Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Larkspur Marina Bulkhead Replacement Project (Notification of Lake or Streambed Alteration, No. EPIMS-MAN-56958-R3 Amendment No.1).

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Larkspur Marina Bulkhead Replacement Project, located in Corte Madera, California, involves an amendment to the Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MAN-56958-R3. This amendment, approved by the California Department of Fish and Wildlife, allows for increased temporary impacts due to the use of additional floating platforms and a temporary access dock. The primary scope of work is to replace an existing bulkhead wall with a new structure built on the waterside using fiber-reinforced vinyl sheets. The installation will utilize a vibratory method with a small excavator, specifically prohibiting pile driving. The project includes removing the existing concrete cap where necessary, filling the gap between the old and new bulkheads with compacted material, and installing a new cap. Environmental protection is a critical component of the project, requiring the use of turbidity controls like silt curtains to minimize suspended solids in the lake. To protect the larval Longfin smelt, all lake inlets must be closed off by November 30. The project will result in approximately 3.72 acres of temporary impacts from shade and piles caused by the temporary dock and floating platforms, all of which must be removed upon completion. Permanent impacts are estimated at 0.196 acres due to the bulkhead construction and fill. The project is classified under a Class 2 categorical exemption, as it replaces existing structures with similar purpose and capacity, and is being carried out by the Larkspur Marina Property Owners' Association.

General Info

Larkspur Marina bulkhead replacement in California using fiber-reinforced vinyl sheets and turbidity controls.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Corte Madera, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MAN-56958-R3 Amendment 1 Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Jordan BeatonEnvironmental Scientist
Lewis TanenbaumPerson or Public Agency Carrying Out Project

Full Description

Show more
The California Department of Fish and Wildlife has amended Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MAN-56958-R3 (Agreement), pursuant to Section 1602 of the Fish and Game Code, to Larkspur Marina Property Owners’ Association. The amendment allows an increase of temporary impacts associated with additional floating platforms and a temporary access dock, and changes to four Agreement measures. The Project is limited to replacing the existing bulkhead wall by constructing a new bulkhead wall built on the waterside of the existing bulkhead along the Lake shoreline. The new bulkhead will be constructed with fiber reinforced vinyl sheets and placed via vibratory method with a small excavator, no pile driving will take place. Access for equipment and materials will take place from a temporary dock approximately 2.5 feet long by 15 feet wide, which will be secured with eight seven-inch diameter shaft helical piles, which will be installed and removed by screwing into and out of the Lake bed using a screw-in attachment to an excavator. Construction of the new bulkhead will be conducted from three floating platforms, two approximately 40 feet wide by 60 feet long and one approximately 60 feet wide by 30 feet long. The concrete cap of the existing bulkhead will be removed as necessary. The space between the existing bulkhead and the new bulkhead will be filled with compacted fill material and a new cap will be installed. Turbidity controls (e.g., silt curtains or similar) will be used around the active work areas, which will allow suspended solids to drop out and minimize turbidity in the Lake. The Lake inlets will be closed off by November 30 which is the end of the work period for larval Longfin smelt (Spirinchus thaleichthys) for the duration of construction activities. The Lake outlet, which is controlled by a one-way duckbill valve, will remain operational and used to lower lake levels as necessary to maintain flood control operations and water quality. A pump system connecting to Corte Madera Creek side channel and the Lake will be used to raise the level of the Lake as necessary during wet and dry seasons to maintain water quality, flood control, and integrity of the existing bulkhead. An existing easement over the outfall pipe in the northeast section of the Lake will be used for access to the floating platforms and staging materials and equipment. The Project will result in 162,141 square feet (3.72 acres) of temporary impacts associated with shade and piles caused by the temporary dock for project access, three floating platforms traversing through the Lake, and the use of silt curtains, which shall all be removed immediately after Project completion. The Project will result in 8,538 square feet (0.196 acres) of permanent impacts associated with bulkhead construction and fill.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS