Larkspur Marina Bulkhead Replacement Project (Notification of Lake or Streambed Alteration, No. EPIMS-MAN-56958-R3 Amendment No.1).
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Larkspur Marina Bulkhead Replacement Project involves the replacement of an existing bulkhead wall along the shoreline of Larkspur Lagoon in Corte Madera, California, using a fiber-reinforced vinyl system installed via vibratory method with a small excavator, without any pile driving. Access to the construction site is facilitated by a temporary 2.5-foot by 15-foot dock secured with eight helical piles, and work is conducted from three floating platforms—two measuring 40 by 60 feet and one 60 by 30 feet. The project includes removing the existing concrete cap, filling the space between the old and new bulkheads with compacted fill, and installing a new cap. Turbidity controls such as silt curtains are required around all active work areas to limit sediment dispersion into the lake, and construction activities must cease by November 30 to protect the larval habitat of the Longfin smelt. The lake outlet remains functional through a one-way duckbill valve to maintain flood control and water quality, while a pump system connected to Corte Madera Creek manages lake levels seasonally. An existing easement provides access to staging areas and floating platforms. The project results in 162,141 square feet of temporary impacts from floating platforms, the access dock, and silt curtains—all to be removed upon completion—and 8,538 square feet of permanent impacts from the new bulkhead and fill material. This amendment to EPIMS-MAN-56958-R3 is administered by the California Department of Fish and Wildlife under Section 1602 of the Fish and Game Code and qualifies for a Class 2 categorical exemption under CEQA as a replacement of an existing structure with comparable function. No federal acquisition regulations apply; the process is a state environmental notification and amendment, with project oversight handled by the agency’s Environmental Scientist Jordan Beaton and project representative Lewis Tanenbaum. There are no contractual pricing details, delivery schedules, or formal evaluation criteria, as the activity is regulatory rather than competitive procurement.
General Info
Agency
NAICS
Place of Performance
Corte Madera, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code