Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Bay Farm Island Emergency Erosion Prevention Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bay Farm Island Emergency Erosion Prevention Project aims to temporarily stabilize approximately 0.04 miles of eroded shoreline along the north shore of Bay Farm Island in Alameda, California, to protect the San Francisco Bay Trail from further degradation caused by winter storms. The trail, a ten-foot-wide paved path used by bikers and pedestrians, runs from the SR 61 bridge through Shoreline Park to the Harbor Bay Ferry Terminal and beyond. Emergency measures are needed to prevent destabilization of the pathway and ensure public safety during the 2025/2026 winter season and subsequent winters until a permanent shoreline levee is constructed as part of the broader Bay Farm Island Adaptation Project. The solution involves installing three segments of 24-inch-tall, 34-inch-wide Super Tiger Dams, totaling about 200 linear feet, filled with water from San Leandro Bay and secured with earthen anchors according to manufacturer guidelines. These temporary dams will be installed annually at the start of each winter storm season beginning in 2025 and removed at the end of each season for cleaning, maintenance, and off-site storage, to be reinstalled the following year. The project is designed as a short-term, seasonal intervention to mitigate ongoing erosion while long-term solutions are developed and permitted. The initiative is overseen by the Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland, with Nathaniel Goetz, Water Resource Control Engineer, serving as the primary point of contact for coordination and compliance. The work is limited to the specified reach of the trail and strictly adheres to seasonal timing to minimize environmental disruption while prioritizing infrastructure integrity and public safety.

General Info

Temporary Super Tiger Dams installed seasonally to protect Bay Farm Island trail from erosion until permanent levee is built.

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Alameda, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A
Contacts
Nathaniel GoetzWater Resource Control Engineer

Full Description

Show more
The Project purpose is to temporarily repair eroded areas of the Bay Farm Island north shore from further erosion and undermining of the bike/pedestrian pathway along San Leandro Bay (Bay) in the City of Alameda (Lat. 37.748056; Long. -122.246667). About 0.04 miles of the shoreline adjacent to the San Francisco Bay Trail (Trail) were eroded in storms during the 2024/2025 winter season. The Trail in this location consists of a ten-foot-wide paved asphalt path for bikers and pedestrians. The segment extends from the SR 61 bridge, through Shoreline Park, to the Harbor Bay Ferry Terminal and beyond. Temporary stabilization is needed to prevent further destabilization and damage to the Trail shoreline and protect public safety during the winter season beginning in 2025/2026. The Permittee is developing a shoreline levee design as part of the Bay Farm Island Adaptation Project that will provide near-term stabilization for the Project reach of the Trail shoreline. The Project will be implemented during each winter storm season until the shoreline levee is permitted and constructed. The Project will install approximately 200 linear feet (LF) of 24" tall and 34" wide Super Tiger Dams (Dams) at three locations along the Trail. The Dams will be filled with water from the adjacent Bay and held in place with earthen anchors per the manufacturer specifications. At the end of each winter storm season, the Dams will be emptied, cleaned and stored off site and installed the following year. The Project will be implemented annually between winter and spring beginning in 2025.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS