CUP #2025-005 – Wastewater Treatment Facility

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Azteca Milling LP is seeking a Conditional Use Permit from Madera County to construct and operate a wastewater treatment facility on approximately 409 acres of agricultural land at 23865 Avenue 18, Madera, California, covering APNs 029-280-054, 029-290-011, and 029-290-014. The project involves two facultative ponds that use a combination of anaerobic and aerobic processes to treat wastewater generated from corn washing operations, one storage pond with a 20-million-gallon capacity to hold reclaimed water for irrigation, one stormwater basin to separate and divert clean runoff, three worm beds utilizing BioFiltro BIDA biofilter technology for additional treatment, and a mechanical building housing blowers, electrical controls, a shop, and an office with a restroom. The treatment system is designed to operate independently or in series, with gravity flow between ponds ensuring continuity during power failures or pump malfunctions. Water too warm for the worm beds will be diverted to an equalization tank via a variable-flow pump, allowing for flexibility in treatment pathways. Treated water will irrigate up to 40 acres of forage crops replacing almonds east of Road 24, with potential future expansion to irrigate the broader property via a possible remote storage pond. Solids management includes periodic replacement of wood chips in worm beds approximately every one to three years, with logistics for transporting new and used chips via 35 to 70 and 20 to 40 truck trips respectively, with an option to use spent chips as soil amendments. The existing pipeline system will be modified to improve solids separation before treatment, and a new underground conduit will be installed beneath Road 24 to connect the storage pond to the irrigation fields. All aspects of the project comply with California environmental regulations, including CEQA, the California Model Water Efficient Landscape Ordinance, and requirements from the California Department of Fish and Wildlife, with no federal procurement clauses or contracting terms applicable due to the nature of the permitting process. Madera County acts as the lead agency, with Samuel Rashe as the primary point of contact, while Azteca Milling LP remains responsible for implementation. The project is designed to recycle wastewater into a sustainable water source for agricultural use, reducing reliance on freshwater inputs and promoting resource efficiency.

General Info

Azteca Milling LP to build wastewater treatment facility on 409 acres for irrigation, using ponds, worm beds, and reclaimed water.

Agency

California → Madera County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Chowchilla, CA, 93636

Set-Aside

NONE

Documents

(7)

Notice of Determination for CUP #2025-005 Wastewater Treatment Facility

PDFnotice-of-determination

Notice of Intent to Adopt Mitigated Negative Declaration 2025-004

PDFspecial-notice

CDFW Comment on Madera County Wastewater Treatment Facility MND 2025091405

PDFcomment-letter

Summary Form for Document Submittal - CUP #2025-005 Wastewater Treatment Facility

PDFenvironmental-summary

CUP 2025-005 Wastewater Treatment Facility Initial Study

PDFinitial-study

CUP #2025-005 Wastewater Treatment Facility Notice of Completion

PDFnotice-of-completion

DSOD Review Letter for CUP #2025-005 Wastewater Treatment Facility

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Madera County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Madera County
Office AddressN/A
Contacts
Samuel J. RasheSenior Planner

Full Description

Show more
The applicant is requesting a Conditional Use Permit on APN(s): 029-280-054; 029-290-011;014, located on the northwest and northeast corner of Avenue 18 and Road 24 (23865 Avenue 18), Madera, to allow for the construction of two wastewater treatment facultative ponds, one storage pond, one stormwater basin, one mechanical building and three worm beds to process and reclaim wastewater from corn washing operations. The reclaimed water will be used for irrigation purposes. The parcels are approximately 409 total acres and rectangle in shape. Parcel 029-280-054 is separated from parcels 029-290-011 and 029-290-014 by Road 24. Parcels 029-290-011 and 029-290-014 are connected near the intersection of Road 24 and Avenue 18. Currently, the parcels are being used for agricultural uses related to Azteca Milling operations. Operations on the parcel are focused on processing corn and washing corn. The topography of the parcels are relatively low elevations and flat, consistent with the Central Valley floor’s characteristics. The project proponent proposes to implement two types of wastewater treatment – a facultative pond (combination of anaerobic and aerobic treatment) and BioFiltro BIDA biofilter worm system. Each type of treatment will have the capacity to completely treat the wastewater prior to storage. Azteca also requested that the two types also work in parallel or in series. The existing pipe delivery system from the facility to the current field area will be altered slightly. Stormwater runoff from the main buildings and plant area, currently comingled with wastewater, will generally be routed separately to the treatment area and sent directly to the storage pond, bypassing treatment systems. Azteca plans to improve solids separation with some additional equipment before sending the wastewater out to the treatment area in the existing pipeline. Facultative Pond 1 will receive the wastewater from the facility. The anaerobic and aerobic treatment will occur in both ponds. Water will gravity flow out of Facultative Pond 1 into Facultative Pond 2 where it will be treated further. After Facultative Pond 2, water will gravity flow out and into the storage pond. Gravity flow pond to pond ensures that if there is a pump issue or power outage, water will safely arrive at the storage pond. Due to higher water temperatures from the facility that the worms cannot take, water for the worm beds will be drawn off at the head end of Facultative Pond 1. This water will be pumped to an equalization tank. This pump will be variable flow and by that can operate at 100% flow (independent system) or partial flow to operate as a parallel system. If water is not pumped to the worm beds, then the facultative ponds will be operating independently. Post worm bed water treatment, water that is not pumped to the facultative ponds for further treatment (for series operation) will gravity flow to the storage pond providing that safety mechanism. Following water treatment, the water will be stored in a pond until it is needed for crop irrigation. The 20.0 MG (million gallons) is sized for storing the water generated in the non­irrigation periods of the Nutrient Management Plan plus a 100-year rainfall year collecting rainwater from the facility, treatment area, and the ponds directly. The treated water will be used to irrigate two fields on either side of the treatment area. East of Road 24, 40 acres of almonds will be removed, and another field will be created to irrigate forage crops in that area. A supply pipe from the storage pond will need to be routed underneath Road 24. In the future, treated water irrigation may continue into the remainder of the crop land (APNs 029-290-011 and -014). To accomplish this a remote storage pond may be needed and is shown in the site plan. In this potential scenario, water will be pumped from the main storage pond to the orchard pond to stage the water for the orchard irrigation system. Approximately everyone (1) to three (3) years, the wood chips will be replaced on a worm bed, typically spring or summer. Approximately 35 to 70 trucks will stage the new chips in the storage area to the east of the beds. Old chips will be moved to the side of a bed in a windrow, new chips will be placed on the bed, the worms will be transferred back to the bed, and the old chips will be allowed to dry before hauling away. Approximately 20 to 40 trucks will haul away the used chips. Alternatively, wood chips could be applied as a soil amendment to the land application area. The maintenance building will provide space for the blowers needed for the facultative ponds, a room for electrical panels and controls, a shop area, and an office with a restroom.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Town of Chelsea Accessibility Ramp RFP
Solicitation # 75037
The Town of Chelsea is seeking qualified contractors to remove and replace an accessibility ramp at Town Hall with a new structure that fully complies with current ADA standards while maintaining visual harmony with the building’s historic character. The preferred design enables direct access from the main sidewalk and requires detailed proposals specifying material choices such as composite or pressure-treated lumber, along with the style of posts and balusters. Contractors must evaluate the condition of existing foundations and footings, replacing any that are structurally inadequate, and are responsible for all field measurements, demolition, and proper disposal of the old ramp. Site preparation is essential, including modifying the ground as needed to ensure stable installation, and all work must be performed with care to protect adjacent buildings, landscaping, and utilities from damage during construction. Bids must be submitted by August 28, 2026, under solicitation number 75037, with all technical and compliance details clearly outlined in the proposal. The project is administered by the Vermont Department of Economic Development, and inquiries should be directed to Grants@chelseavt.us or 802-625-2023. While the solicitation is open to all eligible contractors, there is no set-aside designation, and the place of performance is in Chelsea, Vermont. Proposals will be evaluated based on adherence to accessibility requirements, design compatibility with the historic structure, thoroughness of the scope, and the quality of material and construction plans presented.
Department of Economic Development

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
Columbia Canal Embankment Repair Services
Solicitation # columbia-canal-embankment-repair-services
The City of Columbia is seeking contractors for the repair of the Columbia Canal embankment in Richland County, South Carolina, under solicitation number CIPDR 4241. This effort is targeted at restoring and stabilizing critical infrastructure along the canal, with work to be performed at the designated site in Columbia. The solicitation is set aside exclusively for small business concerns, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone firms, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, ensuring opportunities for historically underrepresented and certified small entities. The North American Industry Classification System code for this project is 237990, indicating it falls under other heavy and civil engineering construction. Interested parties must submit responses by August 26, 2026, with inquiries directed to Chandler Worley of Phillips Heavy, Inc., the designated point of contact. The project has been posted through the U.S. Small Business Administration’s contracting portal and is administered under the agency’s efforts to promote equitable access to federal and municipal construction opportunities. While specific technical requirements are not detailed here, contractors are expected to have proven experience in civil earthwork, erosion control, and embankment stabilization to meet the structural and safety demands of the canal infrastructure. Further details and application instructions are available via the provided public link.
Phillips Heavy, Inc

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details