Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Shake Shack Drive Through CUP2026-0011

Forecast
CUP2026-0011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Oak Valley Parkway and Interstate 10, Beaumont, CA, 92223

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Beaumont
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → City of Beaumont
Office AddressN/A
Contacts
Regina LamanSenior Project Development Manager
Katie JensonAssistant Planner

Full Description

Show more
Request for a Conditional Use Permit for a restaurant with a drive through lane and pick up window in a 3,377 sq ft unit on ‘Pad A’ within the entitled project of Oak Valley Village shopping center.

More opportunities from California → City of Beaumont

Same awarding agency

NAICS: 237990
SLED
Beaumont Corporate Yard ProjectThe Beaumont Corporate Yard Project involves the development of a 6.15-acre site located at the southwest intersection of 4th Street and Veile Avenue in Beaumont, California. This multi-departmental facility will support Transit, Fleet Maintenance, Community Services, Public Works, and Wastewater operations. The scope of work includes the construction of a 10,100 square foot Administration Building, a 10,575 square foot Fleet Garage, a 12,100 square foot Warehouse, and specialized canopies for welding and wash bays. To support sustainable operations, the site will feature a Hydrogen Fueling Station, a Compressed Natural Gas fueling station, Electric Vehicle charging infrastructure, and up to 200 parking spaces with both uncovered and solar-covered options. The facility is designed to accommodate up to 100 employees with specific operating hours from Monday to Friday. The project is governed by the California Environmental Quality Act (CEQA) and includes a comprehensive Mitigation Monitoring and Reporting Program to manage environmental and cultural impacts. Key requirements include the use of a Qualified Archaeologist and Tribal Monitor during ground-disturbing activities, adherence to nesting bird season restrictions from February 1st to August 31st, and compliance with South Coast Air Quality Management District and Regional Water Quality Control Board standards. Technical assessments have concluded that the project will have less than significant impacts on air quality, global climate change, noise, and vehicle miles traveled. Construction is expected to begin in early 2027 and last approximately 18 months, following the project approval granted on August 14, 2026.
Other Heavy and Civil Engineering Construction

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Beaumont Master Drainage Plan Line 2, Stage 1The Beaumont Master Drainage Plan Line 2, Stage 1 project involves the installation of approximately 5,000 linear feet of 84-inch to 102-inch reinforced concrete pipe (RCP) along 6th St, Pennsylvania Ave, and E 1st St in the City of Beaumont, Riverside County, California. The project aims to manage future drainage flows and reduce flooding risks by installing the RCP at a depth of no more than 25 feet. Key infrastructure components include manholes for maintenance access at intervals of no more than 500 feet, as well as various inlets and outlets. Specific modifications are required at Berkshire Avenue, where outlets will be lowered by 2 feet and exit pipe sizes will increase, necessitating the reconstruction of headwalls and surrounding grading. The project involves the removal of 13,000 cubic yards of material and the backfilling of 5,000 cubic yards, with water being permanently diverted away from eastern channels. To ensure safety and environmental compliance, the project incorporates traffic control measures, including signs, barriers, and flaggers, and employs best management practices such as silt fences and basins for soil erosion control. The project has undergone extensive environmental review under the California Environmental Quality Act (CEQA), resulting in a Negative Declaration. Comprehensive studies have been completed regarding air quality, greenhouse gas emissions, construction noise, and biological resources, including a Determination of Biologically Equivalent or Superior Preservation (DBESP) report. Additionally, paleontological and cultural resource surveys were conducted, with recommendations for archaeological monitoring during construction. The project is coordinated through the City of Beaumont Public Works Department and involves oversight from agencies such as the State Water Resources Control Board and the U.S. Army Corps of Engineers.
Other Heavy and Civil Engineering Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS