Shingle Station Paving and Drainage Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Shingle Station Paving and Drainage Project, managed by Caltrans District 2 in Redding, involves the rehabilitation of State Route 44 between post miles R26.8 and 71.389 in Shasta County. The project aims to restore the pavement to a state of good repair and upgrade failing infrastructure using state and federal funding. Key improvements include the modification of 48 culverts with flared end sections and rock slope protection, cold-planing and overlaying roadway sections with hot-mix asphalt, and the reconstruction of metal beam and thrie beam guardrails to meet current height standards. Additionally, the scope includes replacing outdated Intelligent Transportation Systems, specifically CCTV stations in Shingletown and at the Lassen Volcanic National Park Entrance, as well as upgrading signs and pavement markings. The project is estimated to be completed within one construction season, requiring approximately 160 working days. Implementation involves approximately 0.98 acres of ground disturbance with a maximum excavation depth of 12 feet. To ensure regulatory compliance, the project requires permits from the Army Corps of Engineers (Section 404), the Regional Water Quality Control Board (Section 401), and the California Department of Fish and Wildlife (Section 1602). Operational requirements include the use of one-way reversing traffic control, the acquisition of temporary and permanent drainage easements, and mandatory potholing to identify underground utility conflicts. The project is categorized as exempt under CEQA Section 15301 for existing facilities.

General Info

Caltrans rehabiliates SR 44 pavement, drainage, guardrails, signage, and CCTV systems in Shasta County within one season.

Agency

California → Caltrans, District 2 - Redding

Place of Performance

State Route 44, post mile R26.8 to 71.389, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Carolyn SullivanSenior Environmental Planner

Full Description

Show more
The California Department of Transportation, using State and federal funding, proposes to rehabilitate State Route 44 (SR 44) through repaving activities and drainage improvements. The limits of work occur between post mile (PM) R26.8 and 71.389 in Shasta County. The purpose of the project is to restore the pavement to a state of good repair; rehabilitate deficient culvert systems to restore the integrity of the traveled way; replace outdated Intelligent Transportation Systems (ITS) elements providing road condition information to the traveling public and Caltrans maintenance crews; and replace existing guardrail to meet current standards. The project is needed as the majority of pavement and appurtenant infrastructure are in a state of disrepair and/or outdated. The pavement is distressed resulting in significant maintenance activities and costs; project culverts are aged, deteriorated, and failing to adequately convey surface waters; and ITS elements are at the end of their useful life and need to be replaced. Project implementation would include the following improvements: Drainage Improvements (PM R26.81 to 70.03) As part of the proposed project, 48 culverts would be modified along the length of the corridor. Depending on the location, the proposed culvert improvements would include various treatments (i.e., flared end sections, drainage inlets, headwalls, and rock slope protection). Vegetation removal would be required to facilitate the improvements. A detailed description of the proposed drainage improvements is provided in Table 1. Roadway Improvements (PM 57.0 to 67.0) • Cold-plane and overlay activities with hot-mixed asphalt (HMA). • Install 0.20 feet between edge of pavement and edge of pavement • Install 0.15 feet at intersection of SR 44 and 89; re-establish transverse grooves in westbound lane • Perform digouts at various locations • Overlay/conform ±18 paved road connections, including permittable driveways to match the travelway. Unpaved driveways and road connections would be conformed with shoulder backing. • In conjunction with pavement overlay, replace existing high friction surface treatment between PM 58.90 and 59.35 • Install shoulder backing to support edge of pavement Signs, Delineation, and Mailboxes (PM R26.81 to 71.38) • Upgrade/replace signs in accordance with current standards. • Reset two mailboxes • Replace recessed pavement markers; apply sprayable thermoplastic pavement striping/marking throughout the project corridor Traffic Safety Reconstruct existing metal beam and thrie beam guardrails to meet current height requirements Traffic Management Systems Replace the existing Closed-Circuit Television (CCTV) stations in the community of Shingletown (PM R27.74) and the Lassen Volcanic National Park Entrance (PM 49.38). Disposal/Borrow Sites Project implementation would include approximately 0.98 acres of ground disturbance; maximum excavation depth is estimated at 12 feet. Excess soil material and construction debris would become the property of the contractor. No disposal and/or borrow sites are proposed. Staging One staging area, PM 63.1 (west bound), has been identified along the project corridor. Utilities Within the project limits, SR 44 supports overhead and underground utilities. Underground utilities may be impacted during culvert replacement activities. Potholing or other positive location methods may be necessary during the design phase to determine if there are conflicts with the proposed culvert work. Right-of-Way Caltrans would acquire temporary construction easements at various locations to accommodate culvert installation. Permanent drainage easements would be required at PMs R27.6 and 28.05. Traffic Management Project construction would utilize one-way reversing traffic control as needed. Schedule The work would be completed in one construction season and would require approximately 160 working days. Consultation/Coordination Caltrans performed a records review, field surveys, and consultation/coordination with applicable agencies, tribes, and individuals. Permits Based on the current scope, the project would be subject to the following resource agency permits: • Army Corps of Engineers Nationwide Permit (Section 404 permit) • Regional Water Quality Control Board Water Quality Certification (Section 401 permit) • California Department of Fish and Wildlife Lake and Streambed Alteration Agreement (Section 1602 Agreement)

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
PLEASURE ISLAND PARKING LOT PAVEMENT IMPROVEMENT PROJECT
Solicitation # P27-002
The City of Port Arthur, Texas, is soliciting bids for the Pleasure Island Parking Lot Pavement Improvement Project, which involves the construction of an asphalt parking lot replacement. The project requires the contractor to provide all necessary labor, materials, equipment, and superintendence to deliver the installation in full operating condition. Key deliverables include the installation of electrical conduits, concrete wheel stops, and the digging and grading of drainage swales, as well as ADA-compliant striping and signage. The work must be completed within 90 calendar days, and the award will be based on the time required for completion and the technical standards of the bid. Bidders must provide a bid guarantee of at least five percent and are required to furnish payment and performance bonds if the contract exceeds 50,000 and 100,000 dollars, respectively. The contract is subject to the Davis-Bacon Act and Executive Order 11246 regarding equal employment opportunity. Additionally, respondents must certify that they do not boycott Israel and are not listed on the Texas Comptroller's website as doing business with Iran, Sudan, or foreign terrorist organizations. A five percent retainage will be held from progress payments until final acceptance of all work. Successful bidders must submit a construction schedule within seven calendar days of notice and a detailed progress schedule and cost breakdown within fifteen days of contract execution.
City of Port Arthur

POSTED

about 12 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS