Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on October 7, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ship Service Diesel Generator Governor Upgrade and Documentation for CGC Smilax in Atlantic Beach, NC 28512

Closed
70Z08522QP45019C0Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
DIBBS
CYLINDER, HYDRAULIC ACC
Solicitation # SPE7M0-27-T-0456
Solicitation SPE7M0-27-T-0456 is a fixed-price request for quotations issued by the DLA Weapons Support Maritime Supply Chain ESOC Buys for one hydraulic accumulator cylinder, NSN 2090-01-450-1199. The item is to be delivered to the Puget Sound Naval Shipyard IMF in Bremerton, Washington, with a required delivery lead time of five days after order. Inspection and acceptance will occur at the destination per FAR 52.246-2. Quotations must be submitted via the DIBBS system by October 30, 2026. The contract mandates strict adherence to technical and quality standards, including Item Unique Identification (IUID) per MIL-STD-130 and DFARS 252.211-7003, and packaging requirements per RP001 and MIL-STD-2073-1E. Technical data for this item is subject to ITAR or EAR export controls, requiring contractors to have approved JCP certification and specific DLA authorizations. Additionally, the hardware must not contain intentionally added mercury, and the government will not evaluate offers utilizing additive manufacturing unless specifically authorized. Compliance with the Buy American Act and the Berry Amendment is required for quotes above the micro-purchase threshold. Evaluation includes a price preference for certified HUBZone Small Business Concerns. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and payment, and adherence to DFARS 252.204-7012 for safeguarding covered defense information.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

1 day ago

DEADLINE

in 4 days
NAICS: 336611
New
Federal
NONSKID FOR NAVAL SHIPS/VESSELS
Solicitation # N4002727R0004
Solicitation N4002727R0004 is a total small business set-aside for a single Indefinite Delivery, Indefinite Quantity (IDIQ) firm fixed price contract to provide nonskid deck covering removal and replacement for U.S. Navy ships and other government vessels. The work will be performed at Naval Station Mayport, Florida, and within 50 miles of the facility. The contract spans five ordering periods from March 15, 2027, through March 14, 2032. The scope includes surface preparation meeting SSPC-SP10/NACE 2, SSPC-SP 11, and SSPC-SP12 WJ-3/NACE 5 standards, with the application of MIL-PRF-24667 Type I, IV, V, or XI nonskid materials. Award will be based on a competitive trade-off source selection process evaluating best value, with a heavy emphasis on past performance involving U.S. Navy surface combatants and price fairness. The contractor must adhere to ASQ/ANSI/ISO 9001:2015 quality standards and utilize the Wide Area WorkFlow (WAWF) system for electronic invoicing. Key requirements include the submission of an Access Control Plan for non-U.S. citizen employees and compliance with CMMC cybersecurity levels and Buy American regulations. Liquidated damages are tailored at two percent per calendar day, capped at ten percent. Proposals are due by November 30, 2026, and must be submitted in three volumes covering price, past performance, and pre-award information.
Southeast Regional Maintenance Center

POSTED

1 day ago

DEADLINE

in 30 days
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 336611
New
Federal
NAVY NP FENDER RENEWAL
Solicitation # 70Z04027Q60514Y00
The U.S. Coast Guard Surface Forces Logistics Center is soliciting quotes for a Firm Fixed Price Purchase Order to perform a rubber fender system renewal on a 108-foot Yard Patrol Craft. The scope of work includes the removal of existing upper and lower fendering, securing bars, and hardware from the exterior hull and transom, followed by the installation of new rubber fenders and associated hardware. Specific requirements include replacing up to 60 linear feet of CRES securing flat bars and 75 linear feet of mounting plates and oak shims, as well as installing new studs, nuts, and washers. The government will provide 24 Type-D black EPDM fenders as government furnished material located at the Coast Guard Yard in Curtis Bay, Maryland, which also serves as the place of performance. This is a total small business set-aside conducted under FAR Part 13 Simplified Acquisition Procedures, with awards based on best value considering technical requirements, deadlines, and price. All work must be completed by December 11, 2026. Quotes must be submitted via email to Erica Gibbs by November 16, 2026, at 9:00 am Eastern. Payment will be processed via Net 30 terms through the IPP system, and no down or advanced payments will be provided. Vendors must be able to secure funding until delivery and may need to be registered in the Joint Certification Program to access export-controlled drawings.
CG-SEA-C23

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a Request for Quote issued by NAVSUP FLC Sigonella Naples Office for firm fixed price non-commercial voyage repair services for the USS RAFAEL PERALTA (DDG 115). The work is to be performed in Mombasa, Kenya, with a period of performance from November 12, 2026, to November 18, 2026. The scope of work includes hull maintenance such as high-pressure fresh water washing, cleaning and inspection of air conditioning and refrigeration plant condensers, rust and corrosion removal, replacement of lagging and insulation, furniture upholstery replacement, and the provision of rigging services and scaffolding. All work must adhere to NAVSEA Standard Items and SCF Part 1915 Occupational Safety and Health Standards for Shipyard Employment. Award will be granted to the lowest priced technically acceptable offeror, with technical capabilities rated as either acceptable or unacceptable. Prospective contractors must submit a completed J-1 Price Breakdown in US dollars, a draft Test and Inspection Plan, and a signed Use and Non-Disclosure Agreement to access restricted technical data. Required submission documentation includes Standard Form 18, completed Standard Form 30 amendments, and technical qualifications verified via the Attachment J-3 checklist. The deadline for proposal submission is November 2, 2026, at 13:00 CET. Post-award invoicing must be processed electronically through Wide Area WorkFlow.
Navsup Flc Sigonella Naples Office

POSTED

1 day ago

DEADLINE

in 1 day
NAICS: 336611
New
Federal
Full & Open Brand Name OEM "Curtiss-Wright Electro-Mechanical Corp" - Low Pressure Air Compressor (LPAC) Maintenance Services
Solicitation # N0040627Q0004
Fleet Logistics Center Puget Sound is soliciting a firm-fixed-price, full and open brand name requirement for Low Pressure Air Compressor (LPAC) maintenance services in support of SRF-JRMC Sasebo, Japan. The scope of work involves providing all labor and genuine OEM parts from Curtiss-Wright Electro-Mechanical Corp to replace the Air End Assembly (Part Number ML12535266G1) for a Dresser-Rand Company Model GSS-200 rotary compressor on the USS SAN DIEGO (LPD-22). Key tasks include disassembly, cleaning, inspection, drive coupling alignment, and an operational test, with all work adhering to Job Specification 38DXA55115-A01 and MIL-STD-162B cleaning standards. Performance is expected to be completed by November 23, 2026. The government will select the most advantageous offer based on technical capability, including the delivery date, past performance, and price, with a 10 percent price evaluation preference for HUBZone small business concerns. Because this is a brand name requirement, offerors must provide OEM documentation establishing the authenticity of parts and services, including traceability and warranties, to be deemed compliant. Invoicing must be processed through Wide Area WorkFlow (WAWF), and all packaging and marking must comply with ASTM-D-3951 and MIL-STD-130. The procurement is categorized under NAICS code 336611 and includes standard FAR and DFARS clauses regarding safety, security, and commercial services.
Navsup Flt Logistics Ctr Puget Sound

POSTED

1 day ago

DEADLINE

in 3 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Atlantic Beach, NC, 28512, USA

Set-Aside

SBA

Documents

1
DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts1 person available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA
Contacts

Full Description

Show more
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. Request for Quotations number is 70Z08522QP4501900 and is issued as a request for quotations (RFQ). This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued. This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-84 dated Nov 1, 2015. The NAICS Code is 336611. The Small Business Size Standard is 1250. This is a total small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5. **For purposes of evaluation and award, Past Performance is considered to be more important than Price. Offerors shall submit quotes as follows - Date: OCTOBER 11TH, 2021 Time: 0800 Pacific Standard Time (PST) Place: contact@example.gov REQUIRED DOCUMENTS: Each Offeror shall furnish the information required by the solicitation, which includes: Section 1: Price quote including cost breakdown. Section 2: Past Performance / References Proposal (This section should include the offerors completed representations and certifications.); and Section 3: Any issued amendments to the solicitation. ANTICIPATED AWARD DATE: The contract is expected to be awarded on or about 10/11/2021. QUESTIONS: The last day to ask questions will be OCTOBER 11th, 2021, 0800 Pacific Standard Time (PST). Questions shall be submitted via e-mail to contact@example.gov. After this date, unless amended, questions will not be accepted. For information regarding this solicitation, please contact WILLIAM SWORD, +1 (555) 000-0000. Please Note: Amendments to this solicitation will be publicized in the same manner as the initial synopsis and solicitation. Questions and quotes shall be emailed to contact@example.gov. Contractors are responsible for verifying receipt of quotes. INTERESTED VENDORS PLEASE SEND OFFICIAL QUOTE, WITH A SAM.GOV REGISTERED DUNS NUMBER, AND EMAIL TO contact@example.gov. STATEMENT OF WORK (SOW) FOR SHIP SERVICE DIESEL GENERATOR (SSDG) GOVERNOR UPGRADE AND DOCUMENTATION[DRACUS(1] SMILAX obtained information from Woodward vendor that upon failure they will have to upgrade to the new 2301E speed control. The ship is currently non-operational and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW). 1.0 GENERAL Background The 100 WLIC asset, USCGC SMILAX, has two Ship Service Diesel Generators (SSDGs) with a 2301D governor for which the Original Equipment Manufacturer (OEM) is Woodward. CGC SMILAX was previously notified by Woodward that the 2301D speed control device is obsolete and that any technical issues should be resolved by upgrading to the manufacturer's replacement device, model 2301E. CGC SMILAX is currently inoperable and this replacement needs to be made as soon as possible to minimize negative impact to their Operational Commander. Scope The scope of this contract is defined by the efforts and tools required to support USCGC SMILAX (WLIC 315). The Contractor shall perform a governor upgrade and return the system to full functionality. Replacement parts, if needed, are available through the Coast Guard's warehouse in Baltimore, MD. Additional parts which are not in stock and determined to be essential to meet the objective can be acquired from the vendor, at cost, under this contract. OBJECTIVE The goal is to return CGC SMILAX to Fully Mission Capable (FMC) status and ensure technical documentation reflects any changes. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to SMILAX's Operational Commander. Once these goals are achieved, the Coast Guard will apply lessons learned to any similar assets with the Woodward 2301D governor. APPLICABLE DOCUMENTS Compliance Documents The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract: Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2020, General Requirements Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3041, 2020, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, 2020, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation. Reference Documents The following documents may be helpful to the Contractor in performing the work described in this document: Coast Guard Drawing (CGDWG) 180-TE-6201-003, Rev C, MAY 2015, Paralleling Switchboard Coast Guard Drawing (CGDWG) 180-TE-6202-009, Rev J, MAY 2015, Electrical Distribution One Line Diagram Coast Guard Technical Publication (CGTP) 4302, SWBS 311, Section A, OCT 2021, Digital Load Sharing and Speed Control, Model-2301E, Installation and Operation Manual Coast Guard Technical Publication (CGTP) 4685, SWBS 311, Section B, SSDG - Generator Set - Installation Manual Coast Guard Technical Publication (CGTP) 4685, SWBS 311, Section C, SSDG - Generator Set - Operator's Manual Coast Guard Technical Publication (CGTP) 4685, SWBS 311, Section D, SSDG - Generator Set - Parts Catalog SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site technical support for USCGC SMILAX (WLIC 315) at its current location in Atlantic Beach, NC. In some instances, such as with the trip report, the Contractor may complete work upon return to the home office. Existing power generation equipment is as follows: Part No. Mfr Model No. Serial No. Serial No. #1 SSDG Cummins-Onan MDGDA-5588039 L020451190 75 kW, 450 VAC, 3?, 60 Hz #2 SSDG Cummins-Onan MDGDA-5588039 L020451191 75 kW, 450 VAC, 3?, 60 Hz 2.1 Upgrade System and Components The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. If any additional parts need to be acquired from the warehouse, they need to be requested as early as possible. 2.1.1 Identify any part(s) which require replacement, in addition to the Woodward 2301D governor. 2.1.2 Remove and dispose of the existing Woodward 2301D governor, and any other parts approved for replacement. 2.1.3 Install the replacement Woodward 2301E governor, and any other parts approved for replacement. Document the changes. See Section 2.2 below. 2.1.4 Configure firmware (FW) and/or necessary software (SW). Document the changes. See Sections 2.2 and 2.3 below. 2.1.5 Test the SSDGs in all possible power configurations (e.g. each individually and both in parallel) to confirm functionality. Document the results. See Section 2.4 below. 2.2 Document Changes The Contractor shall configure all components in accordance with OEM guidance and established industry best practices. 2.2.1 The Contractor shall reference Reference Documents 1.4.2 when working onboard the asset(s). The Coast Guard will make available copies of the existing Tech Pub and Drawing for this system. While performing work, if the Contractor notices discrepancies between the documented guidance and their best practices, it shall be annotated. Obsolete or inaccurate information must be corrected by Coast Guard personnel after the site visit. 2.2.2 The Contractor shall submit all documented changes to equipment, including settings and values used in FW/SW, by - red-lining Reference Documents 1.4.2 to show the final wiring detail and configuration. - Red-lining can be done in electronic or paper format, to mark parts or wires which are removed, installed, or changed. 2.2.3 The Contractor shall provide supplemental and updated documentation applicable to the configuration to be added to Reference Documents 1.4.2. 2.3 Configure and Program Woodward 2301E may require calibration and programming before, during, or after the installation. 2.3.1 The Contractor shall determine how to restore system functionality and then program settings accordingly. 2.3.2 The Contractor shall provide their own standalone laptop and cables to connect to the governor. 2.3.3 Copies of the configuration files, if available, shall become property of the Government. 2.4 Test Thoroughly and Document The Contractor shall ensure the system is fully functional by testing all probable SSDG changes and configurations. The system passes testing when tests are completed with no errors or unexplained behavior. 2.4.1 The Contractor shall provide a trip report documenting all findings no later than one week after returning to the home office. 2.4.2 The Contractor shall include in the trip report any system and design changes made during the visit. 3.0 CONTRACTOR PERSONNEL The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. 3.1 Qualified Personnel In order to minimize operational impacts, the Coast Guard immediately requires the services of technicians who are considered SMEs with Woodward products and power generation equipment. The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. 3.2 Continuity of Support The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer's Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement. 3.3 Employee Identification 3.3.1 Contractor employees visiting Government facilities shall wear an identification badge that, at a minimum, displays the Contractor name, the employee's photo, name, clearance-level and badge expiration date. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent and display all identification and visitor badges in plain view above the waist at all times. 3.3.2 Contractor employees working on-site at Government facilities shall wear a Government issued identification badge. All Contractor employees shall identify themselves as Contractors when their status is not readily apparent (in meetings, when answering Government telephones, in e-mail messages, etc.) and display the Government issued badge in plain view above the waist at all times. OTHER APPLICABLE CONDITIONS 4.1 Period of Performance - The period of performance for this contract shall not exceed 15 calendar days from the date of award. 4.2 PLACE OF PERFORMANCE The primary place of performance will be the Department of Homeland Security on CGC SMILAX at 2301 E. Fort Macon Rd. Atlantic Beach, NC 28512 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Officer (EO) as scheduling is subject to ship's operations. 4.4 Travel Contractor travel may be required to support this requirement. All travel required by the Government outside the local commuting area(s) will be reimbursed to the Contractor in accordance with the Federal Travel Regulations. The Contractor shall be responsible for obtaining COR approval (electronic mail is acceptable) for all reimbursable travel in advance of each travel event. 4.5 Daily Progress Reports The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and Commanding Officer upon arrival at the asset each morning of the visit. This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work. 4.6 General Report Requirements The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows XP and Microsoft Office Applications). Drawings shall be provided in the latest versions of both AutoCAD and Adobe PDF files. 5.0 GOVERNMENT FURNISHED RESOURCES The Government will provide the workspace necessary to perform the on-site portion of Contractor services required in this contract, unless specifically stated otherwise in this work statement. The Government will also provide copies of the references cited in Section 1.4 upon Contractor arrival. The Contractor shall use Government furnished information, data and documents only for the performance of work under this contract, and shall be responsible for returning all Government furnished information, data and documents to the Government at the end of the performance period. The Contractor shall not release Government furnished information, data and documents to outside parties without the prior and explicit consent of the Contracting Officer (KO). 6.0 CONTRACTOR FURNISHED PROPERTY The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0. GOVERNMENT ACCEPTANCE PERIOD The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted. 7.1 Corrections The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor's accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions. 7.2 Timeliness of Corrections The COR will have 15 business days to review deliverables and make comments. The Contractor shall have 15 business days to make corrections and redeliver. 7.3 All other review times and schedules for deliverables shall be agreed upon by the parties based on the final approved Project Plan. The Contractor shall be responsible for timely delivery to Government personnel in the agreed upon review chain, at each stage of the review. The Contractor shall work with personnel reviewing the deliverables to assure that the established schedule is maintained. 8.0 DELIVERABLES The Contractor shall consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the COR prior to proceeding to next deliverable or event in this SOW. ITEM SOW REFERENCE DELIVERABLE / EVENT DUE BY DISTRIBUTION 1 2.2.1 Equipment or Document Discrepancies 14 cal days post visit KO and COR 2 2.2.2 Red-lines to Reference Documents 1.4.2. 14 cal days post visit KO and COR 3 2.2.2 Supplemental and updated documentation to be added to Reference Documents 1.4.2. 14 cal days post visit KO and COR 4 2.3.3 Copies of the governor configuration files. 4 days post visit KO and COR 5 2.4.1 & 2.4.2 Trip report documenting all findings 7 cal days post visit KO and COR [DRACUS(1]You can change if needed.

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS