CoastSnap 2025

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The CoastSnap 2025 project, managed by the California Department of Parks and Recreation's Santa Cruz District, involves the installation of two citizen-science coastal monitoring stations to support public engagement and coastal monitoring. The stations will be located at New Brighton State Beach in Santa Cruz County and Pescadero State Beach in San Mateo County. The scope of work includes excavating up to 4 cubic-feet for two post holes, installing 4x4-inch posts secured with backfilled soil, and attaching both interpretive directional signage and smartphone camera cradles to the top of each post. The project is classified under NAICS code 237990 and is categorically exempt from certain environmental reviews under Classes 1, 3, and 4 due to the minor nature of the alterations and the limited scale of the new facilities. Administrative oversight is provided by Linda Hitchcock, Senior Park and Recreation Specialist. The project was formally authorized via a Notice of Exemption dated November 19, 2025, and signed by District Superintendent Chris Spohrer.

General Info

Installing two citizen-science coastal monitoring stations at New Brighton and Pescadero State Beaches.

Agency

California Parks and Recreation, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for CoastSnap 2025 at New Brighton and Pescadero State Beaches

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Linda HitchcockSenior Park and Recreation Specialist

Full Description

Show more
Project consists of installing one (1) citizen-science coastal monitoring station at New Brighton State Beach and one (1) at Pescadero State Beach for the purpose of providing opportunities for coastal monitoring and public engagement. Work will: • Excavate up to 4 cubic-feet for two (2) post holes; • Install a 4x4-in. post into each hole and backfill with excavated soil to secure; • Attach directional and interpretive signage to each post; and • Attach a smartphone camera cradle to the top of each post.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS