This Solicitation opportunity from Pennsylvania was posted on November 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Elk Creek Township in Erie County, Pennsylvania, is soliciting sealed bids for the Sherrod Hill Road Bridge Replacement Project, Contract 2025-SH. The scope of work involves replacing an existing 34-foot concrete adjacent box beam bridge with a new 64-foot-7-inch spread box beam bridge over Cussewago Creek, along with the reconstruction of approximately 510 feet of adjacent asphalt roadway. Technical requirements include the installation of steel production piles, epoxy-coated reinforcement bars, and the implementation of erosion and sedimentation control measures. The project also includes site preparation such as clearing, excavation, and seeding using Formula C conservation mix.
Bids must be submitted electronically via PennBid by 3:00 p.m. on December 9, 2025, and must be accompanied by a bid bond or certified check equal to 10% of the total bid. Contractors are required to be pre-qualified for Work Class Codes S1 and S9 and must comply with prevailing wage laws and equal employment opportunity regulations. Following the bid opening, the Elk Creek Township Supervisors are scheduled to review submissions and potentially award the contract on December 15, 2025. The township reserves the right to hold bids and security for up to 60 days to investigate bidder qualifications.
HighAI Summary for Contract 2025-SH Addendum No. 2 - Sherrod Hill Road Bridge Replacement: Addendum No. 2 dated December 8, 2025, for the Elk Creek Township Sherrod Hill Road Bridge Replacement (Contract 2025-SH). This document provides revised Structural Plan sheets 9 and 17, specifically updating the minimum depth requirements for the temporary excavation support and protection system (TESPS) and clarifying scour protection and removal depths.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract 2025-SH: Elk Creek Township Sherrod Hill Road Bridge Replacement - Addendum No. 1: Addendum No. 1 dated December 4, 2025, for the Sherrod Hill Road Bridge Replacement (Contract 2025-SH). This document provides critical revisions to the bidding documents, including updates to the Erosion and Sedimentation Control Plan, Structural Plan (Sheets 1, 4, 39), and Roadway Construction Plan (Sheet 3). Key changes include revised culvert sizes, updated item quantities for reinforcement bars and pile testing, a revised Bid Form, updated sales and use tax language (Article 22), and modified progress payment and retainage terms (Paragraph 6.02).
PDF
PDF, High priority: read this firstifb
HighAI Summary for Contract 2025-SH: Sherrod Hill Road Bridge Replacement: Invitation for Bids (IFB) issued October 22, 2025, by Elk Creek Township for the Sherrod Hill Road Bridge Replacement project (Contract 2025-SH). The scope includes replacing a 34-foot concrete box beam bridge with a new 64'-7'' spread box beam bridge and reconstructing 510 feet of asphalt roadway. Bids are due electronically via PennBid by December 9, 2025, at 3:00 p.m. The document includes the Invitation for Bids and Instructions to Bidders, specifying a 10% bid bond and requiring ECMS pre-qualification for Work Class Codes S1 and S9.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for Contract 2025-SH: Sherrod Hill Road Bridge Replacement Pre-Bid Meeting Minutes: Pre-bid meeting minutes dated November 20, 2025, for the Sherrod Hill Road Bridge Replacement (Contract 2025-SH) for Elk Creek Township. The document outlines bidding procedures via PennBid, a bid deadline of December 9, 2025, and an anticipated award date of December 15, 2025. It details several technical clarifications and pending addenda regarding deck grading, metal curb drains, pile load testing, mandatory predrilling, and driveway culvert sizing.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Contract No. 2025-SH - Elk Creek Township Sherrod Hill Road Bridge Replacement Bid Form: Bid form for the Sherrod Hill Road Bridge Replacement project (Contract No. 2025-SH) for Elk Creek Township. The document includes bidder representations, electronic submission instructions via PennBid, and a detailed bid schedule with PennDOT Master Item numbers for excavation, asphalt, and site work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Elk Creek Township Right-of-Way Plan - Sherrod Hill Road: Technical drawings and authorization for the acquisition of right-of-way for Sherrod Hill Road T-313 Section 000 in Elk Creek Township, Erie County, Pennsylvania. The document covers a length of 585 feet (STA 14+40.00 to 20+25.00) and includes design specifications such as a 40 MPH design speed and 20' pavement width. Prepared by Urban Engineers, Inc. and dated September 27, 2024.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Elk Creek Township - T-313 Sherrod Hill Road Bridge Construction Plans: Construction drawings and bid schedules for the T-313 Sherrod Hill Road Bridge over Cussewago Creek in Erie County, Pennsylvania. The document includes design designations (40 MPH design speed), a detailed bid tabulation of items (clearing, excavation, asphalt, and bridge structures), and an earthwork summary for the project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Road Construction Plan Sheet 3 (rev 12-4-2025): This document is a technical plan sheet dated December 4, 2025, containing detailed bid tabs and earthwork summaries for a road construction project. It includes itemized quantities for excavation, asphalt mixtures, bridge structures, and reinforcement bars, as well as a comprehensive earthwork summary table for various excavation classes.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Sherrod Hill Road Bridge - Abutment 1 Details (Sheet 9): Technical structure plan sheet 9 for the Sherrod Hill Road Bridge replacement (T-313) over Cussewago Creek in Erie County. Revised 12/08/2025, the document provides detailed engineering specifications for Abutment 1, including waterproofing details, scour protection, integral abutment pile installation, and H-pile-to-pile cap connection details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Sherrod Hill Road Bridge - Abutment 2 Details (Sheet 17): Technical structure plan sheet (Sheet 17) for the Sherrod Hill Road Bridge replacement over Cussewago Creek in Erie County. Revised 12/08/2025, the document provides detailed engineering specifications for Abutment 2, including waterproofing details, scour protection details, integral abutment pile installation, and H-pile-to-pile cap connection details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Structure Plan 5-1-2025 - Bridge Structure Quantities: Technical document dated May 1, 2025, detailing approximate quantities and work point data for a bridge structure project. It includes a detailed bid item table with quantities for excavation, concrete, reinforcement bars, and piling, along with specific technical notes and coordinate data for construction points.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for Structure Plan Sheet 1 Rev. 11-18-2025: Structure plan sheet 1 revision dated 11-18-2025 for the Sherrod Hill Road bridge replacement over Cussewago Creek in Erie County, PA. The drawing shows the general plan and elevation, hydraulic data, horizontal and vertical alignment, existing and proposed structure data, wingwall dimensions, notes, legends, and supplemental drawing references. It includes roadway/bridge geometry, stationing, clearances, foundation and pile information, temporary excavation support and protection system notes, and designer/reviewer metadata from Urban Engineers, Inc.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Structure Plan Sheet 39 (rev 11-21-2025): Technical drawing sheet detailing the method of attaining superelevation for a structure plan, dated November 21, 2025. Includes references to general notes, deck plans, and deck sections.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Structure Plan Sheet 4 - Approximate Quantities: Technical document dated 11-18-2025 providing approximate quantities for a bridge structure project. It includes a detailed bid tab with item numbers, units, and quantities for components such as excavation, concrete, reinforcement bars, and steel piles, along with specific technical notes regarding materials and installation.
PDF
PDF, Low priorityaward
LowAI Summary for Contract No. 2025-SH: Sherrod Hill Road Bridge Replacement Bid Results: Bid price summary for the Sherrod Hill Road Bridge Replacement project (Contract No. 2025-SH) for Elk Creek Township, dated December 9, 2025. The document contains a detailed cost comparison table across multiple bidders, including C.H. & D. Enterprises, Inc., Chivers Construction Company, Inc., Horizon Construction Group, Inc., Mekis Construction Corp, Thomas Construction, Inc, and XL Excavating, Inc., covering various line items such as clearing, excavation, asphalt, and mobilization.
PDF
PDF, Low priorityother
LowAI Summary for E&SC Plan 10-22-2025: The provided document content is empty or contains no readable text. Based on the filename, it appears to be an Erosion and Sediment Control (E&SC) Plan dated October 22, 2025.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseAwarded
Posted
Solicitation
Notice updated
Solicitation number changed from Elk Creek Township, Erie County to 209844. The notice description changed.
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Ref. #: Elk Creek Township, Erie County Sealed Bids will be received electronically via PennBid by Elk Creek Township for the Sherrod Hill Road Bridge Replacement Project, Contract 2025-SH, until 3:00 p.m. on Tuesday, December 9, 2025, at which time they will be opened electronically and a summary posted to the PennBid website. The Work is generally described as follows: Replacement of existing approximately 34-foot span concrete adjacent box beam bridge with new 64’-7” spread box beam bridge and reconstruction of approximately 510 feet of adjacent asphalt roadway. Bidding Documents may be obtained electronically via PennBid at no cost at www.PennBid.net There will be a pre-bid conference for this project held at the Elk Creek Township Building at 10405 High Street, Albion, PA 16401. The pre-bid conference will take place on Thursday, November 20, 2025 at 9:00 a.m. Attendance is strongly encouraged but not mandatory. A certified check or bank draft, payable to Elk Creek Township, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety, in an amount equal to 10% of the total of the Bid shall be submitted with each Bid. The Contractor must abide by all laws and regulations applicable to locally funded public contracts, including but not limited to equal employment opportunity. Prevailing wages will apply. The Elk Creek Township Supervisors will meet on Monday, December 15, 2025 at 7:30 p.m. at the Elk Creek Township Building at 10405 High Street, Albion, PA 16401 to review bids and to possibly award a contract. The Owner reserves the right to reject any or all bids and to waive any informalities in the bidding. Bids and Bid Security may be held by the Owner for a period not to exceed 60 days from the date of opening bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract.
More opportunities from Pennsylvania → Erie County