Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Well Rehabilitation Project FY 26, Well Nos. 5718-1 and 5725-1

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Coachella Valley Water District's Well Rehabilitation Project FY 26 involves the rehabilitation of two existing domestic wells, numbered 5718-1 and 5725-1, located in La Quinta, California. The primary objective of this project is to bring these wells into compliance with the adopted Hexavalent Chromium (Cr-6) Maximum Contaminant Level of 10 micrograms per liter, as current concentrations exceed this limit. By rehabilitating these existing assets, the district aims to eliminate the necessity of designing and constructing new water treatment plants. The project is anticipated to commence around December 2025 and is expected to last approximately 270 calendar days. The scope of work includes a comprehensive technical process involving equipment mobilization, the removal and inspection of vertical turbine pumps and pump houses, and detailed well diagnostics such as casing inspection logs, video surveys, and caliper logs. Contractors will perform mechanical cleaning of the well casings and screens, conduct 4-hour pumping tests with discrete zone water sampling, and fill the bottom of the wells with clean gravel and bentonite layers at specific depths. The project concludes with disinfection, the installation of permanent pumping equipment, and the re-installation of pump houses. To ensure uninterrupted service to customers, other domestic wells in the pressure zone will be utilized during construction. The project has received a Notice of Exemption under CEQA guidelines, as it involves existing facilities with negligible expansion and is not subject to specific habitat conservation mitigation fees.

General Info

Rehabilitating two La Quinta wells for Cr-6 compliance starting December 2025 for 270 days.

Agency

California → Coachella Valley Water District

Place of Performance

La Quinta, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Coachella Valley Water District
Office AddressN/A
Contacts
Glenn LubbeSupervising Engineer

Full Description

Show more
The Coachella Valley Water District’s (CVWD) Well Rehabilitation Project FY 26, Well Nos. 5718-1 and 5725-1 Project (Project) will rehabilitate two existing domestic wells to comply with the adopted Hexavalent Chromium (Cr-6) Maximum Contaminant Level (MCL). The wells currently exceed the Cr-6 MCL of 10 micrograms per liter (ug/L). Currently, wells 5718-1 and 5725-1 have Cr-6 concentrations of approximately 16 µg/L and 10.7 µg/L, respectively. The rehabilitation of these wells will eliminate the need to design and construct a new treatment plant(s) to comply with the adopted Cr-6 MCL. The rehabilitation and construction of the existing wells will be as follows: 1. Mobilize equipment to the well sites. 2. Remove the vertical turbine pump and associated components. a. Remove pump house. b. Inspect pump, motor, column pipe and line shaft. c. Provide inspection report and recommendation for repair. 3. Perform a Casing Inspection Log (CITM), well video survey, caliper log, and deviation survey. 4. Mechanically brush the inner well casing and screen to remove deposits from the inside walls and screen slots with a wire-line brush tool. 5. Perform well video survey. 6. Install a test pump with access tube for spinner survey and discrete zone water sampling tools (pump bowls set to approximately 350 feet). 7. Perform 4-hour pumping test on the entire well at varying rates. a. Perform spinner survey at each well b. Well 5718- 1: Collect discrete zone samples. Coordinate with CVWD to collect samples for water quality testing. c. Well 5725- 1: Collect discrete zone. Coordinate with CVWD to collect samples for water quality testing 8. Remove test pump equipment from well. 9. Fill bottom of well with clean gravel. a. Well 5718-1: Fill bottom of well with clean gravel to an estimated 1,250 feet below ground surface using tremie pipe and 5 ppm chlorine solution. Install a 10 foot thick bentonite layer from 1,250 feet to 1,240 feet below ground surface. b. Well 5725-1: Fill bottom of well with clean gravel to an estimated 1,220 feet below ground surface using tremie pipe and 5 ppm chlorine solution. Install a 10 foot thick bentonite layer from 1,220 feet to 1,210 feet below ground surface. 10. Reinstall test pump equipment 11. Perform 4-hour pumping test on the entire well at varying rates. a. Coordinate with CVWD to collect discharge water samples for water quality testing. 12. Perform water level recovery test. 13. Remove test pump and temporary discharge assembly. 14. Perform post-rehabilitation well video survey. 15. Select and place orders for permanent pumping equipment. 16. Disinfect the well and install permanent pumping equipment. 17. Re-install pump house, demobilize, and clean up the well site. The rehabilitation of the existing wells is anticipated to begin in or around December 2025 and last approximately 270 calendar days. The surrounding land uses consist of residential, open space, and roadways. Other domestic water wells in the pressure zone will be utilized during Project construction to avoid disruption of service to customers. The Project is not located within or adjacent to a conservation area associated with the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP). The sites are not subject to the CVMSHCP development mitigation fee because they are previously developed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
22275 RB - Hague NE Bulkhead Rehabilitation
Solicitation # 22275 RB
The City of Norfolk, Virginia, is soliciting bids for the Hague NE Bulkhead Rehabilitation project (Solicitation 22275 RB), which involves the replacement of the concrete bulkhead at the eastern portion of the Hague. The scope of work includes bypass pumping, maintenance of flow in storm drainage systems, survey and vibration monitoring, wetland planting, and the disposal of contaminated soils, estimated at 695 tons for the North side and 315 tons for the South side. The project is structured as a Base Bid with three additives, with several items converted to lump sum costs. Performance must adhere to modified AIA A201-2017 General Conditions and technical specifications prepared by Moffatt & Nichol. The contract requires a performance bond and a labor and material payment bond, each for 100% of the contract price, and a bid security of 5% of the total bid. Work must commence within ten days of the Notice to Proceed and be completed within 700 calendar days. Bidders must be registered Virginia contractors and hold a City of Norfolk business license. All bids must be submitted electronically via the OpenGov portal by December 7, 2026, with all Requests for Information (RFIs) due by November 16, 2026. Quality control is managed through a CQC Plan and VDOT Form C-25, with final site inspection and acceptance conducted by the Contracting Engineer.
Public Works (D&C)

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS