Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

PM# 4320 - Bedrock Engineering

Forecast
PM# 4320State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Project PM# 4320, managed by the Madera County Community and Economic Development Department, involves the division of 85.61 acres of property into three distinct parcels. Parcel 1 consists of approximately 13.46 acres on the southwest side of Fairmead Blvd, Parcel 2 comprises 12.81 acres on the northeast side of Fairmead Blvd, and Parcel 3 consists of 59.34 acres located on the southwest side of Ave 20 1/2. The project is designed for a two-phase development approach, with the first phase focusing on Parcel 1 to include a 10,000-square-foot convenience market, a gas station with 20 fueling positions, a truck fueling area with 6 positions, an electric truck charging area with 4 positions, a 6,000-square-foot truck repair shop, and hotel buildings with 200 rooms. The second phase is intended for light industrial uses on Parcels 2 and 3. The project has undergone environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. Key environmental considerations include the implementation of lighting measures to reduce light pollution, protocols for the discovery of human remains, and required traffic intersection improvements to satisfy Caltrans standards for neighboring state highway facilities. The project was approved on October 8, 2025, with a final Notice of Determination filed on December 30, 2025, stating that the project will not have a significant environmental effect. Future construction must comply with Title 24 standards and water quality regulations during the building permit and inspection process.

General Info

Project PM# 4320 divides 85.61 acres for commercial and light industrial development.

Place of Performance

Road 22 and State Route 99, Madera, CA, 93638

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Madera County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Madera County
Office AddressN/A
Contacts
Mike MontgomeryProperty Owner
Trevor StearnsSenior Planner

Full Description

Show more
The applicant is requesting a Parcel Map dividing 85.61 acres of property into three parcels. Parcel one is approximately 13.46 acres and is located on the southwest side of Fairmead Blvd. Parcel two is located on the northeast side of Fairmead Blvd and is approximately 12.81 acres. Parcel three which is contiguous to parcel two and located on the southwest side of Ave 20 ½ is approximately 59.34 acres. It is anticipated that, subsequent to recording of the map, the site would be developed in two phases. No development permits have been applied for at the time of the environmental analysis. The first phase of development is expected to occur on Parcel 1 west of Fairmead Boulevard.

Similar Contracts

Same NAICS industry code

NAICS: 541370
New
International
Baglan bay Topographical Survey
Solicitation # C093/02026/2027
The Welsh Government is seeking a qualified contractor to perform a topographical survey of the Baglan Bay site, located southwest of the M4 motorway in Wales. The project covers approximately 170.62 hectares and requires a three-dimensional survey of existing ground levels and site features, including utilities, highways, structures, hardstanding, boundaries, drainage, and water features. The contractor must deliver a three-dimensional digital ground model along with AutoCAD DWG and PDF drawings. The contract is estimated to have a total value of £350,000 excluding VAT and is scheduled to run for a three-month term from January 18, 2027, to April 18, 2027. To qualify, bidders must demonstrate that geomatics or land surveying is a principal business activity and provide evidence of being an RICS Regulated Firm with staff holding professional qualifications such as MRICS or FRICS. Mandatory requirements include a pass/fail assessment of legal and financial capacity, as well as minimum insurance coverage of £1,000,000 for Professional Indemnity and £5,000,000 each for Public and Employers' Liability. The contract award will be based on a weighted evaluation consisting of price at 70%, technical quality at 20%, and social value at 10%. Tenders must be submitted in English via the eTenderWales portal by December 7, 2026.
Llywodraeth Cymru / Welsh Government

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Madera County

Same awarding agency

NAICS: 237990
SLED
CUP #2025-005 – Wastewater Treatment Facility
Solicitation # CUP #2025-005
Azteca Milling LP has obtained Conditional Use Permit CUP #2025-005 from Madera County to construct a wastewater treatment facility on approximately 409 acres located at the intersection of Avenue 18 and Road 24. The project is designed to process and reclaim wastewater from corn washing operations for use in crop irrigation. The facility will feature two facultative ponds for anaerobic and aerobic treatment, a BioFiltro BIDA biofilter worm system, a 20.0 million gallon storage pond, a stormwater basin, and a mechanical building to house blowers and electrical controls. The system is engineered for flexibility, allowing the worm beds and facultative ponds to operate independently, in parallel, or in series, with gravity flow mechanisms to ensure water safety during power outages. The project has undergone environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration. Key compliance requirements include adhering to the California Model Water Efficient Landscape Ordinance and AB 32 greenhouse gas emission goals. The California Department of Fish and Wildlife has recommended specific biological mitigation measures to protect special-status species, including the Swainson's hawk, Western Burrowing Owl, and California Tiger Salamander. Additionally, the California Department of Water Resources Division of Safety of Dams has determined that the project does not currently fall under state dam safety jurisdiction, though any future design changes increasing reservoir capacity or dam height would require the oversight of a registered California Civil Engineer.
Other Heavy and Civil Engineering Construction

POSTED

12 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS