Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Larkspur Marina Bulkhead Replacement Project (Notification of Lake or Streambed Alteration, No. EPIMS-MAN-56958-R3 Amendment No.1).

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Larkspur Marina Bulkhead Replacement Project involves the replacement of an existing bulkhead wall along the shoreline of Larkspur Lagoon in Corte Madera, California, using a fiber-reinforced vinyl system installed via vibratory method with a small excavator, without any pile driving. Access to the construction site is facilitated by a temporary 2.5-foot by 15-foot dock secured with eight helical piles, and work is conducted from three floating platforms—two measuring 40 by 60 feet and one 60 by 30 feet. The project includes removing the existing concrete cap, filling the space between the old and new bulkheads with compacted fill, and installing a new cap. Turbidity controls such as silt curtains are required around all active work areas to limit sediment dispersion into the lake, and construction activities must cease by November 30 to protect the larval habitat of the Longfin smelt. The lake outlet remains functional through a one-way duckbill valve to maintain flood control and water quality, while a pump system connected to Corte Madera Creek manages lake levels seasonally. An existing easement provides access to staging areas and floating platforms. The project results in 162,141 square feet of temporary impacts from floating platforms, the access dock, and silt curtains—all to be removed upon completion—and 8,538 square feet of permanent impacts from the new bulkhead and fill material. This amendment to EPIMS-MAN-56958-R3 is administered by the California Department of Fish and Wildlife under Section 1602 of the Fish and Game Code and qualifies for a Class 2 categorical exemption under CEQA as a replacement of an existing structure with comparable function. No federal acquisition regulations apply; the process is a state environmental notification and amendment, with project oversight handled by the agency’s Environmental Scientist Jordan Beaton and project representative Lewis Tanenbaum. There are no contractual pricing details, delivery schedules, or formal evaluation criteria, as the activity is regulatory rather than competitive procurement.

General Info

Replace bulkhead with fiber-reinforced vinyl, no pile driving, seasonal work stoppage, turbidity controls, temporary and permanent shoreline impacts.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Corte Madera, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MAN-56958-R3 Amendment 1 Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Jordan BeatonEnvironmental Scientist
Lewis TanenbaumPerson or Public Agency Carrying Out Project

Full Description

Show more
The California Department of Fish and Wildlife has amended Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MAN-56958-R3 (Agreement), pursuant to Section 1602 of the Fish and Game Code, to Larkspur Marina Property Owners’ Association. The amendment allows an increase of temporary impacts associated with additional floating platforms and a temporary access dock, and changes to four Agreement measures. The Project is limited to replacing the existing bulkhead wall by constructing a new bulkhead wall built on the waterside of the existing bulkhead along the Lake shoreline. The new bulkhead will be constructed with fiber reinforced vinyl sheets and placed via vibratory method with a small excavator, no pile driving will take place. Access for equipment and materials will take place from a temporary dock approximately 2.5 feet long by 15 feet wide, which will be secured with eight seven-inch diameter shaft helical piles, which will be installed and removed by screwing into and out of the Lake bed using a screw-in attachment to an excavator. Construction of the new bulkhead will be conducted from three floating platforms, two approximately 40 feet wide by 60 feet long and one approximately 60 feet wide by 30 feet long. The concrete cap of the existing bulkhead will be removed as necessary. The space between the existing bulkhead and the new bulkhead will be filled with compacted fill material and a new cap will be installed. Turbidity controls (e.g., silt curtains or similar) will be used around the active work areas, which will allow suspended solids to drop out and minimize turbidity in the Lake. The Lake inlets will be closed off by November 30 which is the end of the work period for larval Longfin smelt (Spirinchus thaleichthys) for the duration of construction activities. The Lake outlet, which is controlled by a one-way duckbill valve, will remain operational and used to lower lake levels as necessary to maintain flood control operations and water quality. A pump system connecting to Corte Madera Creek side channel and the Lake will be used to raise the level of the Lake as necessary during wet and dry seasons to maintain water quality, flood control, and integrity of the existing bulkhead. An existing easement over the outfall pipe in the northeast section of the Lake will be used for access to the floating platforms and staging materials and equipment. The Project will result in 162,141 square feet (3.72 acres) of temporary impacts associated with shade and piles caused by the temporary dock for project access, three floating platforms traversing through the Lake, and the use of silt curtains, which shall all be removed immediately after Project completion. The Project will result in 8,538 square feet (0.196 acres) of permanent impacts associated with bulkhead construction and fill.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 17 hours ago

DEADLINE

in 26 days
View Details