Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

SHEET, METAL

Active
SPE8E9-26-T-3725Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract is for the procurement of nine perforated nickel-copper alloy metal sheets, measuring 0.078 inches thick, 36 inches wide, and 96 inches long. The material must adhere to exact dimensions with no test coupons allowed and must be supplied in whole feet lengths. A Certificate of Quality Compliance is mandatory for every shipment, and the product must be free of intentionally added mercury or mercury-containing compounds. Suppliers must be listed on the Qualified Suppliers List for Distributors (QSLD) to be eligible for award. Each unit must feature continuous identification markings, including the contract delivery order number, NSN, specification number, and manufacturer details, applied via stamping or stenciling. Delivery is set for the DLA Distribution facility in New Cumberland, Pennsylvania, with a required delivery date of February 21, 2027, and packaging must comply with MIL-STD-129 and ASTM A700 standards.

General Info

Procurement of nine nickel-copper alloy sheets for delivery to New Cumberland by 2027.

Agency

Department Of Defense → CONSTRUCTION & EQUIPMENT MRO SVC IView Agency

NAICS

331491 - Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, and ExtrudingView NAICS

Place of Performance

2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → CONSTRUCTION & EQUIPMENT MRO SVC I
Contacts1 person available
OfficeUSA
Organization / Agency
Department Of Defense → CONSTRUCTION & EQUIPMENT MRO SVC I
View Agency Profile
Office AddressUSA

Full Description

Show more
SHEET,METAL
METAL SHEET
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
Metal Certification Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information. If CDRL-METALSCERT is missing from DLA Technical Data Management Transformation (TDMT) they can also be viewed in the DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
NICKEL-COPPER ALLOY, PERFORATED
0.078 IN THK 36 IN W 96 IN LG
0.250 IN DIA PERF, 0.500 IN C TO C, STAG 60 DEGR
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
No sheets will be accepted unless they conform to exact dimensions per the item description: Test coupons are not allowed.
A Certificate of Quality Compliance (Mill-Material Certification) is required. A copy of the Certificate of Quality Compliance shall be provided with every shipment to the customer or DLA depot, and a copy of the Certificate of Quality Compliance provided for each shipment shall be forwarded to the DLA Troop Support Contracting Officer identified on the award.
CONTINUOUS IDENTIFICATION MARKINGS ARE REQUIRED IN ADDITION TO THE
MARKING REQUIREMENTS CITED IN THE PROCUREMENT SPECIFICATION:
SPE8E9-26-T-3725
SECTION B
AS A MINIMUM, EACH UNIT OF ISSUE (FEET,PLATE, OR SHEET) SHALL BE
IDENTIFIED WITH THE (1) DLA CONTRACT DELIVERY ORDER NUMBER, (2) NSN, (3)
SPECIFICATION NUMBER AND REVISION, (4) GRADE,CLASS & TYPE, ALLOY, PART
NUMBER,DIE NUMBER, AND TEMPER, (5) MANUFACTURER'S NAME, HEAT AND LOT
NUMBER, (6) DIMENSIONS.
MATERIAL SHALL BE SUPPLIED WITHIN THE REQUIRED MIN-MAX LENGTH
REQUIREMENTS AND MUST IN WHOLE FEET LENGTH ONLY (I.E. 10, 11, OR 12 FT
EVEN)
PERMISSIBLE MARKING METHODS ARE STAMPING (EXCEPT DIE STAMP) OR
STENCILING. THE CHARACTERS SHALL BE OF SUCH A SIZE AS TO BE LEGIBLE AND
VISIBLE TO THE UNAIDED EYE. THE MARKING FLUID APPLIED SHALL NOT
CONTAMINATE, OR OTHERWISE HAVE A DETRIMENTAL EFFECT ON THE PRODUCT OR
ITS PERFORMANCE. THE MARKINGS SHALL BE WATERPROOF AND SUFFICIENTLY
STABLE TO WITHSTAND NORMAL HANDLING.
IN LIEU OF "LINE MARKINGS", ADHESIVE LABELS ARE REQUIRED FOR EACH UNIT
OF STRAIGHT BARS, TUBES AND SHAPES, UNDER 0.250 INCHES IN NOMINAL OD,
AND TO BE SECURELY FASTENED. TAGS WILL BE ACCEPTABLE METHOD FOR WIRES.
FAILURE TO COMPLY WILL BE CAUSE FOR REJECTION OF END PRODUCT."
IY010: QUALIFIED SUPPLIERS LIST FOR DISTRIBUTORS (QSLD) REQUIREMENT (DLA
TROOP SUPPORT JUNE 1994) FOR FSG'S 95 AND 96.
ONLY SUPPLIERS LISTED ON THE QSLD ARE ELIGIBLE FOR AN AWARD PURSUANT TO
THIS SOLICITATION.
SUPPLIERS NOT QUOTING IN COMPLIANCE WITH THE QSLD REQUIREMENT MUST
INDICATE THEY ARE DEVIATING FROM THE REQUIREMENTS OF THE SOLICITATION.
ANY BID/QUOTE/OFFER BASED ON A PRODUCT SUPPLIED BY OTHER THAN AN
APPROVED QSL DISTRIBUTOR, EVEN THOUGH THE PRODUCT MIGHT HAVE BEEN
MANUFACTURED IN ACCORDANCE WITH THE DRAWING(S) AND/OR SPECIFICATION(S)
AS CITED IN THE PURCHASE ORDER
TEXT (POT) IS A BID/QUOTE/OFFER WITH EXCEPTION AND MUST BE SO INDICATED
BY THE
QUOTER/OFFEROR.
ANY PRODUCT FURNISHED UNDER A CONTRACT OR ORDER FOR A PRODUCT DESIGNATED
AS PART OF THE QSL PROGRAM, UNLESS SPECIFICALLY AUTHORIZED BY THE
GOVERNMENT IN WRITING, MUST FULLY COMPLY WITH THE TERMS AND CONDITIONS
OF THE QSL PROGRAM. ANY PRODUCT, WHICH DOES NOT FULLY COMPLY WILL BE
CONSIDERED AN UNAUTHORIZED SUBSTITUTION, AND MAY YIELD CRIMINAL
PENALTIES IN ADDITION TO ANY CIVIL REMEDIES AVAILABLE TO THE GOVERNMENT.
FOR THIS SOLICITATION, AND ANY RESULTING ORDER ISSUED TO AN APPROVED
QSLM/QSLD SUPPLIER
WHOSE QUOTE IS BASED ON COMPLIANCE WITH THE QSL PROGRAM, (EXCEPT IN THE
CASE OF FMS (FOREIGN MILITARY SALE) REQUIREMENTS), REFERENCES TO SOURCE
INSPECTION ARE HEREBY WAIVED. IN SUCH CASES, COQC, PVT, QAP-EQ003, ASQ
H1331, AND RQ006: QUALITY CONFORMANCE INSPECTION REQUIREMENTS, IF
REFERENCED, DO NOT APPLY.
FOR MORE INFORMATION ABOUT THE QSL PROGRAM GO TO THE FOLLOWING WEBSITE:
https://www.dla.mil/TroopSupport/IndustrialHardware/Engineering-and-Tech nical-services/Qualified-Suppliers-List/
-ORWRITE TO: DLA TROOP SUPPORT, ATTN: DLA TROOP SUPPORT FHTF, BLDG 3/B, 700 ROBBINS AVENUE, PHILADELPHIA, PA 19111-5092
Qualification requirements in procurement note #M03 Qualified Suppliers List for Manufacturers (QSLM)/Qualified Suppliers List for Distributors (QSLD) for Troop Support# apply. The full text of procurement note M03
SPE8E9-26-T-3725
SECTION B
can be found in the DLA Directive (DLAD) of Procurement Notes on the Web at: https://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx.
(END STO)
CRITICAL APPLICATION ITEM
TDP Rev A Gen 2 IAW BASIC UNK QQ-N-281D(2) NOT 1 REVISION NR D DTD 12/23/2020 PART PIECE NUMBER: CL-A,CR,ANLD
TDP Rev A Gen 2 IAW REFERENCE QAP 13873 CDRL-METALSCERT-26124 REVISION NR DTD 12/04/2025 PART PIECE NUMBER:
TDP Rev A Gen 2 IAW REFERENCE SPEC NR MIL-S-12875B NOT 2 REVISION NR B DTD 02/10/2023 PART PIECE NUMBER:
TDP Rev A Gen 2 IAW REFERENCE NON GOVT STD SAE AMS2807C REVISION NR C DTD 05/01/2024 PART PIECE NUMBER:
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7018160553 0001 SH 9.000
NSN/MATERIAL:9535002777429
DELIVERY (IN DAYS):0167
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA MIL-STD-2073-1E
QUP:001 PRES MTHD:ZZ CLNG/DRY:0 PRESV MAT:00
WRAP MAT:00 CUSH/DUNN MAT:00 CUSH/DUNN THKNESS:0
UNIT CONT:00 OPI:A
PACK CODE:U
MARKING SHALL BE IN ACCORDANCE WITH MIL-STD-129.
SPECIAL MARKING CODE:ZZ -ZZ Special Requirements
PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PRESERVATION ZZ = IAW ASTM A700 PACKING Z = ASTM A700
SPE8E9-26-T-3725
SECTION B
PR: 7018160553 PRLI: 0001 CONT’D
MARKING IAW MIL-STD-129
SPECIAL PACKAGING CODES Z AND ZZ SHALL BE AS SPECIFIED IN ASTM A700.
MARKING Z= MARKING SPECIFICATION(S) LISTED IN CONTRACT AND ADDITIONAL
REQUIREMENTS IN THE PURCHASE ORDER TEXT(POT).
ADDITIONAL MARKING REQUIREMENTS: WHEN THE
CONTRACT OR ORDER REFLECTS TWO UNITS
(EXAMPLE: FT-LB, LB-SH, LB-CL, ETC.)
SHIPMENT MARKINGS SHALL INCLUDE THE
QUANTITY OF BOTH UNITS. THIS MARKING
DOES NOT APPLY FOR MATERIAL SHIPPED LOOSE.
PARCEL POST ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
W25G1U
W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2083 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND PA 17070-5002
US
Need Ship Date:03/01/2027 Original Required Delivery Date:02/21/2027
SPE8E9-26-T-3725 NSN/Part Number: 9535-00-277-7429 Quantity: 9 SH Purchase Request: 7018160553QTY: 9 Delivery: 167 days ADO

Similar Contracts

Same NAICS industry code

NAICS: 331491
New
DIBBS
BRAZING ALLOY, COPPER
Solicitation # SPE8E6-26-T-4437
Solicitation SPE8E6-26-T-4437 is a fixed-price request for quotations issued by DLA Troop Support Construction and Equipment for the procurement of 66 units of copper brazing alloy, identified by NSN 3439-00-191-3250. The material is specified as a wire type with a 0.063 inch diameter and 15.5 percent silver content, with each unit consisting of 5 avoirdupois ounces. The contractor must mark each unit to indicate the quantity of material required to make one troy ounce. Delivery is required within 167 days after the award, with a need ship date of March 1, 2027, and shipment is designated as FOB Origin to DLA Distribution San Joaquin in Tracy, California. The procurement is fully competitive and incorporates various technical and quality requirements via the DLA Master List. Packaging must adhere to MIL-STD-2073-1E and RP001, while marking must comply with MIL-STD-129. Because the material is classified as hazardous, the contractor must provide Safety Data Sheets in accordance with 29 CFR 1910.1200 and follow IP025 for shipping. Award evaluation may include a price preference for certified HUBZone Small Business Concerns, and offers utilizing additive manufacturing are ineligible. Invoicing and payment will be processed electronically through the Wide Area WorkFlow system. Compliance with the Buy American Act, Berry Amendment, and DFARS safeguarding of covered defense information is required.
DLA DIST SAN JOAQUIN

POSTED

1 day ago

DEADLINE

in 11 days
View Details
NAICS: 331491
New
Federal
BAR,METAL
Solicitation # N0010426QFE85
This contract pertains to the procurement of metal bars designated as Special Emphasis Level I material for use in critical shipboard systems where failure could result in catastrophic consequences including loss of life or vessel. The material must comply with ASTM-B505 and ASTM-B824 specifications, specifically C90300 copper alloy in cast form, with strict dimensional tolerances, mechanical property requirements, and chemical composition validation. Traceability is mandatory from raw material through to final delivery, requiring unique heat-lot markings on each piece and certified test reports that directly link to those markings. All documentation must be submitted via WAWF to Portsmouth Naval Shipyard for review and acceptance prior to shipment, with no material allowed to proceed without formal acceptance. The contractor must maintain an ISO-9001 compliant quality system with calibration standards aligned to ISO-10012 or ANSI-Z540.3 and must submit quality system procedures prior to award. A certificate of compliance is required for every delivery, affirming full adherence to all specifications without disclaimers or qualifiers, and all data must be authentic and not transcribed. The contract mandates rigorous inspection protocols including 100% verification of traceability marks, certification document legibility, and nondestructive testing results. Sampling for lot acceptance follows a zero-defect standard, with full inspection of all chemical, mechanical, and NDT certifications. Any deviations or waivers require prior authorization from the Contracting Officer via ECDS and must be classified as Critical, Major, or Minor, with full documentation of impact and corrective actions. The material must be mercury-free, and all subcontractors must comply with the same quality and traceability standards under prime contractor oversight. Delivery is FOB destination, with final acceptance occurring at the destination site, and prompt payment terms are extended to 45 days after delivery. The procurement is issued under emergency acquisition flexibilities and is a combined solicitation with potential for multiple CLIN-level awards. Contractual obligations are reinforced by strong security, Buy American, and small business compliance requirements, with all data submissions and communications directed through the designated WAWF portal and contact point.
Navsup Weapon Systems Support Mech

POSTED

1 day ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of Defense → CONSTRUCTION & EQUIPMENT MRO SVC I

Same awarding agency