Congress Hall Sewer Pipe Stabilization Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The West Valley Sanitation District is undertaking an emergency stabilization project at 21756 Congress Hall Lane in Saratoga, California, to prevent imminent failure of a sanitary sewer line due to active slope movement. The primary solution involves constructing a shear pin and tie beam wall approximately 130 to 200 feet long downslope of the existing sewer, embedded below the active landslide zone, with work restricted to disturbed areas on the roadway and vineyard while preserving all healthy mature trees with a diameter of 12 inches or greater at breast height. The project qualifies as an emergency under CEQA §15269 due to the imminent threat to public health and safety from potential raw sewage release, allowing for a non-competitive, expedited procurement process without a formal solicitation number. Construction is planned for an eight-week period between 8 a.m. and 5 p.m., Monday through Friday, beginning in fall 2025, with all activities strictly complying with the City of Saratoga’s noise ordinance, dust control requirements, and erosion mitigation standards. Contractor responsibilities include installing temporary black geotextile silt fences on both the east and west sides of the work area to prevent debris migration, restoring all disturbed soil with native vegetation upon completion without the use of drip or artificial irrigation, and ensuring all excavations are properly barricaded and covered at the end of each day. Traffic control measures such as signage, barricades, and flagpersons must be implemented per local regulations, and pollution control efforts must be coordinated with other ongoing activities. No formal contract type, pricing, payment details, or federal acquisition regulations such as FAR clauses, packaging standards, or representation certifications are specified, reflecting the municipal emergency nature of the procurement. The West Valley Sanitation District retains full inspection and acceptance authority at the project site, with oversight led by Senior Civil Engineer Alan Kam. The work is governed by state environmental compliance and local ordinances, with no federal military or defense-related standards referenced, and all requirements are focused on rapid, environmentally responsible stabilization to mitigate immediate risk of infrastructure failure.

General Info

Emergency sewer stabilization via shear wall in Saratoga, fall 2025, with environmental and noise compliance, no competitive bidding.

Agency

California → West Valley Sanitation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

21756 Congress Hall Lane, Saratoga, CA

Set-Aside

NONE

Documents

(1)

WVSD Congress Hall Sewer Pipe Stabilization Project Notice of Exemption and Supporting Memo 11-18-2025

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → West Valley Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → West Valley Sanitation District
Office AddressN/A
Contacts
Alan KamSenior Civil Engineer

Full Description

Show more
Stabilization of the ground in the vicinity of an existing sanitary sewer by installation of shear pin wall (approximately 130 feet long) on the downhill side of the existing sewer.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details