spanning Bingham, Blaine, Power, and Butte Counties. The contractor must provide all labor, equipment, materials, supervision, and incidentals necessary for the application, and all applicators must hold a current Idaho Professional Applicator License in the Agricultural Pesticide Category or be directly supervised by a licensed individual within visual line of sight. The government will supply GIS shapefiles, georeferenced maps, and project boundaries to define operational areas. Performance is contingent on favorable weather and site conditions, with work expected to commence no earlier than September 21, 2026, and must be completed within 12 calendar days of initiation, with all activities finalized no later than November 20, 2026. The procurement will be conducted using simplified acquisition procedures, requiring at least three quotes, and is classified under NAICS Code 115310. The contracting officer is Ian Steinheimer, reachable through the provided contact information, and offerors must obtain the full solicitation directly from him. Specific evaluation factors, inspection criteria, packaging requirements, and submission instructions have not yet been released.
Support Activities for Forestry

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS