South Embarcadero Mole Pier Renovation by Hilton Bayfront

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The South Embarcadero Mole Pier Renovation project, managed by the San Diego Unified Port District for the Hilton Bayfront, aims to increase public access and improve the pier for hotel events in San Diego, California. The scope of work includes installing a guardrail matching the existing embarcadero, adding stairs and an ADA-compliant ramp, and placing moveable benches for public use. To support event operations, embedded anchors for temporary tents will be installed, and new power will be provided from the hotel via 4-inch diameter conduits. The project involves three distinct work areas: Area 1 serves as the construction staging zone on the mole pier, Area 2 involves boring conduits from the promenade, and Area 3 focuses on the hotel's staff entry point. The project includes a preliminary exploration phase using a vac truck to locate subsurface utilities. Construction is anticipated to begin in early 2026 and last approximately three months, with specific boring phases estimated at two weeks. To comply with the Port Master Plan, the pier must remain open to the general public for at least 85 percent of the year, with hotel events limited to the remaining 15 percent. The project is categorized as exempt under CEQA Guidelines 15301 and 15302. The tenant is responsible for all legal compliance regarding stormwater, hazardous materials, and demolition debris.

General Info

San Diego Port project renovating South Embarcadero Mole Pier for Hilton Bayfront access.

Agency

California → San Diego Unified Port District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

2024-061 South Embarcadero Mole Pier Renovation NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Kelly CunninghamPlanner I
Justin ParsonsProject Manager

Full Description

Show more
The proposed project would involve the renovation of the existing South Embarcadero mole pier by Hilton Bayfront (Tenant)(Hotel) in the city of San Diego, California. The purpose of this proposed project is to enhance the existing South Embarcadero pier to increase public access to the currently unutilized pier and improve the existing pier space for exterior events for the Hotel. The pier would be open and accessible to the public when not being temporarily utilized for Hotel events. Work to specifically complete the proposed project is outlined as follows: • Install a guardrail around the pier to match the existing railing along the embarcadero. • Install stairs and an ADA ramp to connect the walkway to the mole pier which is currently at a lower elevation than the walkway. • Install embedded anchors in the mole pier to allow for easier temporary tent setup and removal for events (permanent tents are not permitted as part of this project. Installation of temporary tents in the future requires separate approval). • Install moveable benches on the mole pier for public use. The moveable benches would remain on the pier to be utilized as public seating unless otherwise temporarily removed for a special event. • Install new power at the mole pier by providing power from the Hotel. • Perform exploration of subsurface utilities prior to the start of boring activities to locate and ensure no disturbance to existing utilities. The purpose of the exploration phase is to examine and locate existing subsurface utilities prior to boring conduit. To complete this, a vac truck would take approximately 1 day to drill three 8” diameter holes adjacent to Area 2 to locate the existing utilities. The holes would remain open for approximately 5 days until the boring is completed, and they would then be filled in to match the existing concrete. The vac truck would be fenced off during the drilling and the open holes would be covered with delineators fastened to the top during the boring, therefore there are no anticipated impacts to public access during this exploration phase. There are three work areas for this project. Area 1 Area 1 consists of the existing mole pier and would be the construction staging area for the duration of the proposed project. Temporary fencing would be installed at the mouth of the pier that would extend no further than 8 feet into the promenade, maintaining access to the walkway for the duration of construction. The temporary tent anchors would be installed around the perimeter of the pier, and when not in use, would have a cap covering the anchors, therefore not posing any tripping hazards to the public. Area 2 To provide power to the pier from the Hotel’s underground utilities, existing pavers would be removed, and temporary fencing would be installed at Area 2, adjacent to the intersection of the South Embarcadero Promenade and the Park to Bay Link trail. A boring rig would be placed inside the fenced off area to bore approximately 4-inch diameter conduits to the pier. Public access on the promenade would not be restricted during this time as all boring activities would occur underground and this method of boring does not require closure of the promenade. This phase of the project would take approximately 2 weeks to complete. Upon completion of boring the conduits, the removed pavers, as well as disturbed landscaping, would be replaced in kind. Fencing of Area 2 would not block access to the adjacent walkway and public access would be maintained. Area 3 Area 3 is located in front of a staff entry door on the northern wall of the Hotel. To access power from the electrical room located directly on the inside of the building in Area 3, and using the same boring method, conduits would be bored from Area 2 to Area 3. The impacted doorway in Area 3 is for staff entry only and would not impact public access to the Hotel or to the adjacent pathway. Temporary fencing for boring activities would be in place in Area 3 for approximately 2 weeks. ADA compliance would be maintained with a side entry point and additional nearby entry options. The pier shall be open to the general public during park hours for at least 85% of the year. The pier may be utilized for Hotel events for up to 15% of the year which shall be distributed throughout the year and not occur only in the summer months (Port Master Plan Water and Land Use Policy 4.2.6). When not in temporary use for hotel-permitted events, the pier would remain open an accessible to the public at all times. During construction, proper public access signage would be implemented as well as notification of any restricted areas. Construction of the proposed project is anticipated to occur in early 2026 and take approximately 3 months to complete. The Tenant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS