Smith River Ranch LLC Water Diversion Project (Lake or Streambed Alteration Agreement No. EPIMS-DEL-58535-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves a single water diversion encroachment from Ritmer Creek in Del Norte County, California, for irrigation purposes, managed by Smith River Ranch LLC under Lake or Streambed Alteration Agreement EPIMS-DEL-58535-R1C. The diversion infrastructure consists of a boulder weir and sliding gate culvert that channels water to an off-stream reservoir, with instream work strictly limited to the relocation of stream gravels at the weir to maintain proper water surface elevation and prevent fish impingement on the diversion screen. All activities must comply with the California Department of Fish and Wildlife’s Fish Screen Criteria and are categorically exempt from CEQA review under Title 14 of the California Code of Regulations, Section 15304, due to their minor nature and absence of significant environmental impact. No hazardous materials are involved, and no construction beyond gravel relocation is permitted within the streambed. The project is located in Section 21, T18N, R01W, Humboldt Base and Meridian, with precise coordinates provided for the point of diversion, and is associated with APN 102-010-031. There is no formal contract value, pricing structure, or payment terms defined in the documentation, indicating this is an environmental permitting and compliance action rather than a traditional procurement contract. No FAR clauses, contract types, evaluation factors, or delivery schedules are included, and the document is classified as a forecast rather than a solicitation. The California Department of Fish and Wildlife, Region 1, serves as the regulatory authority, with Monty Larson listed as the primary point of contact and David Manthorne as the approving official. No official COR, COTR, PCO, invoicing procedures, accounting codes, or delivery terms are specified. The project has been signed as of October 10, 2025, and posted on November 20, 2025, but no submission deadlines, proposal formats, certifications, or socioeconomic status disclosures are provided, reflecting its nature as a regulatory agreement focused on environmental compliance rather than competitive acquisition.

General Info

Smith River Ranch LLC diverts Ritmer Creek water via boulder weir and culvert for irrigation, complying with CDFW fish screen criteria.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

approximately 1.65 miles northwest of the town of Smith River, CA

Set-Aside

NONE

Documents

(1)

EPIMS-DEL-58535-R1C Notice of Exemption for Smith River Ranch LLC Water Diversion Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Monty LarsonSenior Environmental Scientist Specialist
Chris HowardPlease contact Monty Larson of CDFW

Full Description

Show more
The Project is limited to one encroachment. The encroachment is for water diversion from Ritmer Creek. Water is diverted for irrigation. Work for the water diversion will include use and maintenance of the water diversion infrastructure, which consists of a boulder weir and sliding gate culvert to divert water to an off-stream reservoir. Instream work shall be limited to the relocation of stream gravels at the boulder weir to maintain water surface elevation at appropriate depth to avoid impingement of native fish species on the screen.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 12 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 17 hours ago

DEADLINE

in 26 days
View Details