Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 29, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoreline Erosion Control Green River Lock and Dam #1

Awarded
W912QR20Q0142Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract, solicitation number W912QR20Q0142, tasks a contractor with performing shoreline erosion control at the Green River Lock and Dam 1 located in Reed, Kentucky. The selected contractor is responsible for all planning, administration, management, and supervision required to ensure the project adheres to the provided scope of work, specifications, and all applicable federal, state, and local laws. The project timeline requires work to commence within 14 calendar days of receiving the Notice to Proceed, with a total performance duration of 45 calendar days. This procurement is a total small business set-aside under NAICS code 212312, managed by the Department of Defense through the USACE Endist Louisville office.

General Info

Contract Value

$93,211

NAICS

212312 - Crushed and Broken Limestone Mining and Quarrying

Place of Performance

Reed, KY, 42451, USA

Set-Aside

SBA

Award Issued Date

Documents

1

W912QR20Q0142.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Louisville
Contacts1 person available
OfficeLOUISVILLE, KY, 40202-2230, USA
Office AddressLOUISVILLE, KY, 40202-2230, USA

Full Description

Show more
Contractor shall perform Shoreline Erosion Control at Green River Lock and Dam 1 in accordance with the attached scope of work. The contractor's work and responsibility will include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will begin within 14 calendar days after the receipt of the Notice to Proceed (NTP) and will conclude 45 calendar days after work has started. Location: United States Corps of Engineers Green River Lock #1 5084 Dam &Lock Road Reed, KY 42451 This procurement is 100% set-aside for Small Business, NAICS 212312, Size Standard 750 employees.

More opportunities from Department Of Defense → W072 Endist Louisville

Same awarding agency

NAICS: 237110
New
Federal
Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP)
Solicitation # W912QR27BA003
Solicitation W912QR27BA003 is a Design-Bid-Build project for the demolition and construction of the Axtel Wastewater Treatment Plant (WWTP) at Rough River Lake in McDaniels, Kentucky. The scope of work requires the contractor to remove the existing WWTP and fencing and install a new Aerobic Treatment Unit (ATU) and Drip Field System. This unrestricted procurement is estimated to have a construction magnitude between 1 million and 5 million dollars, with the award based on the lowest evaluated price. A 10 percent price evaluation preference will be applied to eligible HUBZone small business concerns. The contract is a Firm-Fixed-Price agreement under NAICS code 237110, with a total project duration of 400 calendar days from the Notice to Proceed. Performance is scheduled from December 18, 2026, to January 22, 2028, with a requirement to commence work within 10 calendar days of the notice. Key requirements include the submission of a Construction Quality Control (CQC) plan within 30 days of the notice to proceed, adherence to Davis-Bacon Act wage rates, and the provision of a Site Safety Health Officer. Liquidated damages for delays are set at 500 dollars per calendar day. Proposals must be submitted electronically via the PIEE Solicitation Module by the December 3, 2026, deadline.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Federal
Request for Information/Market Intelligence Notice: Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA) - Fort Hunter-Liggett Water System Improvements
Solicitation # W912QR-PDB-FHLWATER
The U.S. Army Corps of Engineers, Louisville District, is seeking market intelligence through a Request for Information for the restoration and modernization of potable water and wastewater collection systems at Fort Hunter Liggett. With an estimated acquisition magnitude of 70 to 80 million dollars, the project scope includes the design and construction of a new tank farm with at least 2 million gallons of storage, a new transmission main, upgrades to water supply wells, modernized SCADA infrastructure, and the rehabilitation of sanitary sewer lines and treatment plant lagoons. All work must adhere to NSPC, UFC, and NFPA criteria to address aging infrastructure and operational deficiencies. The government is evaluating a Progressive Design Build strategy utilizing an Other Transaction Agreement under 10 U.S.C. section 2808a. This proposed approach would involve a qualifications-based selection process consisting of a statement of qualifications and pitch meetings. The award would be structured in two phases: an initial design and pre-construction phase followed by a construction phase based on an agreed-upon Guaranteed Maximum Price. Interested parties under NAICS code 237110 must submit their company profiles, collaborative delivery experience, and technical feedback via the designated online survey form by November 3, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS