Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

South Embarcadero Mole Pier Renovation by Hilton Bayfront

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The South Embarcadero Mole Pier Renovation project, managed by the San Diego Unified Port District for the Hilton Bayfront, aims to increase public access and improve the pier for hotel events in San Diego, California. The scope of work includes installing a guardrail matching the existing embarcadero, adding stairs and an ADA-compliant ramp, and placing moveable benches for public use. To support event operations, embedded anchors for temporary tents will be installed, and new power will be provided from the hotel via 4-inch diameter conduits. The project involves three distinct work areas: Area 1 serves as the construction staging zone on the mole pier, Area 2 involves boring conduits from the promenade, and Area 3 focuses on the hotel's staff entry point. The project includes a preliminary exploration phase using a vac truck to locate subsurface utilities. Construction is anticipated to begin in early 2026 and last approximately three months, with specific boring phases estimated at two weeks. To comply with the Port Master Plan, the pier must remain open to the general public for at least 85 percent of the year, with hotel events limited to the remaining 15 percent. The project is categorized as exempt under CEQA Guidelines 15301 and 15302. The tenant is responsible for all legal compliance regarding stormwater, hazardous materials, and demolition debris.

General Info

San Diego Port project renovating South Embarcadero Mole Pier for Hilton Bayfront access.

Agency

California → San Diego Unified Port District

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Kelly CunninghamPlanner I
Justin ParsonsProject Manager

Full Description

Show more
The proposed project would involve the renovation of the existing South Embarcadero mole pier by Hilton Bayfront (Tenant)(Hotel) in the city of San Diego, California. The purpose of this proposed project is to enhance the existing South Embarcadero pier to increase public access to the currently unutilized pier and improve the existing pier space for exterior events for the Hotel. The pier would be open and accessible to the public when not being temporarily utilized for Hotel events. Work to specifically complete the proposed project is outlined as follows: • Install a guardrail around the pier to match the existing railing along the embarcadero. • Install stairs and an ADA ramp to connect the walkway to the mole pier which is currently at a lower elevation than the walkway. • Install embedded anchors in the mole pier to allow for easier temporary tent setup and removal for events (permanent tents are not permitted as part of this project. Installation of temporary tents in the future requires separate approval). • Install moveable benches on the mole pier for public use. The moveable benches would remain on the pier to be utilized as public seating unless otherwise temporarily removed for a special event. • Install new power at the mole pier by providing power from the Hotel. • Perform exploration of subsurface utilities prior to the start of boring activities to locate and ensure no disturbance to existing utilities. The purpose of the exploration phase is to examine and locate existing subsurface utilities prior to boring conduit. To complete this, a vac truck would take approximately 1 day to drill three 8” diameter holes adjacent to Area 2 to locate the existing utilities. The holes would remain open for approximately 5 days until the boring is completed, and they would then be filled in to match the existing concrete. The vac truck would be fenced off during the drilling and the open holes would be covered with delineators fastened to the top during the boring, therefore there are no anticipated impacts to public access during this exploration phase. There are three work areas for this project. Area 1 Area 1 consists of the existing mole pier and would be the construction staging area for the duration of the proposed project. Temporary fencing would be installed at the mouth of the pier that would extend no further than 8 feet into the promenade, maintaining access to the walkway for the duration of construction. The temporary tent anchors would be installed around the perimeter of the pier, and when not in use, would have a cap covering the anchors, therefore not posing any tripping hazards to the public. Area 2 To provide power to the pier from the Hotel’s underground utilities, existing pavers would be removed, and temporary fencing would be installed at Area 2, adjacent to the intersection of the South Embarcadero Promenade and the Park to Bay Link trail. A boring rig would be placed inside the fenced off area to bore approximately 4-inch diameter conduits to the pier. Public access on the promenade would not be restricted during this time as all boring activities would occur underground and this method of boring does not require closure of the promenade. This phase of the project would take approximately 2 weeks to complete. Upon completion of boring the conduits, the removed pavers, as well as disturbed landscaping, would be replaced in kind. Fencing of Area 2 would not block access to the adjacent walkway and public access would be maintained. Area 3 Area 3 is located in front of a staff entry door on the northern wall of the Hotel. To access power from the electrical room located directly on the inside of the building in Area 3, and using the same boring method, conduits would be bored from Area 2 to Area 3. The impacted doorway in Area 3 is for staff entry only and would not impact public access to the Hotel or to the adjacent pathway. Temporary fencing for boring activities would be in place in Area 3 for approximately 2 weeks. ADA compliance would be maintained with a side entry point and additional nearby entry options. The pier shall be open to the general public during park hours for at least 85% of the year. The pier may be utilized for Hotel events for up to 15% of the year which shall be distributed throughout the year and not occur only in the summer months (Port Master Plan Water and Land Use Policy 4.2.6). When not in temporary use for hotel-permitted events, the pier would remain open an accessible to the public at all times. During construction, proper public access signage would be implemented as well as notification of any restricted areas. Construction of the proposed project is anticipated to occur in early 2026 and take approximately 3 months to complete. The Tenant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
22275 RB - Hague NE Bulkhead Rehabilitation
Solicitation # 22275 RB
The City of Norfolk, Virginia, is soliciting bids for the Hague NE Bulkhead Rehabilitation project (Solicitation 22275 RB), which involves the replacement of the concrete bulkhead at the eastern portion of the Hague. The scope of work includes bypass pumping, maintenance of flow in storm drainage systems, survey and vibration monitoring, wetland planting, and the disposal of contaminated soils, estimated at 695 tons for the North side and 315 tons for the South side. The project is structured as a Base Bid with three additives, with several items converted to lump sum costs. Performance must adhere to modified AIA A201-2017 General Conditions and technical specifications prepared by Moffatt & Nichol. The contract requires a performance bond and a labor and material payment bond, each for 100% of the contract price, and a bid security of 5% of the total bid. Work must commence within ten days of the Notice to Proceed and be completed within 700 calendar days. Bidders must be registered Virginia contractors and hold a City of Norfolk business license. All bids must be submitted electronically via the OpenGov portal by December 7, 2026, with all Requests for Information (RFIs) due by November 16, 2026. Quality control is managed through a CQC Plan and VDOT Form C-25, with final site inspection and acceptance conducted by the Contracting Engineer.
Public Works (D&C)

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS