Shear Pin Wall Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the West Valley Sanitation District involves the installation of a 130-foot shear pin wall to provide geotechnical stabilization for a failing slope located on the downhill side of an existing sanitary sewer line in Saratoga, California. The project requires the use of specialized drilling equipment for the installation of structural piles and shear pins to ensure the stability of the area. The contractor must adhere to all local regulations, specifically the City of Saratoga Noise Ordinance, throughout the duration of the work. The primary objective of the contract is the delivery of a completed stabilization wall that meets the technical specifications required for the site.

General Info

Subcontract for installing a 130-foot shear pin stabilization wall in Saratoga, California.

Agency

California → West Valley Sanitation District

Place of Performance

Saratoga, CA

Set-Aside

NONE

Documents

This scope was carved out of Congress Hall Sewer Pipe Stabilization Project.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → West Valley Sanitation District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → West Valley Sanitation District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs a shear pin wall for prime contractors on West Valley Sanitation District geotechnical stabilization projects. Installs approximately 130 feet of shear pin wall on the downhill side of an existing sanitary sewer line to stabilize a failing slope. Utilizes drilling equipment for pin installation and structural piles. Must comply with City of Saratoga Noise Ordinance. Delivers a completed 130-foot shear pin wall providing slope stabilization.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 16 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS