CUP #2025-005 – Wastewater Treatment Facility

Forecast
CUP #2025-005State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Azteca Milling LP has obtained Conditional Use Permit CUP #2025-005 from Madera County to construct a wastewater treatment facility on approximately 409 acres located at the intersection of Avenue 18 and Road 24. The project is designed to process and reclaim wastewater from corn washing operations for use in crop irrigation. The facility will feature two facultative ponds for anaerobic and aerobic treatment, a BioFiltro BIDA biofilter worm system, a 20.0 million gallon storage pond, a stormwater basin, and a mechanical building to house blowers and electrical controls. The system is engineered for flexibility, allowing the worm beds and facultative ponds to operate independently, in parallel, or in series, with gravity flow mechanisms to ensure water safety during power outages. The project has undergone environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. Key compliance requirements include adhering to the California Model Water Efficient Landscape Ordinance and AB 32 greenhouse gas emission goals. The California Department of Fish and Wildlife has recommended specific biological mitigation measures to protect special-status species, including the Swainson's hawk, Western Burrowing Owl, and California Tiger Salamander. Additionally, the California Department of Water Resources Division of Safety of Dams has determined that the project does not currently fall under state dam safety jurisdiction, though any future design changes increasing reservoir capacity or dam height would require the oversight of a registered California Civil Engineer.

General Info

Azteca Milling LP will build a wastewater treatment facility for crop irrigation in Madera County.

Place of Performance

located on the northwest and northeast corner of Avenue 18, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Madera County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Madera County
Office AddressN/A
Contacts
Samuel J. RasheSenior Planner

Full Description

Show more
The applicant is requesting a Conditional Use Permit on APN(s): 029-280-054; 029-290-011;014, located on the northwest and northeast corner of Avenue 18 and Road 24 (23865 Avenue 18), Madera, to allow for the construction of two wastewater treatment facultative ponds, one storage pond, one stormwater basin, one mechanical building and three worm beds to process and reclaim wastewater from corn washing operations. The reclaimed water will be used for irrigation purposes. The parcels are approximately 409 total acres and rectangle in shape. Parcel 029-280-054 is separated from parcels 029-290-011 and 029-290-014 by Road 24. Parcels 029-290-011 and 029-290-014 are connected near the intersection of Road 24 and Avenue 18. Currently, the parcels are being used for agricultural uses related to Azteca Milling operations. Operations on the parcel are focused on processing corn and washing corn. The topography of the parcels are relatively low elevations and flat, consistent with the Central Valley floor’s characteristics. The project proponent proposes to implement two types of wastewater treatment – a facultative pond (combination of anaerobic and aerobic treatment) and BioFiltro BIDA biofilter worm system. Each type of treatment will have the capacity to completely treat the wastewater prior to storage. Azteca also requested that the two types also work in parallel or in series. The existing pipe delivery system from the facility to the current field area will be altered slightly. Stormwater runoff from the main buildings and plant area, currently comingled with wastewater, will generally be routed separately to the treatment area and sent directly to the storage pond, bypassing treatment systems. Azteca plans to improve solids separation with some additional equipment before sending the wastewater out to the treatment area in the existing pipeline. Facultative Pond 1 will receive the wastewater from the facility. The anaerobic and aerobic treatment will occur in both ponds. Water will gravity flow out of Facultative Pond 1 into Facultative Pond 2 where it will be treated further. After Facultative Pond 2, water will gravity flow out and into the storage pond. Gravity flow pond to pond ensures that if there is a pump issue or power outage, water will safely arrive at the storage pond. Due to higher water temperatures from the facility that the worms cannot take, water for the worm beds will be drawn off at the head end of Facultative Pond 1. This water will be pumped to an equalization tank. This pump will be variable flow and by that can operate at 100% flow (independent system) or partial flow to operate as a parallel system. If water is not pumped to the worm beds, then the facultative ponds will be operating independently. Post worm bed water treatment, water that is not pumped to the facultative ponds for further treatment (for series operation) will gravity flow to the storage pond providing that safety mechanism. Following water treatment, the water will be stored in a pond until it is needed for crop irrigation. The 20.0 MG (million gallons) is sized for storing the water generated in the non­irrigation periods of the Nutrient Management Plan plus a 100-year rainfall year collecting rainwater from the facility, treatment area, and the ponds directly. The treated water will be used to irrigate two fields on either side of the treatment area. East of Road 24, 40 acres of almonds will be removed, and another field will be created to irrigate forage crops in that area. A supply pipe from the storage pond will need to be routed underneath Road 24. In the future, treated water irrigation may continue into the remainder of the crop land (APNs 029-290-011 and -014). To accomplish this a remote storage pond may be needed and is shown in the site plan. In this potential scenario, water will be pumped from the main storage pond to the orchard pond to stage the water for the orchard irrigation system. Approximately everyone (1) to three (3) years, the wood chips will be replaced on a worm bed, typically spring or summer. Approximately 35 to 70 trucks will stage the new chips in the storage area to the east of the beds. Old chips will be moved to the side of a bed in a windrow, new chips will be placed on the bed, the worms will be transferred back to the bed, and the old chips will be allowed to dry before hauling away. Approximately 20 to 40 trucks will haul away the used chips. Alternatively, wood chips could be applied as a soil amendment to the land application area. The maintenance building will provide space for the blowers needed for the facultative ponds, a room for electrical panels and controls, a shop area, and an office with a restroom.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Carroll Creek Stream Restoration - CIP# 350007 (MWBE Goals)
Solicitation # IFB-27-11
The City of Frederick is soliciting bids for the Carroll Creek Stream Restoration project (CIP# 350007), located near Old Gas House Pike and Fairview Cemetery in Frederick, Maryland. This comprehensive construction project involves in-stream structure installation, floodplain bench grading, bank stabilization, and extensive planting. Key technical requirements include the installation of reinforced soil lifts, rock sills, and various riparian plantings, with an engineer's estimated project cost of $6,884,784.12. The project is performed on a lump sum and unit price basis and requires strict adherence to Virginia OSHA Standards for excavation and Maryland Department of the Environment guidelines for waterway construction. The bid submission deadline is November 13, 2026, at 3:00 pm, with all responses submitted via the OpenGov Portal. Bidders must meet specific socioeconomic goals, including 31% MBE, 11% WBE, and 2% SDVOSB participation. Required financial securities include a bid bond of 5% of the bid price, followed by 100% performance and materialmen's bonds upon award, and a two-year maintenance bond upon completion. The contract includes a two-year guarantee on all work and stipulates liquidated damages of $500 per calendar day for delays beyond the substantial completion date. Award decisions will be based on the vendor's responsiveness to material requirements and their overall responsibility, including technical capacity and performance record.
Engineering

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
Northside Park Site Improvements
Solicitation # RFP #27032
The County of Greenville is soliciting proposals from qualified general contractors for site improvements at Northside Park in Taylors, South Carolina. The scope of work includes comprehensive renovations involving demolition of existing pavement, fencing, and amenities, as well as the installation of new heavy-duty concrete paving, a 27'x40' pavilion shade structure, and expanded athletic courts including additional pickleball courts. The project also encompasses site work, grading, stormwater treatment, and landscaping, including the installation of sod and specific UltraSite branded park furniture. All work must adhere to building codes and the full intent of ADA Title II guidelines. The project is scheduled to begin with a Notice to Proceed on December 28, 2026, with construction starting January 1, 2027, and a desired completion date of May 15, 2027. Proposals are evaluated on a 25-point scale across five equally weighted categories: responsiveness, experience, references, pricing, and project-specific approach. Awarded contractors must provide a Performance and Payment Bond for the total contract price and maintain all required insurance. Payment is based on monthly invoicing with a 30-day term, and the County will withhold 10 percent of each payment until the project is satisfactorily completed. Liquidated damages of $250 per day apply if the work is not completed within 90 calendar days of the Notice to Proceed. All submissions must be received electronically via the County's procurement portal by November 25, 2026.
PARKS ADMINISTRATION

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
22275 RB - Hague NE Bulkhead Rehabilitation
Solicitation # 22275 RB
The City of Norfolk, Virginia, is soliciting bids for the Hague NE Bulkhead Rehabilitation project (Solicitation 22275 RB), which involves the replacement of the concrete bulkhead at the eastern portion of the Hague. The scope of work includes bypass pumping, maintenance of flow in storm drainage systems, survey and vibration monitoring, wetland planting, and the disposal of contaminated soils, estimated at 695 tons for the North side and 315 tons for the South side. The project is structured as a Base Bid with three additives, with several items converted to lump sum costs. Performance must adhere to modified AIA A201-2017 General Conditions and technical specifications prepared by Moffatt & Nichol. The contract requires a performance bond and a labor and material payment bond, each for 100% of the contract price, and a bid security of 5% of the total bid. Work must commence within ten days of the Notice to Proceed and be completed within 700 calendar days. Bidders must be registered Virginia contractors and hold a City of Norfolk business license. All bids must be submitted electronically via the OpenGov portal by December 7, 2026, with all Requests for Information (RFIs) due by November 16, 2026. Quality control is managed through a CQC Plan and VDOT Form C-25, with final site inspection and acceptance conducted by the Contracting Engineer.
Public Works (D&C)

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Madera County

Same awarding agency

NAICS: 541370
SLED
PM# 4320 - Bedrock Engineering
Solicitation # PM# 4320
Project PM# 4320, managed by the Madera County Community and Economic Development Department, involves the division of 85.61 acres of property into three distinct parcels. Parcel 1 consists of approximately 13.46 acres on the southwest side of Fairmead Blvd, Parcel 2 comprises 12.81 acres on the northeast side of Fairmead Blvd, and Parcel 3 consists of 59.34 acres located on the southwest side of Ave 20 1/2. The project is designed for a two-phase development approach, with the first phase focusing on Parcel 1 to include a 10,000-square-foot convenience market, a gas station with 20 fueling positions, a truck fueling area with 6 positions, an electric truck charging area with 4 positions, a 6,000-square-foot truck repair shop, and hotel buildings with 200 rooms. The second phase is intended for light industrial uses on Parcels 2 and 3. The project has undergone environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. Key environmental considerations include the implementation of lighting measures to reduce light pollution, protocols for the discovery of human remains, and required traffic intersection improvements to satisfy Caltrans standards for neighboring state highway facilities. The project was approved on October 8, 2025, with a final Notice of Determination filed on December 30, 2025, stating that the project will not have a significant environmental effect. Future construction must comply with Title 24 standards and water quality regulations during the building permit and inspection process.
Surveying and Mapping (except Geophysical) Services

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS